Module 6 nccer - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Module 6 nccer? On this page you'll find 271 study documents about Module 6 nccer.
All 271 results
Sort by
-
Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024
- Exam (elaborations) • 4 pages • 2024
-
- $9.48
- 2x sold
- + learn more
Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024 
 
Most construction drawings today are​ hand-drawn by drafters. - Correct Answer False 
 
The border is a clear area of about​ _____ inch(es) around the edge of the drawing. - Correct Answer ½ 
 
Abbreviations used in drawings are always written in​ ____. - Correct Answer capital letters 
 
A keynote is used to identify a specific object in a drawing. - Correct Answer True 
 
A grid divides t...
-
Module 2- NCCER Introduction to Construction Math Test Questions And Answers
- Exam (elaborations) • 3 pages • 2024 Popular
-
- $7.99
- 2x sold
- + learn more
Module 2- NCCER Introduction to 
Construction Math Test Questions And 
Answers 
 
 
 
18/54 - ANSWER The equivalent fraction to 6/18 is 
 
 1/3 - ANSWER When 4/12 is reduced to the lowest terms what is the answer 
 
 6 1/6 - ANSWER 9.37/6 is an improper fraction that can be changed to what mixed 
number 
 
 5/8 - ANSWER Reduce your answer to the lowest term. 1/4 + 3/8 
 
 1/6 - ANSWER Reduce your answer to the lowest term. 8/12-4/8= 
 
 5/12 - ANSWER Reduce your answer to the l...
-
Module 6 NCCER into to Basic rigging questions with correct answers
- Exam (elaborations) • 6 pages • 2023
-
- $7.99
- 9x sold
- + learn more
During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? CORRECT ANSWER (Anyone on the ground who is in sight of the crane operator). 
 
The recommendation when lifting a load longer then __________ is to use two choker hitches. CORRECT ANSWER (12 feet) 
 
A hand-operated winching device that should never be used for vertical overhead lifting is a (CORRECT ANSWER come-along 
 
All chain hoists use a ____________ to lift heavy loads. CORRECT...
-
NCCER Module 6- Introduction to Basic Rigging Test with correct Answers |Latest 2024/2025
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
NCCER Module 6- Introduction to Basic Rigging Test with correct Answers |Latest 2024/2025
-
NCCER Module 6: Introduction to Construction Drawings Questions And Answers 2024
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $10.49
- 1x sold
- + learn more
NCCER Module 6: Introduction to Construction Drawings 
Questions And Answers 2024 
Most construction drawings today are hand-drawn by drafters. - ANS-False 
The border is a clear area of about _____ inch(es) around the edge of the drawing. - ANS-1/2 
The legend is the same as a company logo on a construction drawing. - ANS-False 
A civil plan is also called a(n) _____ plan. - ANS-plot 
The natural contours of the land are often shown on a civil plan. - ANS-True 
A roof plan is likely to ...
Make study stress less painful
-
Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $8.49
- 1x sold
- + learn more
Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers 
 
The main connection fitting for chain slings is the - ANS master link 
 
To form an endless-loop web sling, you must ----------- the ends together - ANS splice 
 
A ---------- is the distance it takes for one strand of wire rope that makes a complete turn around the core. - ANS one-rope lay 
 
A pulley system that has a mechanical advantage for lifting a load is a - ANS hoist 
 
A -------------- is...
-
Module 6 NCCER into to Basic rigging|A+ Graded
- Exam (elaborations) • 5 pages • 2024
-
- $10.59
- + learn more
Module 6 NCCER into to Basic rigging|A+ Graded 
During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? 
(Anyone on the ground who is in sight of the craneoperator). 
 
 
The recommendation when lifting a load longer then __________ is to use two chokerhitches. 
(12 feet) 
 
 
A hand-operated winching device that should never be used for vertical overhead liftingis a ( 
come-along 
 
 
All chain hoists use a ____________ to lift heavy loads...
-
Module 6 NCCER into to Basic rigging|A+ Graded
- Exam (elaborations) • 5 pages • 2024
-
- $10.59
- + learn more
Module 6 NCCER into to Basic rigging|A+ Graded 
d. manufacturer's name or trademark 
Identification tags for slings must include the ______. 
 
a. type of protective pads to use 
b. type of damage sustained during use 
c. color of the tattle-tail 
d. manufacturer's name or trademark 
 
 
a. fiber core 
The type of wire rope core that is susceptible to heat damage at relatively low temperatures is the ______. 
 
a. fiber core 
b. strand core 
c. independent wire rope core 
d. metallic link supp...
-
Module 6 NCCER Rigging Questions and Answers
- Exam (elaborations) • 5 pages • 2024
-
- $10.59
- + learn more
Module 6 NCCER Rigging Questions and Answers 
Synthetic fibers, cast iron links, and wire rope. 
Slings are commonly made out of? 
 
 
Removed from service immediately. 
If the identification tag on a synthetic sling is missing or illegible, the sling must be? 
 
 
Body 
The size of the shackle is determined by the diameter of its? 
 
 
Hoist 
A type of rigging equipment that uses a pulley system to provide a mechanical advantage for lifting a load is a? 
 
 
Choker hitch 
When a load has no at...
-
Module 6 NCCER Rigging Questions and Answers 100% Pass
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Module 6 NCCER Rigging Questions and Answers 100% Pass
-
Module 6 NCCER into to Basic rigging 2024 Complete Questions and Answers 100% Pass
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Module 6 NCCER into to Basic rigging 2024 Complete Questions and Answers 100% Pass
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia