Nicet level 1 i - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nicet level 1 i? On this page you'll find 109 study documents about Nicet level 1 i.
All 109 results
Sort by
-
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION 2024 EXAM | ALL 160 EXAM QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+
- Exam (elaborations) • 25 pages • 2024
-
- $19.99
- 8x sold
- + learn more
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION 2024 EXAM | ALL 160 EXAM QUESTIONS AND CORRECT ANSWERS | ALREADY GRADED A+
-
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION ACTUAL EXAM LATEST 2024 QUESTIONS AND CORRECT ANSWERS
- Exam (elaborations) • 43 pages • 2024 Popular
- Available in package deal
-
- $17.99
- 1x sold
- + learn more
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION ACTUAL EXAM LATEST 2024 QUESTIONS AND CORRECT ANSWERS
-
NICET Level 1 inspection and Testing Exam 2024
- Exam (elaborations) • 5 pages • 2024
-
- $11.49
- 1x sold
- + learn more
NICET Level 1 inspection and Testing Exam 2024 
When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity 
is... -Answer-80% 
When a software change is made to a fire alarm system, what percentage of the initiating devices 
not affected by the change must be tested -Answer-10% 
When testing elevator recall, the elevator should go to the alternate level when: -Answer-The 
lobby smoke detector on the recall level is activated 
Minimum requirement for system docu...
-
NICET Level 1 ITM Of Water-Based Systems questions with correct answers
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $14.99
- 1x sold
- + learn more
Who is responsible for the inspection, testing, maintenance and impairment of a water based fire protection system? - Answer The Property owner or designated representative 
 
Who's responsibility is it to provide accessibility to components of a water based fire protection system? - Answer The property owner or designated representative 
 
Who shall correct or repair deficiencies or impairments found during the inspection, test and maintenance required by standard? - Answer The property ...
-
NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
- Exam (elaborations) • 46 pages • 2024
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers) 
 
 
Q: A fire pump was installed in a low-rise residential building with a required fire alarm system. What are the requirements for the pump running signal? 
a. It shall be a supervisory signal. 
b. It shall be an alarm signal. 
c. It shall be a supervisory or alarm signal. 
d. A pump running signal is not required. 
 
 
Answer: 
c 
 
 
 
Q: A licensed electrician was hired to install duc...
And that's how you make extra money
-
NICET Fire Alarm Level 1 Questions and Answers Already Graded A
- Exam (elaborations) • 33 pages • 2023
- Available in package deal
-
- $10.49
- 2x sold
- + learn more
NICET Fire Alarm Level 1 Questions and 
Answers Already Graded A 
When a device is inaccessible due to excessive height, such as an atrium, what it the maximum 
interval for testing? 18 months 
When installing a wall-mounted fire telephone appliance to the public, what is the acceptable 
maximum mounting height from the floor? 66 inches 
Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the 
center-line of the door? 21 feet 
At minimum, when working near pow...
-
NICET LEVEL 1 INSPECTION AND TESTING EXAM 2024 WITH 100% ACCURATE SOLUTIONS
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
NICET LEVEL 1 INSPECTION AND TESTING EXAM 2024 WITH 100% ACCURATE SOLUTIONS 
 
 
When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity is... - Precise Answer 80% 
 
When a software change is made to a fire alarm system, what percentage of the initiating devices not affected by the change must be tested - Precise Answer 10% 
 
When testing elevator recall, the elevator should go to the alternate level when: - Precise Answer The lobby smoke detector on the r...
-
NICET Level 1 in Highway Construction Questions and Answers (Best Rated)
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
The rate of decay is measured by its 
 Half life 
The pH number that indicates the greatest acidity is 
 1 
Approximate mass of 49N weight is 
 5KG 
The atomic number is the number of protons in an atom 
 Atomic nucleus 
10 
 Flourine has an atomic weight of 19 and an atomic number of 9. What 
is the number of neutrons in the atomic nucleus? 
65 
Master01 | September, 2024/2025 | Latest update 
1 | P a g e | © copyright 2024/2025 | Grade A+ 
 An atom has 30 protons and 35 neutrons in its nucle...
-
NICET Level 1 in Highway Construction with correct Answers.
- Exam (elaborations) • 22 pages • 2024
-
- $16.49
- + learn more
NICET Level 1 in Highway Construction with correct Answers.
-
NICET LEVEL 1 INSPECTION AND TESTING
- Exam (elaborations) • 5 pages • 2024
-
- $10.99
- + learn more
When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity is... - Answer-80% 
 
When a software change is made to a fire alarm system, what percentage of the initiating devices not affected by the change must be tested - Answer-10% 
 
When testing elevator recall, the elevator should go to the alternate level when: - Answer-The lobby smoke detector on the recall level is activated 
 
Minimum requirement for system documentation - Answer-Battery calculations/fl...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia