Cosc 275 exam 2 palmer Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 exam 2 palmer? On this page you'll find 31 study documents about Cosc 275 exam 2 palmer.

All 31 results

Sort by

COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Popular
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Estimating: The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: Measured amounts of construction...
    (0)
  • $30.49
  • 3x sold
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Hard bid low price Correct answer-Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Correct answer-Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule
    (0)
  • $11.99
  • + learn more
COSC 275 Exam 2 Palmer; Questions and  Answers % Correct
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer; Questions and Answers % Correct Measures Correct answer-1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle Correct answer-Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle Correct answer-Area: B*1/2H
    (0)
  • $11.99
  • + learn more
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Hard bid low price - answerOwner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - answerInvolves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR - answerConstruction m...
    (0)
  • $11.49
  • + learn more
COSC 275 Exam 2 Palmer With Complete Solution
  • COSC 275 Exam 2 Palmer With Complete Solution

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer With Complete Solution...
    (0)
  • $13.99
  • + learn more
COSC 275 EXAM 2 PALMER  QUESTIONS & ANSWERS SCORED A+ TO PASS!!
  • COSC 275 EXAM 2 PALMER QUESTIONS & ANSWERS SCORED A+ TO PASS!!

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Girder - Answer-A large principal beam of steel, reinforced concrete, wood, or a combination of these, used to support other structural members at isolated points along its length Anchor Bolt - Answer-A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or machinery Beam - Answer-A structural member that primarily resists loads applied laterally to the axis Column - Answer-A long, relatively slender, supporting pillar. A column is usually loaded axially in compr...
    (0)
  • $7.99
  • + learn more
COSC 275 Exam 2 Palmer Questions and Correct  Answers
  • COSC 275 Exam 2 Palmer Questions and Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • Hard bid low price Answer- Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Answer- Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR Answer- Construction manager hired in design phase to assist designer in const...
    (0)
  • $10.49
  • + learn more
COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025  | Graded A+
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer | Questions and Answers | Latest Update | 2024/2025 | Graded A+ 1 kg= ___ lbs 2.2046 1 sq M= ___ sq ft 10.764 1"= ___ millimeters 25.40 4 types of envelope construction Tilt Wall Stud with veneer Masonry Glass A 10' W18x48 Beam weighs how much? (in tons) 10x48 = 480 lbs 480/2000 = .24 tons Air Barrier A component of the envelop system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and flui...
    (0)
  • $10.28
  • + learn more
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Questions And Answers 100% Verified. Measures - answer1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - answerCircumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - answerArea: B*1/2H Masterformat 2004: 00 - answerProcurement and Contracting Requirements Masterformat 2004: 01 - answerGeneral Requirements Masterformat 2004: 02 - answerExisting Conditions Masterformat 2004: 03 - ans...
    (0)
  • $10.49
  • + learn more
COSC 275 Exam 2 Palmer quizzes and answers 2024
  • COSC 275 Exam 2 Palmer quizzes and answers 2024

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Hard bid low price - Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR - Construction manager hired in design phase to assist designer in constructability. CM a...
    (0)
  • $13.49
  • + learn more