Parapet construction - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Parapet construction? On this page you'll find 182 study documents about Parapet construction.

All 182 results

Sort by

NC Building Contractor License Study Guide with Complete Solutions Popular
  • NC Building Contractor License Study Guide with Complete Solutions

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • NC Building Contractor License Study Guide with Complete Solutions Prime Contractor - Answer️️ -The ______asummes the entire responsibility under the contract Sub Contractor - Answer️️ -The ______ asummes responsibility with respect to his portion of the work 6ft - Answer️️ -Safety Belts shall be a min of 1/2 inch nylon and not allow a fall greater than ____ 8ft - Answer️️ -Safety Nets must extend _____ beyond the end of work surface 25ft - Answer️️ -Safety Nets must...
    (1)
  • $12.49
  • 1x sold
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Popular
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024 Popular
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
Contractor's License Exam Questions  and Answers 100% Pass
  • Contractor's License Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 34 pages • 2024
  • Available in package deal
  • Contractor's License Exam Questions and Answers 100% Pass Attachments to structural members The edges of lugs brackets, rivets and bolt heads attached to structural members shall be permitted to extend to within 1 inch of the surface of the fire protection Parapet construction The height of the parapet shall not be less than 30 inches above the point where the roof surface and the wall intersect. Combustible framing in fire walls Adjacent combustible members entering into a concret...
    (0)
  • $10.99
  • 1x sold
  • + learn more
NASCLA BOOKS COMBINED QUESTIONS WITH COMPLETE SOLUTIONS
  • NASCLA BOOKS COMBINED QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 81 pages • 2023
  • Available in package deal
  • When do you need a permit for a retaining wall correct answer: When it is over 4 feet tall The building official may revoke a permit if correct answer: it is issued in error or in violation of an ordinance Who can issue a notice of violation correct answer: Building Department Shear Wall resists correct answer: Lateral pressure What type of construction uses heavy timbers AND HIGHLIGHT CONSTRUCTION TYPES correct answer: type IV construction uses heavy timbers - the exterior is m...
    (0)
  • $18.49
  • 1x sold
  • + learn more
BC Owner Builder Exam | 186 Questions and Answers(A+ Solution guide)
  • BC Owner Builder Exam | 186 Questions and Answers(A+ Solution guide)

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • Order of inspections - 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop inspection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - An experienced excavator says it's ok At what depth is shorin...
    (0)
  • $8.49
  • 1x sold
  • + learn more
Contractor's License Exam Questions And All Verified Answers.
  • Contractor's License Exam Questions And All Verified Answers.

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • Attachments to structural members - Answer The edges of lugs brackets, rivets and bolt heads attached to structural members shall be permitted to extend to within 1 inch of the surface of the fire protection Parapet construction - Answer The height of the parapet shall not be less than 30 inches above the point where the roof surface and the wall intersect. Combustible framing in fire walls - Answer Adjacent combustible members entering into a concrete or masonry fire wall from oppos...
    (0)
  • $10.19
  • + learn more
NASCLA BOOKS COMBINED Questions with Complete Correct Answers | Grade A+
  • NASCLA BOOKS COMBINED Questions with Complete Correct Answers | Grade A+

  • Exam (elaborations) • 117 pages • 2024
  • Available in package deal
  • When do you need a permit for a retaining wall Ans: When it is over 4 feet tall The building official may revoke a permit if Ans: it is issued in error or in violation of an ordinance Who can issue a notice of violation Ans: Building Department Shear Wall resists Ans: Lateral pressure What type of construction uses heavy timbers AND HIGHLIGHT CONSTRUCTION TYPES Ans: type IV construction uses heavy timbers - the exterior is made of non-combustible materials and the interior of solid ...
    (0)
  • $15.29
  • + learn more
NASCLA BOOKS COMBINED | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass
  • NASCLA BOOKS COMBINED | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass

  • Exam (elaborations) • 69 pages • 2024
  • NASCLA BOOKS COMBINED | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass When do you need a permit for a retaining wall - Answer -When it is over 4 feet tall The building official may revoke a permit if - Answer -it is issued in error or in violation of an ordinance Who can issue a notice of violation - Answer -Building Department Shear Wall resists - Answer -Lateral pressure What type of construction uses heavy timbers AND HIGHLIGHT CONSTRUCTION TYPES - Answer -typ...
    (0)
  • $11.99
  • + learn more
NASCLA BOOKS COMBINED EXAM | 656 QUESTIONS WITH 100% CORRECT SOLUTIONS ALREADY PASSED!!
  • NASCLA BOOKS COMBINED EXAM | 656 QUESTIONS WITH 100% CORRECT SOLUTIONS ALREADY PASSED!!

  • Exam (elaborations) • 61 pages • 2023
  • Available in package deal
  • When do you need a permit for a retaining wall - When it is over 4 feet tall The building official may revoke a permit if - it is issued in error or in violation of an ordinance Who can issue a notice of violation - Building Department Shear Wall resists - Lateral pressure What type of construction uses heavy timbers AND HIGHLIGHT CONSTRUCTION TYPES - type IV construction uses heavy timbers - the exterior is made of non-combustible materials and the interior of solid or laminated wood. He...
    (0)
  • $19.39
  • + learn more
Contractor's License Exam questions with correct answers
  • Contractor's License Exam questions with correct answers

  • Exam (elaborations) • 30 pages • 2023
  • Available in package deal
  • Attachments to structural members CORRECT ANSWER The edges of lugs brackets, rivets and bolt heads attached to structural members shall be permitted to extend to within 1 inch of the surface of the fire protection Parapet construction CORRECT ANSWER The height of the parapet shall not be less than 30 inches above the point where the roof surface and the wall intersect. Combustible framing in fire walls CORRECT ANSWER Adjacent combustible members entering into a concrete or masonry fire wal...
    (0)
  • $14.99
  • + learn more