Lirr air brakes - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Lirr air brakes? On this page you'll find 12 study documents about Lirr air brakes.

All 12 results

Sort by

LIRR Air Brakes Review condr verified already passed 2024/2025 Popular
  • LIRR Air Brakes Review condr verified already passed 2024/2025

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • LIRR Air Brakes Review Colors for: -Brake pipe needle -Brake cylinder needle - correct answer Brake pipe = White Brake cylinder = Red Fully charged train, the brake pipe pressures for a diesel train and freight train (also M3 and M7) - correct answer Diesel = 110psi Freight = 90psi M3 = 130-150psi M7 = 120-150psi Diesel Passenger Train (C3) - Air and Electrical Connections - correct answer -Brake Pipe -Main Reservoir -4 High Voltage, 3pt. Jumpers -black 36pt. Jumper -blue 36pt....
    (0)
  • $17.99
  • 1x sold
  • + learn more
LIRR Air Brakes Review (AC) Questions And Revised Correct  Answers | Passed!!
  • LIRR Air Brakes Review (AC) Questions And Revised Correct Answers | Passed!!

  • Exam (elaborations) • 20 pages • 2024
  • LIRR Air Brakes Review (AC) Questions And Revised Correct Answers | Passed!! Colors for: -Brake pipe needle -Brake cylinder needle - ANSWER : Brake pipe = White Brake cylinder = Red Fully charged train, the brake pipe pressures for a diesel train and freight train (also M3 and M7) - ANSWER : Diesel = 110psi Freight = 90psi M3 = 130-150psi M7 = 120-150psi Diesel Passenger Train (C3) - Air and Electrical Connections - ANSWER : -Brake Pipe -Main Reservoir -4 High Voltage, 3pt. J...
    (0)
  • $15.99
  • + learn more
LIRR Air Brakes Review (AC) Questions And Revised Correct  Answers | Passed!!
  • LIRR Air Brakes Review (AC) Questions And Revised Correct Answers | Passed!!

  • Exam (elaborations) • 20 pages • 2024
  • LIRR Air Brakes Review (AC) Questions And Revised Correct Answers | Passed!! Colors for: -Brake pipe needle -Brake cylinder needle - ANSWER : Brake pipe = White Brake cylinder = Red Fully charged train, the brake pipe pressures for a diesel train and freight train (also M3 and M7) - ANSWER : Diesel = 110psi Freight = 90psi M3 = 130-150psi M7 = 120-150psi Diesel Passenger Train (C3) - Air and Electrical Connections - ANSWER : -Brake Pipe -Main Reservoir -4 High Voltage, 3pt. J...
    (0)
  • $12.99
  • + learn more
LIRR Air Brakes Review condr question n answers graded A+ 2023/2024
  • LIRR Air Brakes Review condr question n answers graded A+ 2023/2024

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • LIRR Air Brakes Review Colors for: -Brake pipe needle -Brake cylinder needle - correct answer Brake pipe = White Brake cylinder = Red Fully charged train, the brake pipe pressures for a diesel train and freight train (also M3 and M7) - correct answer Diesel = 110psi Freight = 90psi M3 = 130-150psi M7 = 120-150psi Diesel Passenger Train (C3) - Air and Electrical Connections - correct answer -Brake Pipe -Main Reservoir -4 High Voltage, 3pt. Jumpers -black 36pt. Jumper -blue 36pt....
    (0)
  • $17.99
  • + learn more
LIRR Air Brakes fully solved graded A+
  • LIRR Air Brakes fully solved graded A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • LIRR Air BrakesBrake Pipe Pressures: - correct answer Freight - 90 PSI. Diesel passenger 110 PSI. M3 Train 130 to 150 PSI. M7 Train 120 to 150 PSI. Main Reservoir 125 to 140 PSI (When applicable). Brake Cylinder Pressure - correct answer Approximately 45 to 60 PSI 30 PSI on cab car 70 PSI on M3 38 PSI on M7 What items must be sealed on E-15 operating cab? - correct answer ASC cut out. Deadman cut out Ground Relay cut out switch. What must be sealed on DE/DM 30 operating cab? -...
    (0)
  • $12.99
  • + learn more
LIRR Air Brakes question n answers graded A+ 2023/2024
  • LIRR Air Brakes question n answers graded A+ 2023/2024

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • LIRR Air BrakesBrake Pipe Pressures: - correct answer Freight - 90 PSI. Diesel passenger 110 PSI. M3 Train 130 to 150 PSI. M7 Train 120 to 150 PSI. Main Reservoir 125 to 140 PSI (When applicable). Brake Cylinder Pressure - correct answer Approximately 45 to 60 PSI 30 PSI on cab car 70 PSI on M3 38 PSI on M7 What items must be sealed on E-15 operating cab? - correct answer ASC cut out. Deadman cut out Ground Relay cut out switch. What must be sealed on DE/DM 30 operating cab? -...
    (0)
  • $9.99
  • + learn more
LIRR Air Brake Questions well answered graded A+
  • LIRR Air Brake Questions well answered graded A+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • LIRR Air Brake Questions 2. Name the air pressure that is "train lined" on all trains operated on the Long Island Rail Road - correct answer Brake pipe pressure 3. Instructions for assisting disabled trains may be found in which LIRR publication? - correct answer THEM Manual - Train Handling Equipment Manual 4. When the following angle cock and/or cutout cock handles are in-line with the pipe, are the valves open or closed? - correct answer A.) brake pipe (opposite) = open B.) main res...
    (0)
  • $14.99
  • + learn more
LIRR Air Brake Questions and answers graded A+ 2023/2024
  • LIRR Air Brake Questions and answers graded A+ 2023/2024

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • LIRR Air Brake Questions 2. Name the air pressure that is "train lined" on all trains operated on the Long Island Rail Road - correct answer Brake pipe pressure 3. Instructions for assisting disabled trains may be found in which LIRR publication? - correct answer THEM Manual - Train Handling Equipment Manual 4. When the following angle cock and/or cutout cock handles are in-line with the pipe, are the valves open or closed? - correct answer A.) brake pipe (opposite) = open B.) main res...
    (0)
  • $12.99
  • + learn more
LIRR Assistant Conductor question n  answers graded A+ 2023/2024
  • LIRR Assistant Conductor question n answers graded A+ 2023/2024

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • LIRR Assistant Conductorooooo Horn - correct answer 14F Call Inspector --o- 1A Horn - correct answer 14L When approaching a public highway grade crossing, a train or locomotive operating greater than 60MPH must sound the engine whistle at the whistle post. --o- 1B Horn - correct answer 14L If operating 60MPH or less, a train or locomotive must sound the engine whistle at least 15 but not more than 20 seconds before occupying the crossing. This may require sounding the engine whistle beyond...
    (0)
  • $9.99
  • + learn more
LIRR Phase 1 Questions and Answers 100% Verified
  • LIRR Phase 1 Questions and Answers 100% Verified

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • LIRR Phase 1 Questions and Answers 100% Verified Before starting each tour of duty, what is required of employees to compare? - answerCheck the standard clock designed by the timetable. How long is each timetable in effect for? - answerEach timetable from the moment it takes effect supersedes the preceding timetable. Employees connected with the movement of trains must use a ? ? - answerReliable watch What happens to a train when it's timetable is superceded? Include how the train will c...
    (0)
  • $11.49
  • + learn more