Leed bdc exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Leed bdc exam? On this page you'll find 49 study documents about Leed bdc exam.
All 49 results
Sort by
-
LEED BD+C AP EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 36 pages • 2024
-
- $16.49
- + learn more
(MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. 
Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes 
 
What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct answer EPDs must...
-
LEED AP BD+C PRACTICE EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 34 pages • 2024
-
- $13.49
- + learn more
what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hoslitality 
Healthcare 
 
what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations 
Core and Shell Development 
Schools 
Retail 
Data Centers 
Warehouses and Dist. Centers 
Hospitality 
Healthcare
-
LEED BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 19 pages • 2024
-
- $16.49
- + learn more
When calculating occupied areas in an area of a building, what spaces must be excluded? - correct answer Underground or structured parking 
Mechanical spaces are included 
 
How do you calculate default occupancy counts for Core and Shell projects? - correct answer Using gross floor area, not net or leasable floor area 
 
Are hotel guests visitors or regular occupants of the building? - correct answer Regular occupants 
 
Can boats and mobile homes be certified under LEED? - correct answer No. 
...
-
LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 28 pages • 2024
-
- $16.49
- + learn more
What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
-
LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 21 pages • 2024
-
- $14.49
- + learn more
The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum? 
 
A. Exclude 10% of the gross floor area to try to improve the project's energy performance 
B. Install extra bicycle racks to earn exemplary performance for LT Credit Bicycle Facilities 
C. Submit new or revised documentation for credits that were denied or require more information, or attempt additional cr...
And that's how you make extra money
-
LEED V4 AP BD+C PRACTICE TEST #1 EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 43 pages • 2024
-
- $15.49
- + learn more
A project's total site area is 280,000 SF (26,000 m2). The total previously developed area on site is 100,000 SF (9,290 m2). The building FAR is 1.7. How much financial support would an owner have to provide to ear SS credit Site Development - Protect or Restore Habitat? 
 
A) $112,000 
B) $72,000 
C) $122,400 
D) $40,000 - correct answer A) $112,000 
 
*Feedback:* 
 
This type of question will likely include additional, extraneous information to cause confusion. For Option 2 Financial Support,...
-
LEED AP BD+C EXAM WITH COMPLETE SOLUTIONS LATEST UPDATE
- Exam (elaborations) • 28 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
LEED AP BD+C EXAM WITH COMPLETE SOLUTIONS LATEST UPDATE...
-
LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 28 pages • 2024
-
- $16.49
- + learn more
What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). 
 
What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. 
 
How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
-
LEED AP BD+C v4 EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 12 pages • 2024
-
- $16.49
- + learn more
What does the acronym "LEED" stand for? - correct answer Leadership in Energy and Environmental Design 
 
What does the acronym "GBCI" stand for? - correct answer Green Business Certification Inc. 
 
Buildings are __________ and people are __________ - correct answer certified; credentialed 
 
What are the knowledge domains? - correct answer 1. LEED Process, 2. Integrative Strategies, 3. Location and Transportation, 4. Sustainable Sites, 5. Water Efficiency, 6. Energy and Atmosphere, 7. Mate...
-
LEED AP BD+C Exam 2 |Questions and 100% Correct Verified Answers| Latest UpdatE
- Exam (elaborations) • 33 pages • 2024
-
- $13.49
- + learn more
What is the default gender ratio for indoor water us reduction calculation? - ANSWER 1 to 1 ; 
i.e. 50/50 male to female 
What energy related systems must be commissioned? - ANSWER -Mechanical, including 
HVAC&R equipment & controls 
-Electrical lighting and daylighting controls 
-Plumbing, including domestic hot water systems 
-Renewable energy sytems
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia