LEED BD+C AP EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 36 pages • 2024
-
- $16.49
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct answer EPDs must...
-
LEED BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 19 pages • 2024
-
- $16.49
- + learn more
When calculating occupied areas in an area of a building, what spaces must be excluded? - correct answer Underground or structured parking 
Mechanical spaces are included 
 
How do you calculate default occupancy counts for Core and Shell projects? - correct answer Using gross floor area, not net or leasable floor area 
 
Are hotel guests visitors or regular occupants of the building? - correct answer Regular occupants 
 
Can boats and mobile homes be certified under LEED? - correct answer No. 
...
-
LEED AP BD+C PRACTICE EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 34 pages • 2024
-
- $13.49
- + learn more
what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hoslitality 
Healthcare 
 
what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hospitality 
Healthcare
-
LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 28 pages • 2024
-
- $16.49
- + learn more
What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
-
LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 21 pages • 2024
-
- $14.49
- + learn more
The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum? 
 
A. Exclude 10% of the gross floor area to try to improve the project's energy performance 
B. Install extra bicycle racks to earn exemplary performance for LT Credit Bicycle Facilities 
C. Submit new or revised documentation for credits that were denied or require more information, or attempt additional cr...
Make study stress less painful
-
LEED V4 AP BD+C PRACTICE TEST #1 EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 43 pages • 2024
-
- $15.49
- + learn more
A project's total site area is 280,000 SF (26,000 m2). The total previously developed area on site is 100,000 SF (9,290 m2). The building FAR is 1.7. How much financial support would an owner have to provide to ear SS credit Site Development - Protect or Restore Habitat? 
 
A) $112,000 
B) $72,000 
C) $122,400 
D) $40,000 - correct answer A) $112,000 
 
*Feedback:* 
 
This type of question will likely include additional, extraneous information to cause confusion. For Option 2 Financial Support,...
-
LEED BD+C Test #2| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
How is a project going to achieve EQ Credit Low-Emitting Materials without completion of a 
budget calculation? 
A) By specifying only products that provide full disclosure 
B) By using products that comply with the standards for 90%, by cost, of the total value of 
identified products 
C) By specifying all or nearly all compliant products in at least two product categories 
D) By not using any wet-applied products on site - ANSWER By specifying all or nearly all 
compliant products in at least ...
-
LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 28 pages • 2024
-
- $16.49
- + learn more
What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
-
LEED BD+C Test #3| Questions and 100% Correct Verified Answers| Latest Update
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
$40,000 - ANSWER A project team is reviewing material choices before deciding which products 
to include. The team located interior wall partitions made with recycled content that have been 
salvaged from another building. The partitions are available from a company located 50 miles 
(80 km) from the project site for the price of $20,000. What value do the partitions have toward 
MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials? 
A) $40,000 
B) $60,000 
C) $20,0...
-
LEED BD+C Test #1| Questions Solved with 100% Correct Verified Answers
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
The LEED Project boundary may not include land that is owned by a party other than that which 
owns the LEED project unless: 
A) The land will be donated for the purposes of earning an ID point 
B) The Land associated with and supports normal building operations for the LEED Project 
building 
C) The land is part of a larger campus project 
D) The Land will be included in a future LEED certification - ANSWER The Land is associated with 
and supports normal building operations for the LEED Projec...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia