Bottom up estimating - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Bottom up estimating? On this page you'll find 407 study documents about Bottom up estimating.
All 407 results
Sort by
-
Obstetrics/ Maternity Practice Exam 103 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 42 pages • 2024
-
- $11.49
- 2x sold
- + learn more
Obstetrics/ Maternity Practice Exam 103 Questions with Verified Answers 
 
The nurse is preparing a client with a term pregnancy who is in active labor for an amniotomy. What equipment should the nurse have available at the client's bedside? (Select all that apply.) 
 
A. litmus paper 
B. fetal scalp electrode 
C. a sterile glove 
D. an amniotic hook 
E. sterile vaginal speculum 
F. a doppler - CORRECT ANSWER C. A sterile glove 
D. An amniotic hook 
F. A doppler 
 
A single sterile glove, an am...
-
Maine Sea Kayak Guide Licences (Ocean Dynamics) Questions and Answers 100% Solved correctly
- Exam (elaborations) • 2 pages • 2024 Popular
- Available in package deal
-
- $7.99
- 1x sold
- + learn more
onshore wind - wind that blows from the sea towards the land 
Venturi effect - wind flowing through a restricted space and increases wind speed. 
Questions when in big waves - Can we see out clients? Can they stay upright? Where might the 
wave break? 
Wavelength - Horizontal distance between the crests or between the troughs of two adjacent 
waves 
wave height - the vertical distance from the crest of a wave to the trough 
wave period - the time required for corresponding points on consecutive ...
-
IT 343 Midterm Exam | Verified with 100% Correct Answers
- Exam (elaborations) • 20 pages • 2024
-
- $19.49
- 1x sold
- + learn more
IT 343 Midterm Exam | Verified with 100% Correct Answers What is project management? A. The ability to complete a task within a given amount of time B. The ability to complete a task within a given budget C. The ability to manage a temporary endeavor to create a unique product or service, on time and within budget D. The ability to administer a series of chronological tasks within a given amount of time and under budget All of the following are project management process groups except for whi...
-
APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam Questions & Answers Test Bank_2023.
- Summary • 59 pages • 2023
-
- $13.49
- 3x sold
- + learn more
APM - PFQ (PFQ) Practice Tests/ APM PFQ Exam Questions & Answers Test Bank_2023. 
 
 
Which of the following is not a stage in an issue resolution process? 
a. Share the issue with stakeholders. 
b. Track the issue to closure. c. Escalate to the sponsor. 
d. Apply change control. 
 
 
Which of the following are challenges for a project manager developing and leading a project team? 
1) Issues and incompatibility amongst team members 
2) Getting the right skills and attributes amongst team me...
-
PRM3701 ASSESSMENT 2 SEMESTER 2 2024 Which of the following does NOT help describe a bottom-up estimating approach? a. They are made by someone who uses experience and/or information from someone else to determine overall project cost and duration.
- Exam (elaborations) • 60 pages • 2024
-
- $2.99
- + learn more
PRM3701 ASSESSMENT 2 SEMESTER 2 2024 
 
 Which of the following does 
NOT help describe a bottom-up estimating approach? 
 a. They are made by someone who uses experience and/or information from someone else to determine overall project 
 cost and duration. 
 b. They establish low-cost, e cient methods for completing activities. 
 c. They typically come from the people actually doing the work and who are most knowledgeable about the task at hand. 
 d. Estimates are made at the work package leve...
Make study stress less painful
-
APM PMQ Exam Revision Questions With Verified Answers
- Exam (elaborations) • 80 pages • 2023
- Available in package deal
-
- $14.49
- 1x sold
- + learn more
What are the five criteria for a successful project? - Answer Time, cost, quality, risk & benefits 
 
Project Management - Answer The application of processes, methods, knowledge, skills and experience to achieve the project objectives 
 
Programme Management - Answer The coordinated management of projects and change manage activities to achieve beneficial change 
 
Project Success - Answer The satisfaction of stakeholder needs measured by the success criteria as identified and agreed at the sta...
-
APM Fundamentals Qualification Question and answers already passed 2024/2025
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
APM Fundamentals Qualification Question and answers already passed 2024/2025 APM Fundamentals Qualification 
 
Acceptance criteria - correct answer The requirements and essential conditions that have to be achieved before a deliverable is accepted. 
 
Activity - correct answer (1) A task, job, operation or process consuming time and possibly other resources. 
(2) The smallest self-contained unit of work in a project. 
 
Adoption - correct answer The optional additional phase in a linear ...
-
UCF Final Exam Questions & Answers 2024/2025
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
UCF Final Exam Questions & Answers 2024/2025 
 
 
Parametric Models - ANSWERSyou calculate work and cost based on some measure, like the number of square feet for construction 
 
The Delphi Technique - ANSWERSA decision-making technique in which group members do not meet face-to-face but respond in writing to questions posed by the group leader. 
 
Top-down estimating - ANSWERSEstimate phases or major components and then break those estimates into smaller pieces until you get individual tasks 
 ...
-
OMIS 690 Exam 2 || with 100% Error-free Solutions.
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $11.29
- + learn more
Work Breakdown Structure correct answers Provides a hierarchical structure that outlines the activities or work that needs to be done in order to complete the project scope. 
 
Work Breakdown Structure correct answers provides a bridge or link between the project's scope and the detailed project plan that will be entered into a project management software package. 
 
Milestones correct answers significant event or achievement that provides evidence that that deliverable has been completed or th...
-
Project management Exam 2 Pro Test Exam And Answers Solved 100% 2024.
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
C. Estimating - Answer The process of forecasting or approximating the time and cost of completing project deliverables is 
A. Budgeting 
B. Predicting 
C. Estimating 
D. Planning 
E. Guesstimating 
 
In practice, estimating processes are frequently classified as - Answer Top down/bottom up 
 
A typical statement in actual practice is that estimates should have a probability of being met ______ of the time. - Answer 95% 
 
A good starting point for developing time and cost estimates is - ...
-
Test Bank for Ecology: The Economy of Nature 9th Edition by Rick Relyea
- Exam (elaborations) • 443 pages • 2023
-
- $29.49
- 8x sold
- + learn more
Test bank for Ecology: The Economy of Nature 9e 9th Edition by Rick Relyea. ISBN-13: 5542 
 
Full Chapters test bank included 
 
Chapter 1 An Introduction to Ecology 
1.1 Ecological Systems Exist in A Hierarchy of Organization 
Individuals 
Populations 
Communities 
Ecosystems 
The Landscape 
The Biosphere 
1.2 Physical and Biological Principles Govern Ecological Systems 
Conservation of Matter and Energy 
Dynamic Steady States 
Evolution 
1.3 Different Organisms Play Diverse Roles in Ecological...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia