Nerc stuvia - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc stuvia? On this page you'll find 28 study documents about Nerc stuvia.

All 28 results

Sort by

HSI Final Test Questions with Correct Answers 100% Pass
  • HSI Final Test Questions with Correct Answers 100% Pass

  • Exam (elaborations) • 40 pages • 2024
  • HSI Final Test Questions with Correct Answers 100% Pass The initial response to a frequency deviation is due to which of the following 1. Load / frequency response 2. AGC 3. Governor action 4. Interchange schedules •3 and 4 •1 and 2 •2 and 3 •1 and 3 - ANSWER-•1 and 3 EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the top of ...
    (0)
  • $12.49
  • + learn more
NERC Certification Exam  /Complete Questions And Answers
  • NERC Certification Exam /Complete Questions And Answers

  • Exam (elaborations) • 21 pages • 2024
  • NERC Certification Exam /Complete Questions And Answers Quiz :True/False According to the NERC Functional Model, there is no difference between the function and the entity.NERC Certification Exam /Complete Questions And Answers NERC Certification Exam /Complete Questions And Answers NERC Certification Exam /Complete Questions And Answers NERC Certification Exam /Complete Questions And Answers NERC Certification Exam /Complete Questions And Answers NERC Certification Exam /Complete Ques...
    (0)
  • $11.99
  • + learn more
NERC Certification Exam Questions With Correct Answers
  • NERC Certification Exam Questions With Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - Answer B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Answer B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Answer B) False True/False ...
    (0)
  • $11.49
  • + learn more
NERC Certification Exam 2023-2024 Questions and Answers (Graded A)
  • NERC Certification Exam 2023-2024 Questions and Answers (Graded A)

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • NERC Certification Exam Questions and Answers (Graded A) NERC Certification Exam Questions and Answers (Graded A) NERC Certification Exam Questions and Answers (Graded A) True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - ANSWER-B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - ANSWER-B) False True/False ...
    (0)
  • $11.49
  • + learn more
NERC Prep - Bal, Int, & Trans Test Questions With Verified Answers
  • NERC Prep - Bal, Int, & Trans Test Questions With Verified Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • b. NERC Operating Committee - Answer What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - Answer What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equ...
    (0)
  • $12.49
  • + learn more
SOS NERC Prep - RElIABILITY Exam 2023-2024 Questions and Answers 100% Correct
  • SOS NERC Prep - RElIABILITY Exam 2023-2024 Questions and Answers 100% Correct

  • Exam (elaborations) • 54 pages • 2023
  • Available in package deal
  • SOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% Correct The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange...
    (0)
  • $14.99
  • + learn more
NERC Test Questions & Answers(Latest Update 2024)
  • NERC Test Questions & Answers(Latest Update 2024)

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? - ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? - ANSWER All load breakers should be ...
    (0)
  • $11.99
  • + learn more
SOS: NERC Terms and Definitions
  • SOS: NERC Terms and Definitions

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • SOS: NERC Terms and Definitions SOS: NERC Terms and Definitions SOS: NERC Terms and Definitions Area Control Error (ACE) - ANSWER-The instantaneous difference between a Balancing Authority's net actual and scheduled interchange, taking into account the effects of Frequency Bias, correction for meter error, and Automatic Time Error Correction (ATEC), if operating in the ATEC mode. ATEC is only applicable to Balancing Authorities in the Western Interconnection. Reporting ACE - ANSWER-...
    (0)
  • $11.49
  • + learn more
NERC PREP TEST 101 Questions With Correct Answers
  • NERC PREP TEST 101 Questions With Correct Answers

  • Exam (elaborations) • 57 pages • 2024
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
    (0)
  • $13.49
  • + learn more
NERC SOS Quiz Questions and Answers 100% Accurate
  • NERC SOS Quiz Questions and Answers 100% Accurate

  • Exam (elaborations) • 34 pages • 2023
  • Available in package deal
  • NERC SOS Quiz Questions and Answers 100% Accurate NERC SOS Quiz Questions and Answers 100% Accurate NERC SOS Quiz Questions and Answers 100% Accurate If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? - ANSWER-Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its c...
    (0)
  • $12.99
  • + learn more