Exam life cycle logistics - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Exam life cycle logistics? On this page you'll find 227 study documents about Exam life cycle logistics.

All 227 results

Sort by

ACQ 101 Module 13 Life Cycle  Logistics 2024/2025 Exam with  Complete Solutions 100% Solved
  • ACQ 101 Module 13 Life Cycle Logistics 2024/2025 Exam with Complete Solutions 100% Solved

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ACQ 101 Module 13 Life Cycle Logistics 2024/2025 Exam with Complete Solutions 100% Solved Which of the following are encompassed in life cycle management? single-point accountability; development and implementation of a product support strategy; document the strategy in the LCSP; perform continuing and regular reviews The life cycle sustainment plan LCSP describes which of the following? the approach to integrating sustainment requirements into the system's design; sustainment influen...
    (0)
  • $11.99
  • + learn more
IDIS 343 Exam 1 Questions And Answers  Already Passed
  • IDIS 343 Exam 1 Questions And Answers Already Passed

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • IDIS 343 Exam 1 Questions And Answers Already Passed what 3 things need to be right in supply chain management definition? quantities, locations, time primary logistics activities CS goals, inventory management, transportation, location % of GDP that is logistics costs 10.5-12 why are customers more demanding of the supply chain? they want quick response & mass customization 4 ways logistics adds value form, ownership, time, place 2 largest logistics costs transportation &...
    (0)
  • $9.99
  • + learn more
OMIS 338 FINAL EXAM 2024 STUDY GUIDE WITH COMPLETE SOLUTION
  • OMIS 338 FINAL EXAM 2024 STUDY GUIDE WITH COMPLETE SOLUTION

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • OMIS 338 FINAL EXAM 2024 STUDY GUIDE WITH COMPLETE SOLUTION introduction stage - product design and development are critical frequent product and process design changes quick elimination of market revealed design defects utmost attention to quality operations capacity, process, supplier capable skilled labor training information systems capability in place differentiation, low cost, rapid response - what 3 things make a product/service competitive introduction, gro...
    (0)
  • $11.99
  • + learn more
L4M8 Procurement & Supply in Practice Exam Questions And Answers
  • L4M8 Procurement & Supply in Practice Exam Questions And Answers

  • Exam (elaborations) • 34 pages • 2024
  • Available in package deal
  • L4M8 Procurement & Supply in Practice Exam Questions And Answers How many stages are there within the CIPS Procurement Cycle? - ANS The CIPS procurement cycle has 13 stages: 1. Understand the need and develop a high-level specification. 2. Market/commodity options including make-versus-buy assessment. 3. Develop strategy/plan. 4. Pre-procurement market tests and market engagement. 5. Development of required documentation, e.g. request for quotation (RFQ). 6. Supplier s...
    (0)
  • $14.99
  • + learn more
FAM 104 Week 3 Exam Questions with All Correct Answers
  • FAM 104 Week 3 Exam Questions with All Correct Answers

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • FAM 104 Week 3 Exam Questions with All Correct Answers Describe the goals of acquisition logistics and its importance - Answer- Design the support and support the design. Easily maintained, more sustainable, more reliable and reduce life cycle costs (LCC) List the 12 Product Support Elements (PES) - Answer- 1. Maintenance Planning & Management 2. Product Support Management 3. Design Interface 4. Sustaining/Systems Engineering 5. Supply Support 6. Packaging, Handling, Storage, Transport...
    (0)
  • $12.99
  • + learn more
CIPS L4M8 Exam Questions And Answers
  • CIPS L4M8 Exam Questions And Answers

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • CIPS L4M8 Exam Questions And Answers Stage 13: Assest management/end of life The procurement professional should evaluate whether the need is still current. If it is and unchanged, the procurement cycle commences again but from a different stage as the need is already known and understood. If the need is not required the buyer should manage the end of life by reducing stock levels and informing the supplier Anti-bribery procedures -Proportionate procedures: should be in line with the yp...
    (0)
  • $14.49
  • + learn more
DA 9 Life Cycle Logistics
  • DA 9 Life Cycle Logistics

  • Exam (elaborations) • 2 pages • 2024
  • DA 9 Life Cycle Logistics Exam Review 2024 1 / 2 1. Life Cycle Logistics 2. Life Cycle Sustainment 3. DoDD 5000.01 PMs Responsibilities...
    (0)
  • $9.99
  • + learn more
L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers
  • L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers Name the 13 stages of the procurement cycle - answer1. Understand the need. 2. Market Commodity options. 3. Develop Stratgey/ Plan. 4. Pre-procurement / market test. 5. Develop required documentation. 6. Supplier Selection. 7. Issue invitation to tender. 8. Bid / tender evaluation. 9. Contract Award. 10. Warehouse logistics & receipt. 11. Contract performance review and continuous improvement. 12. Supplier relationshi...
    (0)
  • $12.49
  • + learn more
L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers
  • L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • L4M8 CIPS level 4 Glossary 2 Exam Questions With Verified Answers Name the 13 stages of the procurement cycle - answer1. Understand the need. 2. Market Commodity options. 3. Develop Stratgey/ Plan. 4. Pre-procurement / market test. 5. Develop required documentation. 6. Supplier Selection. 7. Issue invitation to tender. 8. Bid / tender evaluation. 9. Contract Award. 10. Warehouse logistics & receipt. 11. Contract performance review and continuous improvement. 12. Supplier relationshi...
    (0)
  • $12.49
  • + learn more
L4M8 Procurement & Supply in Practice Exam Questions And Answers (Verified And Updated)
  • L4M8 Procurement & Supply in Practice Exam Questions And Answers (Verified And Updated)

  • Exam (elaborations) • 41 pages • 2024
  • Available in package deal
  • L4M8 Procurement & Supply in Practice Exam Questions And Answers (Verified And Updated) How many stages are there within the CIPS Procurement Cycle? - answerThe CIPS procurement cycle has 13 stages: 1. Understand need and develop a high-level specification. 2. Market/commodity options including make-versus-but assessment. 3. Develop strategy/plan. 4. Pre-procurement market tests and market engagement. 5. Development of required documentation, e.g. request for quotation (RFQ). 6. Suppli...
    (0)
  • $14.49
  • + learn more