Pjm gen test Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pjm gen test? On this page you'll find 7 study documents about Pjm gen test.

All 7 results

Sort by

PJM Gen Test Questions & Answers 2024
  • PJM Gen Test Questions & Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • PJM Gen Test Questions & Answers 2024 If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - ANSWER-59.98 What is the PJM regulation requirement for the off-peak period? - ANSWER-525 Which of the following PJM reserves are NOT synchronized? - ANSWER-Non-synchronized (quick-start) What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assignin...
    (0)
  • $7.99
  • + learn more
PJM Test Questions - Answered (Complete Solutions)
  • PJM Test Questions - Answered (Complete Solutions)

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • PJM Test Questions - Answered (Complete Solutions) Which of the following statements are true concerning delays in restoring power to offline generation? a. the unit could suffer turbine shaft damage b. fuel oil for the unit could congeal c. startup time for the unit will be reduced d. the battery life used to maintain critical systems may run out During system restoration, you re-energize a fairly long distribution load circuit that has been off for several hours and notice that the loading i...
    (0)
  • $23.99
  • + learn more
PJM Gen Test
PJM Generation Cert Practice Exam Graded A+.
  • PJM Generation Cert Practice Exam Graded A+.

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • Actions in low voltage alert? - correct answer Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - correct answer Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - correct answer Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures...
    (0)
  • $13.99
  • + learn more
PJM Test Questions Well Answered And Graded A+.
  • PJM Test Questions Well Answered And Graded A+.

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - correct answer Dynamic Instability If PJM experienced an event...
    (0)
  • $13.99
  • + learn more
PJM Generation Dispatcher Exam Practice With 100% Verified Correct  Answers.
  • PJM Generation Dispatcher Exam Practice With 100% Verified Correct Answers.

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by special equipm...
    (0)
  • $12.99
  • + learn more
PJM Generation Dispatcher Exam  PRACTICE
  • PJM Generation Dispatcher Exam PRACTICE

  • Exam (elaborations) • 5 pages • 2023
  • PJM Generation Dispatcher Exam PRACTICE An EXCITER on a traditional generator does what? - CORRECT ANSWER-Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - CORRECT ANSWER-Limits When synchronizing to the interconnection, what needs to be synchronized? - CORRECT ANSWER-Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - CORRECT ANSWER-...
    (0)
  • $4.49
  • + learn more