On a jobsite, you must keep tools and materials away from the edge ___ where they can be 
knocked off onto employees working below. - ANS scaffold and floor openings 
When working on a ladder jack scaffold, adequate fall protection devices must be used when the 
scaffold height exceeds ___ feet above the floor below. - ANS 10 
Generally, scaffold planking must be at least ___ inches wide. - ANS 18 
Materials falling off scaffolds ___. - ANS can be prevented by placing screening up to the 
gua...
-
IEC LESSON 108 HW QUESTIONS WITH VERIFIED SOLUTIONS
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
IEC LESSON 108 HW QUESTIONS WITH 
 
VERIFIED SOLUTIONS 
 
___ can prevent scaffolding accidents Good housekeeping and safe procedures 
 
___ may be used to raise worker height on a scaffold. nothing 
 
According to NEC® Section 240.4(B), if the ampacity of a conductor does not match up with a 
standard fuse rating, what are you allowed to do? Use the next higher standard rating 
 
According to the NEC® at 210.50(C), a receptacle outlet for a washing machine must be 
installed within ___ feet o...
-
IEC lesson 108 HW Questions and Answers Latest (2024 / 2025) (Verified Answers)
- Exam (elaborations) • 7 pages • 2024
-
- $13.49
- + learn more
1.	On a jobsite, you must keep tools and materials away from the edge 	 where they can be knocked off onto employees working below. 
ANS scaffold and floor openings 
2.	When working on a ladder jack scaffold, adequate fall protection devices must be used when the scaffold height exceeds 	feet above the floor below. 
ANS 10 
3.	Generally, scaffold planking must be at least 	inches wide. 
ANS 18 
4.	Materials falling off scaffolds 	. 
ANS can be prevented by placing screening up to the guard rail ...
-
IEC LESSON 108 HW QUESTIONS AND ANSWERS.
- Exam (elaborations) • 4 pages • 2024
-
- $12.99
- + learn more
IEC LESSON 108 HW QUESTIONS AND ANSWERS. 
 
 
 
 
On a jobsite, you must keep tools and materials away from the edge ___ where they can be knocked off onto employees working below. - correct answer. scaffold and floor openings 
 
When working on a ladder jack scaffold, adequate fall protection devices must be used when the scaffold height exceeds ___ feet above the floor below. - correct answer. 10 
 
Generally, scaffold planking must be at least ___ inches wide. - correct answer. 18 
 ...
-
IEC lesson 108 HW Questions And Answers With Verified Tests
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
On a jobsite, you must keep tools and materials away from the edge ___ where they can be knocked off 
onto employees working below. - Answer-scaffold and floor openings 
When working on a ladder jack scaffold, adequate fall protection devices must be used when the scaffold 
height exceeds ___ feet above the floor below. - Answer-10 
Generally, scaffold planking must be at least ___ inches wide. - Answer-18 
Materials falling off scaffolds ___. - Answer-can be prevented by placing screening up to...
As you read this, a fellow student has made another $4.70
-
IEC EXAMS BUNDLED IEC 1st & 2nd Year Final Exam IEC lesson 108 HW IEC Chapters 1-4 Manual Review Questions and Answers Latest (2024 / 2025) (Verified Answers)
- Package deal • 7 items • 2024
-
- $70.49
- + learn more
IEC EXAMS BUNDLED IEC 1st & 2nd Year Final Exam IEC lesson 108 HW IEC Chapters 1-4 Manual Review Questions and Answers Latest (2024 / 2025) (Verified Answers)
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia