Nccco core 202 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco core 202? On this page you'll find 30 study documents about Nccco core 202.

All 30 results

Sort by

NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Popular
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 13 pages • 2024 Popular
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed fro...
    (0)
  • $14.99
  • 1x sold
  • + learn more
NCCCO Core sample test QuestionS & ANSWERS(LATEST UPDATE 2024)RATED A
  • NCCCO Core sample test QuestionS & ANSWERS(LATEST UPDATE 2024)RATED A

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • A frequent inspection is: - ANSWER Daily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWER Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - ANSWER 1% (1926.1431(c)(1)
    (0)
  • $10.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom h...
    (0)
  • $13.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from...
    (0)
  • $14.49
  • + learn more
NCCCO Core Exam Outline 2024
  • NCCCO Core Exam Outline 2024

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • Timber or steel - These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material Over the corner - On crawler cranes, which boom position creates the greatest ground pressure Blocking - Allows the weight of the crane and load to be distributed over a greater surface area. Should be used under outrigger floats at all times. 3 - Blocking should be at least how many times the surface area of the float Energized - Overhead power lines ...
    (0)
  • $11.49
  • + learn more
NCCCO Core sample test QUESTIONS AND ANSWERS(LATEST UPDATE 2024)RATED A+
  • NCCCO Core sample test QUESTIONS AND ANSWERS(LATEST UPDATE 2024)RATED A+

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • A frequent inspection is: - ANSWER Daily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWER Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - ANSWER 1% (1926.1431(c)(1) The ...
    (0)
  • $14.99
  • + learn more
NCCCO CORE CRANE EXAM QUESTION BANK LATEST 2024-2025 COMPLETE 250 QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY GRADED A+| click on AVAILABLE IN PACKAGE DEAL. You'll get more for less! OR SCROLL TO THE BOTTOM RIGHT CORNER AFTER OPENING THIS DOCUME
  • NCCCO CORE CRANE EXAM QUESTION BANK LATEST 2024-2025 COMPLETE 250 QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY GRADED A+| click on AVAILABLE IN PACKAGE DEAL. You'll get more for less! OR SCROLL TO THE BOTTOM RIGHT CORNER AFTER OPENING THIS DOCUME

  • Exam (elaborations) • 59 pages • 2024
  • click on AVAILABLE IN PACKAGE DEAL. You'll get more for less! OR SCROLL TO THE BOTTOM RIGHT CORNER AFTER OPENING THIS DOCUMENT TO SEE MORE DETAILED PACKAGES. THANK YOU. Great news champ! Discover affordable options that don’t compromise on quality. Explore our fantastic deals and enjoy extra details that make your shopping experience even better using OUR PACKAGE OFFERS. Happy shopping!
    (0)
  • $24.99
  • + learn more
NCCCO CORE EXAM QUESTIONS WITH 100% CORRECT ANSWERS | VERIFIED | LATEST UPDATE 2024
  • NCCCO CORE EXAM QUESTIONS WITH 100% CORRECT ANSWERS | VERIFIED | LATEST UPDATE 2024

  • Exam (elaborations) • 12 pages • 2024
  • NCCCO CORE EXAM QUESTIONS WITH 100% CORRECT ANSWERS | VERIFIED | LATEST UPDATE 2024
    (0)
  • $14.99
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER- there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly ...
    (0)
  • $12.39
  • + learn more