R4b a boiler - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about R4b a boiler? On this page you'll find 14 study documents about R4b a boiler.
All 14 results
Sort by
-
ABSA 4B – 1 Questions with Complete Solutions 100% Verified Correct Answers
- Exam (elaborations) • 34 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
ABSA 4B – 1 Questions with Complete Solutions 100% Verified Correct Answers 
R4B An anti-friction bearing: Select one: 
a. Tapered rollers 
b. Is a sleeve bearing 
c. Has rolling friction 
d. Wears to a smooth, low-friction surface 
e. Is constructed with white metal alloy - Correct Answer c 
 
The amount of water used in an evaporative condenser is only a small percentage of that used in a water-cooled condenser of the same capacity, because 
Select one: 
a. Water is scarce where evaporativ...
-
4th TSSA Part B Test (I) 150 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
When a combustion air opening is equipped with dampers, the dampers must be - interlocked with 
the burner, and fully open before starting the boiler. 
R4B A substance that absorbs humidity inside a boiler during dry layup is: - Activated 
alumina 
(4-142-1.3) The high oil temperature shutdown device of an oil-fired heater senses the: - Oil 
temperature at the furnace outlet 
R4B A boiler furnace pre-purge: - must last a specific amount of time. 
R4B In a building plumbing system, the potable wa...
-
4th TSSA Part B Test (I) 150 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
When a combustion air opening is equipped with dampers, the dampers must be - interlocked with 
the burner, and fully open before starting the boiler. 
R4B A substance that absorbs humidity inside a boiler during dry layup is: - Activated 
alumina 
(4-142-1.3) The high oil temperature shutdown device of an oil-fired heater senses the: - Oil 
temperature at the furnace outlet 
R4B A boiler furnace pre-purge: - must last a specific amount of time. 
R4B In a building plumbing system, the potable wa...
-
4th TSSA Part B Test (I) 150 Questions With 100% Correct Answers.
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
When a combustion air opening is equipped with dampers, the dampers must be - interlocked 
with the burner, and fully open before starting the boiler. 
R4B A substance that absorbs humidity inside a boiler during dry layup is: - Activated 
alumina 
(4-142-1.3) The high oil temperature shutdown device of an oil-fired heater senses the: - Oil 
temperature at the furnace outlet 
R4B A boiler furnace pre-purge: - must last a specific amount of time. 
R4B In a building plumbing system, the potable wa...
-
4th TSSA Part B - Unit 4 UPDATED Exam Questions and CORRECT Answers
- Exam (elaborations) • 10 pages • 2024
-
- $8.49
- + learn more
4th TSSA Part B - Unit 4 UPDATED Exam 
Questions and CORRECT Answers 
Larger capacity, high pressure fuel trains are - Ans more complex 
The main burner test firing valve should be opened - Ans before starting the main burner 
What is the recommended boiler water pH for wet layup? - Ans 10 
R4B Failure to _____ the furnace thoroughly before light-up can cause a furnace 
explosion. - Ans purge
And that's how you make extra money
-
4th TSSA Part B - Unit 5 Exam Guide Questions and CORRECT Answers
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
4th TSSA Part B - Unit 5 Exam Guide 
Questions and CORRECT Answers 
R4B A steam boiler that is to be shut down for a long period of time should be: - 
Ans Drained, thoroughly dried, have desiccant placed inside, and closed up 
R4B When two or more sling eyes are used when lifting an object, they should be: - 
Ans Held in a shackle
-
4th TSSA Part B Unit 4 Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
4th TSSA Part B Unit 4 Exam Questions and Answers 
Larger capacity, high pressure fuel trains are - Answer-more complex 
 
The main burner test firing valve should be opened - Answer-before starting the main burner 
 
What is the recommended boiler water pH for wet layup? - Answer-10 
 
R4B Failure to _____ the furnace thoroughly before light-up can cause a furnace explosion. - Answer-purge 
 
R4B When cooling down a steam boiler that has been taken out of service, a vent valve on a steam drum ...
-
4th TSSA Part B Unit 4 Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2023
-
- $9.99
- + learn more
4th TSSA Part B Unit 4 
Exam Questions and 
Answers 
 
Larger capacity, high pressure fuel trains are - Answer-more complex 
The main burner test firing valve should be opened - Answer-before starting the main 
burner 
What is the recommended boiler water pH for wet layup? - Answer-10 
R4B Failure to _____ the furnace thoroughly before light-up can cause a 
furnace explosion. - Answer-purge 
R4B When cooling down a steam boiler that has been taken out of service, 
a vent valve on a steam drum sh...
-
Power Engineering 4th Class - Unit B5 Review Exam Questions And Answers 100% Pass
- Exam (elaborations) • 20 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Power Engineering 4th Class - Unit B5 
Review Exam Questions And Answers 100% 
Pass 
R4B A steam boiler that is to be shut down for a long period of time should be: 
Select one: 
a. Drained, thoroughly dried, have desiccant placed inside, and closed up 
b. Left with the water at normal working level but opened up to atmosphere 
c. Left with the water at normal working level and pressurized with air to 50 kPa 
d. Filled completely with water and the vent left open to atmosphere for expansion - an...
-
4th TSSA Part B Test (I) Questions With 100% Correct Answers!!
- Exam (elaborations) • 10 pages • 2024
-
- $13.99
- + learn more
4th TSSA Part B Test (I) Questions With 100% Correct Answers!!
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia