Cosc 153 qa - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 153 qa? On this page you'll find 8 study documents about Cosc 153 qa.
All 8 results
Sort by
-
COSC 153 EXAM 1 Q&A 100% VERIFIED
- Exam (elaborations) • 16 pages • 2023
-
- $9.99
- + learn more
COSC 153 EXAM 1 Q&A 100% VERIFIED 
master builder - ANSWER In ancient Egypt, architecture, engineering, and construction 
were all the responsibility of one person, called? 
residential, commercial, heavy civil, industrial, & environmental - ANSWER 5 sectors 
of the construction industry? 
owner, designers, & contractors - ANSWER 3 primary players in an construction 
project? 
multi-family dwellings - ANSWER apartments, condos, & townhomes are referred to 
as? 
Architects & engineers - ANSWE...
-
COSC 153 Midterm Q&A CORRECT ANSWERS UPDATED
- Exam (elaborations) • 18 pages • 2023
-
- $10.99
- + learn more
COSC 153 Midterm 
Q&A CORRECT 
ANSWERS 
UPDATED 
Aggregate - ANSWER Mixture of sand and stone & is a major component of concrete 
Architect - ANSWER One who has completed a course of study in building and design 
and draws up plans 
Backing - ANSWER Frame lumber or metal installed between the wall studs to give 
additional support for drywall or an interior trim related item (such as handrail brackets, 
cabinets, towel bars). Items are screwed and mounted into solid wood or metal rather 
th...
-
COSC 153 Midterm CORRECT Q&A
- Exam (elaborations) • 15 pages • 2023
-
- $9.99
- + learn more
COSC 153 Midterm CORRECT 
Q&A 
What are the construction industry sector's 
commercial, residential/multi family, specialty subcontractor, heavy civil 
infrastructure, industrial/oil and gas, consulting/facilities management/CM 
What are general contractors in construction in charge of 
overall project schedule, payment from owners and paying subcontractors, 
site logistics for all projects, coordination with owner, architects and 
engineers, coordination with owners representative 
residen...
-
COSC 153 Exam 2 Q&A VERIFIED
- Exam (elaborations) • 6 pages • 2023
-
- $7.99
- + learn more
COSC 153 Exam 2 Q&A 
VERIFIED 
What are the 4 design stages? - ANSWER Programming Stage, Schematic Design, 
Design Development, Construction Documents 
Programing Stage - ANSWER Written statement of the requirements that identify 
important information. Happens prior to start 
Schematic Design - ANSWER Create a basic design identifying shape and size of 
spaces, as well as alternatives, types of product, and more involvement from designer 
Design Development - ANSWER Development of a design w...
-
COSC 153 Q&A
- Exam (elaborations) • 7 pages • 2023
-
- $7.99
- + learn more
COSC 153 Q&A 
6 main Construction Industry Sectors - ANSWER - Commercial 
- Residential/Multifamily 
- Specialty Subcontractor - Heavy Civil Infrastructure - Industrial / Oil & Gas - Consulting 
/ Facilities - Management / CM 
General Contractors who may or may not self perform any actual construction work In 
charge of: - ANSWER - Overall Project Schedule 
- Payment from Owners and paying subcontractors 
- Site Logistics for all project 
- Overall safety of workers 
- Coordination with Owner...
As you read this, a fellow student has made another $4.70
-
COSC 153 – final Q&A Correctly Answered
- Exam (elaborations) • 9 pages • 2023
-
- $8.99
- + learn more
COSC 153 – final Q&A 
Correctly Answered 
Is Price a selection the ONLY consideration when using the 
Qualifications Based Selection? 
false (qualifications) 
Which construction phase has more subcontractors involved? 
interior 
A mixture of sand and stone and a major component of concrete 
is _____________ 
aggregate 
The amount of labor, materials, and other costs that a contractor 
anticipates for a project as summarized in the contractor's bid 
proposal for the project is called 
est...
-
COSC 153 Q&A
- Exam (elaborations) • 3 pages • 2023
-
- $5.99
- + learn more
COSC 153 Q&A 
6 main Construction Industry Sectors - ANSWER - Commercial 
- Residential/Multifamily 
- Specialty Subcontractor - Heavy Civil Infrastructure - Industrial / Oil & Gas - Consulting 
/ Facilities - Management / CM 
General Contractors who may or may not self perform any actual construction work In 
charge of: - ANSWER - Overall Project Schedule 
- Payment from Owners and paying subcontractors 
- Site Logistics for all project 
- Overall safety of workers 
- Coordination with Owner...
-
COSC 153: Exam I Q&A 1005 Correct
- Exam (elaborations) • 4 pages • 2023
-
- $6.99
- + learn more
COSC 153: Exam I Q&A 1005 Correct 
The Master Builder - ANSWER there was no distinction between the architect, engineer 
and builder, it was one person that did it all 
open bid - ANSWER used for public projects; the project must be publicly advertised 
and anybody can submit a bid; typically has bonds to ensure the contactor will be able 
to perform the work 
public work - ANSWER initiated by government agencies; funded by tax dollars 
private work - ANSWER funding comes from private sources...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia