Hoist up raise load - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hoist up raise load? On this page you'll find 238 study documents about Hoist up raise load.
All 238 results
Sort by
-
NEIEP 200 Final Exam Version 2 (Latest 2023/ 2024 Update) Questions and Verified Answers| 100% Correct| Grade A
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
NEIEP 200 Final Exam Version 2 (Latest 2023/ 2024 Update) Questions and Verified Answers| 100% Correct| Grade A 
 
Q: a mechanic attaches a chainfall to a hoisting beam with a beam clamp. what happens to the capacity of the hoisting beam? 
 
 
Answer: 
 it is reduced to 50% of original capacity 
 
 
 
Q: you are rigging elevator equipment with a sling angle of 60 degrees. you are using a shouldered eye bolt with a tapped 1/2" diameter hole. once the shoulder is seated, what is the minimum thread...
-
Elevator Mechanic Exam Review 2023: Verified Solutions (A+ Guaranteed)
- Exam (elaborations) • 30 pages • 2023
-
- $8.49
- 7x sold
- + learn more
1.	A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required?: Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
2.	A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do?: Replace it with a larger MOV 
3.	On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What is the issue?: Suicide Circuit 
4.	You have an old DC ...
-
Mechanics Exam Review-NEIEP Comprehensive Questions with Answers 100% Accuracy
- Exam (elaborations) • 17 pages • 2024
-
- $5.99
- + learn more
Mechanics Exam Review-NEIEP QUESTIONS AND ANSWERS A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required?, A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do?, On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the issue?, You have an old DC motor and are adding an SCR drive, what do you do to the interpoles?, A hydro run...
-
Hoisting Hand Signals Latest Update Graded A+
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Hoisting Hand Signals Latest Update 
 
Graded A+ 
 
Hoist 
(Crane) 
with forearm vertical, forefinger pointing up, move hand in small horizontal circle 
 
Lower 
(Crane) 
With arm extended downward, forefinger pointing down, move hand in small horizontal circle 
 
Use Main Hoist 
(Crane) 
Tap fist on head; then use regular signals 
 
Raise Boom 
(Crane) 
Arm extended, fingers closed, thumb pointing upward 
 
Use Whipline (Auxiliary Hoist) 
(Crane) 
Tap elbow with one hand; then use regular hand ...
-
Elevator Mechanic Exam Review Questions and answers 2023 With Complete Solution Graded and Already Passed.
- Exam (elaborations) • 11 pages • 2023
-
- $11.49
- 2x sold
- + learn more
A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. 
What sheave is required? - CORRECT ANS Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 
12"+3"= 15" sheave 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. 
What should you do? - CORRECT ANS Replace it with a larger MOV 
On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What 
is the issue? - CORRECT ANS Suici...
Get paid weekly? You can!
-
State Certification Exam for Massachusetts 1C Hoisting License 2024 Updated
- Exam (elaborations) • 4 pages • 2024
-
- $11.99
- + learn more
State Certification Exam for 
Massachusetts 1C Hoisting License 
2024 Updated 
hoist up 
raise load - CORRECT ANSWERhoist down 
lower load - CORRECT ANSWERraise boom up - CORRECT ANSWERlower boom down - CORRECT ANSWERstop - CORRECT ANSWERemergency stop - CORRECT ANSWERswing (left or right) - CORRECT ANSWERtravel (both tracks) - CORRECT ANSWERturn - CORRECT ANSWERload in 
travel carrier - CORRECT ANSWERdog everything - CORRECT ANSWERextend boom 
arm out - CORRECT ANSWER
-
Elevator Mechanic Exam Review exam 2022/023
- Exam (elaborations) • 17 pages • 2022
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? - Answer- Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - Answer- Replace it with a larger MOV 
 
On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What is the issue? - Answer- Suicide Circuit 
...
-
Mechanics Exam Questions and Answers Already Passed
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Mechanics Exam Questions and 
Answers Already Passed 
 
** An MOV burns out, you replace it but cannot read voltage or resistance. What should you do? 
Replace it with a larger one (630) 
 
* On a Ward-Leonard circuit, the brake is set but the motor is trying to slip through the brake. 
What circuit is the issue? Suicide circuit (425) 
 
** A Hydro runs up with no load but does not run up with a full load. What is the issue? The 
relief valve is set too low (805) 
 
** Runby for a 1:1 car hits t...
-
NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $16.99
- + learn more
NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED) you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards the center 
b. the top of the rail needs to go toward the wall 
c. the bottom of the rail needs to go toward the wall 
you are plumbing rails on a high rise installation. what type of plumb line 
should you...
-
NEIEP MECHANICS EXAM REVIEW
- Exam (elaborations) • 16 pages • 2024
-
- $13.19
- + learn more
A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - Answer-100 fpm/125 fpm= 12"/ X =15 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - Answer-Replace it with a larger MOV - 630 
 
On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the issue? - Answer-Suicide Circuit - 425 
 
You have an old DC motor and are...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia