B 12 istqb 6 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about B 12 istqb 6? On this page you'll find 2 study documents about B 12 istqb 6.

All 2 results

Sort by

Bộ 12 đề ISTQB- Đề 6  Questions and Answers New (2024/2025) Solved 100% Correct
  • Bộ 12 đề ISTQB- Đề 6 Questions and Answers New (2024/2025) Solved 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • 1. Which following is NOT the indicators of maintenance testing? A. Retirement B. Creation C. Modification D. Migration - ️️B 2. Debugging and testing are different. Dynamic testing can show failures that are caused by defects. Debugging is the development activity that find, analyzes and removes the cause of the failure. Which of the following is an example of debugging? A. A tester retests a fix from the developer and finds a regression B. A developer performs unit testing C. A t...
    (0)
  • $7.99
  • + learn more
De 4 COMPUTER SCIENCE/ SOFTWARE ENGINEERING EXAM ALL SOLUTION LATEST UPDATE 2024 EDITION GUARANTEED GRADE A+
  • De 4 COMPUTER SCIENCE/ SOFTWARE ENGINEERING EXAM ALL SOLUTION LATEST UPDATE 2024 EDITION GUARANTEED GRADE A+

  • Exam (elaborations) • 35 pages • 2024
  • Question #1 (3 Points) You are the Test Manager working on a project developing a tourist information mobile application. The project recently switched to an agile process and test-driven development. Each development cycle lasts 15 days, with daily builds beginning at day 7. After day 10, no new features are allowed to be added. The development team is composed of very experienced team members, who are proud of their work, but not tolerant of the testing team. The requirements are written dow...
    (0)
  • $16.29
  • + learn more