Cdfm module 4 stuvia - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cdfm module 4 stuvia? On this page you'll find 4 study documents about Cdfm module 4 stuvia.

All 4 results

Sort by

CDFM-A Module 4 - Chapter 3 Questions &Answers(RATED A)
  • CDFM-A Module 4 - Chapter 3 Questions &Answers(RATED A)

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • What is an affordability assessment? -ANSWER An assessment of the degree to which the life cycle cost of an acquisition program is in consonance with the long-range modernization, force structure, and manpower plans of the individual DoD components, and the department as a whole. Affordability assessments are typically conducted: -ANSWER By resource Analysts in the DoD Component Headquarters of supporting organization. For MDAS and MIAS, Affordability Assessments are required at: -ANSWER M...
    (0)
  • $11.49
  • + learn more
CDFM Module 4 QUESTIONS|ANSWERS(RATED A)
  • CDFM Module 4 QUESTIONS|ANSWERS(RATED A)

  • Exam (elaborations) • 12 pages • 2023
  • What is JCIDS (Joint Capabilities Integration and Development System)? - ANSWERSassesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System - ANSWERSProcess by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? - ANSWERSMateriel Development Decision What are the two steps in pre-systems acquisition? - ANSWERSMateriel so...
    (0)
  • $9.99
  • + learn more
CDFM MODULE 4 AREA 1 Questions With Correct Answers
  • CDFM MODULE 4 AREA 1 Questions With Correct Answers

  • Exam (elaborations) • 2 pages • 2023
  • Available in package deal
  • What is the POM - ANSWERThe programming phase begins with the Program Objective Memorandum (POM). It provides a fairly detailed and comprehensive description of the proposed programs, including allocation of resources by program projected six years into the future. What is an RMD - ANSWERFunding shortfalls in the POM and propose alternatives with marginal adjustments to resources. Issues not resolve at a lower level are forward to the secretary for decision. The results are published in the R...
    (0)
  • $8.49
  • + learn more
CDFM-A Module 4 equations Questions & Answers
  • CDFM-A Module 4 equations Questions & Answers

  • Exam (elaborations) • 1 pages • 2023
  • Available in package deal
  • BCWP/EV -ANSWER Budgeted cost of Work Performed ACWP -ANSWER Actual Cost of Work Performed BCWS -ANSWER Budgeted cost of Work Scheduled CV Cost Variance -ANSWER CV=BCWP-ACWP SV Scheduled Variance -ANSWER SV=BCWP-BCWS VAC Variance at Completion -ANSWER