Cyb 210 7 2 project one - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cyb 210 7 2 project one? On this page you'll find 19 study documents about Cyb 210 7 2 project one.
All 19 results
Sort by
-
CYB-210 Project One Computer Network Modification, CYB-210 Computer Networking Project Two Network Diagram and Rationale & CYB-210 7-2 Project One Network Diagram and Rationale.
- Package deal • 3 items • 2023
-
- $22.49
- 1x sold
- + learn more
CYB-210 Project One Computer Network Modification, CYB-210 Computer Networking Project Two Network Diagram and Rationale & CYB-210 7-2 Project One Network Diagram and Rationale.
-
CYB-210 Project One Computer Network Modification.
- Other • 11 pages • 2023
- Available in package deal
-
- $10.49
- 1x sold
- + learn more
CYB-210 Project One Computer Network Modification. 
This brief will explain the steps that were taken to configure new devices and the network. 
Screenshots are included for each step for better understanding. Completed the following: 
 Add free guest wireless internet for the customers 
 Install cameras that monitor the front desk and the waiting area. 
 Reconfigure the current network to support the new hardware. 
The needed hardware is already in the office, so the cameras and wirele...
-
CYB-210 7-2 Project One Network Diagram and Rationale
- Essay • 7 pages • 2022
- Available in package deal
-
- $5.98
- 24x sold
- + learn more
CYB-210 7-2 Project One Network Diagram and Rationale 
Includes screenshots 
Only for research and reference use.
-
CYB-210 7-2 Project One Network Diagram and Rationale.
- Essay • 7 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
CYB-210 7-2 Project One Network Diagram and Rationale. 
Network Design Rationale 
1. New Ip Configuration to combine existing subnets 
Subnet1 and Subnet2 were merged to form Network A. The secondary router from 
Subnet two was required, and a new configuration was built using 192.168.1.1 as the 
gateway. All clients were assigned a static IP within the given scope. Additionally, 
the now unused port FA 1/0 was closed on the Subnet_Router per security best 
practice. To confirm communication fun...
-
CYB-210 Module 7 Project Two
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $17.49
- + learn more
CYB-210 Module 7 Project Two. 
This project was a little more tricker than the other one. With this project we were given 3 
networks. Networks A and B needed to be connected into one with a new network scheme. 
Network 3 and the new network needed to be connected together. With this being said I added a 
third switch to account for future expansion. I kept the two switches we were given for subnet 1 
and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
And that's how you make extra money
-
CYB-210 Module 7 Project Two
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $24.49
- + learn more
CYB-210 Module 7 Project Two. 
This project was a little more tricker than the other one. With this project we were given 3 
networks. Networks A and B needed to be connected into one with a new network scheme. 
Network 3 and the new network needed to be connected together. With this being said I added a 
third switch to account for future expansion. I kept the two switches we were given for subnet 1 
and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
-
CYB-210 Project One Computer Network Modification
- Exam (elaborations) • 11 pages • 2023
-
- $24.49
- + learn more
CYB-210 Project One Computer Network Modification. 
The needed hardware is already in the office, so the cameras and wireless router were 
harvested from the equipment closet. To get the network ready for the new hardware, the 
existing switch was reconfigured first. After selecting the switch and clicking on the CLI, a 
command was entered (see Figure 1) to add and name the new VLAN for the wireless router’s 
“Guest” network. The command was run again to add and name the new VLAN for the ...
-
CYB-210 Project One Computer Network Modification, CYB-210 Computer Networking Project Two Network Diagram and Rationale & CYB-210 7-2 Project One Network Diagram and Rationale.
- Package deal • 3 items • 2023
-
- $22.49
- + learn more
CYB-210 Project One Computer Network Modification, CYB-210 Computer Networking Project Two Network Diagram and Rationale & CYB-210 7-2 Project One Network Diagram and Rationale.
-
CYB-210 Project One Computer Network Modification Brief
- Exam (elaborations) • 11 pages • 2023
-
- $19.49
- + learn more
CYB-210 Project One Computer Network Modification. 
Add free guest wireless internet for the customers 
 Install cameras that monitor the front desk and the waiting area. 
 Reconfigure the current network to support the new hardware. 
The needed hardware is already in the office, so the cameras and wireless router were 
harvested from the equipment closet. To get the network ready for the new hardware, the 
existing switch was reconfigured first. After selecting the switch and clicking on ...
-
CYB-210-Q3404 Project One Computer Networking | Computer Network Modification
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $18.49
- + learn more
CYB-210-Q3404 Project One Computer Networking | Computer Network Modification. 
This assignment will describe the steps take to construct the network to adhere to the 
requirements per the scenario given for the network provided. I have provided the screenshots so 
as to better show my work. The following was to be completed: 
 Add free guest wireless internet for the customers 
 Install cameras that monitor the front desk and the waiting area. 
 Reconfigure the current network to suppo...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia