Cslb test 5 exam Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cslb test 5 exam? On this page you'll find 43 study documents about Cslb test 5 exam.

All 43 results

Sort by

CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024 Popular
  • CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024

  • Exam (elaborations) • 24 pages • 2023
  • Available in package deal
  • CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024. Which act establishes the rights of workers to organize into unions and negotiate contracts? - Answer National Labor Relations Act of 1935 A contractor has had a problem with employees stealing tools and equipment from job sites. When conducting job interviews, may the contractor ask prospective employees about their arrest records? A. It is legal to ask prospective employees about arrests not leading to convic...
    (1)
  • $14.49
  • 3x sold
  • + learn more
CSLB Test 5 Exam | Questions and Answers  Graded A+ Latest 2024/2025
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 34 pages • 2024
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025 Where the voltage between conductors exceeds 300 volts, the minimum clearance of service drop conductors from flat roof structures is at least a. 3' b. 4' c. 8' d. 10' 8' Service conductors must have a clearance of not less than __ from windows a. 3' b. 4' c. 8' d. 10
    (0)
  • $20.49
  • + learn more
CSLB Test 5 Exam | Questions and Answers  Graded A+ Latest 2024/2025
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 34 pages • 2024
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025 Where the voltage between conductors exceeds 300 volts, the minimum clearance of service drop conductors from flat roof structures is at least a. 3' b. 4' c. 8' d. 10' 8' Service conductors must have a clearance of not less than __ from windows a. 3' b. 4' c. 8' d. 10' 3' An appliance on a 20-amp branch circuit may not draw more than a. 5 amps b. 12 amps c. 16 amps d. 20 amps 16 amps What is the ...
    (0)
  • $12.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 49 pages • 2024
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 In order to install electric fire alarms you must have a - CORRECT ANSWER C-10 electrical license Contractor must notify registrar of a change in address in - CORRECT ANSWER 90 days Inactive license renewal - CORRECT ANSWER 4 years Active license renewal - CORRECT ANSWER 2 years Expired license renewal - CORRECT ANSWER 5 years GC has ____ days to pay subs - CORRECT ANSWER 7 Number of wo...
    (0)
  • $7.99
  • + learn more
AAVSB Practice Tests (all combined) Questions with correct Answers
  • AAVSB Practice Tests (all combined) Questions with correct Answers

  • Exam (elaborations) • 56 pages • 2024
  • Available in package deal
  • Exam (elaborations) Business and Law Test California CSLB Questions and Answers 2024 Exam (elaborations) C-27 LAW QUESTIONS WITH CORRECT ANSWERS 2024 Exam (elaborations) CA Contractor's Law and Business Test 4 Questions and Answers Exam (elaborations) CA Contractors license test questions Business and Law Questions and Answers 2024 Exam (elaborations) CALIFORNIA CONTRACTORS LICENSE LAW QUESTIONS WITH CORRECT ANSWERS 2024 Exam (elaborations) California Contractors ...
    (0)
  • $20.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 49 pages • 2024
  • Available in package deal
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 In order to install electric fire alarms you must have a - CORRECT ANSWER C-10 electrical license Contractor must notify registrar of a change in address in - CORRECT ANSWER 90 days Inactive license renewal - CORRECT ANSWER 4 years Active license renewal - CORRECT ANSWER 2 years Expired license renewal - CORRECT ANSWER 5 years GC has ____ days to pay subs - CORRECT ANSWER 7 Number of wo...
    (0)
  • $12.49
  • + learn more
C-30 Roofing Trade Practice Test 5 Practice questions for the CSLB C-39 Roofing Exam Questions With Complete Solutions
  • C-30 Roofing Trade Practice Test 5 Practice questions for the CSLB C-39 Roofing Exam Questions With Complete Solutions

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • C-30 Roofing Trade Practice Test 5 Practice questions for the CSLB C-39 Roofing Exam Questions With Complete Solutions
    (0)
  • $10.99
  • + learn more
CSLB C10 Test 1 exam part 1/2/3/4 Exam |  Questions and Answers Graded A+ Latest  2024/2025
  • CSLB C10 Test 1 exam part 1/2/3/4 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 25 pages • 2024
  • CSLB C10 Test 1 exam part 1/2/3/4 Exam | Questions and Answers Graded A+ Latest 2024/2025 What is the minimum working clearance from an electrical panel under 600 V? 36" Voltage drop in wire is a function of: Wire gauge, Length of wire, Current flow in the wire A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day? 156 Where may you use nonmet...
    (0)
  • $12.49
  • + learn more
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)
  • CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)

  • Exam (elaborations) • 24 pages • 2023
  • CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers). A general contractor has obtained bids from several subcontractors for a private project. He notices that one bid is substantially lower than the rest. Is it ethical and a good business practice for this contractor to inform the subcontractor that the bid is substantially lower than the bids of the other subcontractors? - Answer Yes. If the contractor has reason to believe that the subcontractor has made an error in ...
    (0)
  • $18.49
  • + learn more