Nerc ba test Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc ba test? On this page you'll find 81 study documents about Nerc ba test.

All 81 results

Sort by

NERC BA TEST | Actual Questions and Answers Latest Updated 2024/2025 (Graded A+)
  • NERC BA TEST | Actual Questions and Answers Latest Updated 2024/2025 (Graded A+)

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • NERC BA TEST | Actual Questions and Answers Latest Updated 2024/2025 (Graded A+)
    (0)
  • $13.48
  • + learn more
NERC BA TEST WITH 100% CORRECT ANSWERS.
  • NERC BA TEST WITH 100% CORRECT ANSWERS.

  • Exam (elaborations) • 39 pages • 2023
  • Available in package deal
  • What is the purpose in accounting for Inadvertent Interchange among the Balancing Authorities? To ensure that Balancing Authorities do not excessively depend on other Balancing Authority Areas for meeting their demand or Interchange obligations. In your Interconnection, a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz. Your Balancing Authority's Frequency Bias is 200 MW/0.1 Hz. How many MW would your system initially contribute to frequency sup...
    (0)
  • $14.49
  • + learn more
nerc ba test Questions and Correct Answers
  • nerc ba test Questions and Correct Answers

  • Exam (elaborations) • 35 pages • 2024
  • nerc ba test Questions and Correct Answers What is the purpose in accounting for Inadvertent Interchange among the Balancing Authorities? - Correct Answer: To ensure that Balancing Authorities do not excessively depend on other Balancing Authority Areas for meeting their demand or Interchange obligations. In your Interconnection, a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz. Your Balancing Authority's Frequency Bias is 200 MW/0.1 Hz. How many...
    (0)
  • $12.49
  • + learn more
nerc ba test (Actual test with 100% correct solutions)
  • nerc ba test (Actual test with 100% correct solutions)

  • Exam (elaborations) • 37 pages • 2023
  • Available in package deal
  • What is the purpose in accounting for Inadvertent Interchange among the Balancing Authorities? correct answers To ensure that Balancing Authorities do not excessively depend on other Balancing Authority Areas for meeting their demand or Interchange obligations. In your Interconnection, a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz. Your Balancing Authority's Frequency Bias is 200 MW/0.1 Hz. How many MW would your system initially contribute to fr...
    (0)
  • $14.99
  • + learn more
NERC Test Questions with correct answers
  • NERC Test Questions with correct answers

  • Exam (elaborations) • 28 pages • 2023
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? CORRECT ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? CORRECT ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? CORRECT ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? CORRECT ANSWER All ...
    (0)
  • $15.99
  • + learn more
NERC BA TEST WITH 100% CORRECT ANSWERS
  • NERC BA TEST WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 39 pages • 2023
  • Available in package deal
  • NERC BA TEST WITH 100% CORRECT ANSWERS
    (0)
  • $13.99
  • + learn more
NERC Test Questions with Correct Answers Graded A+
  • NERC Test Questions with Correct Answers Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? -Answer 6-10% (Think 6- 10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? -Answer Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? -Answer Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? -Answer All load breakers should be opene...
    (0)
  • $12.49
  • + learn more
NERC Test Questions With 100% Accurate Answers Review Soln
  • NERC Test Questions With 100% Accurate Answers Review Soln

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • NERC Test Questions With 100% Accurate Answers Review Soln 1. What percentage of load gives a 1 Hz change in an island condition? - ANS-6-10% (Think 6-10 day island vacation) 2. If ACE is Zero but system Hz is off, what should a system operator do? - ANS-Nothing! ACE bias and interchange schedule will improve frequency 3. If ACE is Zero, why not adjust generation to help frequency? - ANS-Could overload equipment, this is a NERC violation 4. When restoring from blackout condition, what ...
    (0)
  • $14.69
  • + learn more
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Exam (elaborations) • 29 pages • 2023
  • Available in package deal
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
    (0)
  • $10.49
  • + learn more
Nerc Test Questions & Answers
  • Nerc Test Questions & Answers

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Nerc Test Questions & Answers 60 minutes - ANS-According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ 2 business days - ANS-A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days 5% - ANS-During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity load and generation - ANS-What are the two components...
    (0)
  • $12.49
  • + learn more