What are batter boards - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about What are batter boards? On this page you'll find 120 study documents about What are batter boards.

All 120 results

Sort by

Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss
  • Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • SITEWORK, FOOTING, AND FONDATIONS FIRST SECTION A foundation drain shall extend past the outside edge of the footing at least how far? 12 inches What are batter boards? Stakes and ledger boards marking building lines. What is the purpose of a cove or can't strip at a foundation joint? Deflect water from the foundation wall. What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wal...
    (1)
  • $13.99
  • 1x sold
  • + learn more
Virginia hic Exam Questions with Correct Answers.
  • Virginia hic Exam Questions with Correct Answers.

  • Exam (elaborations) • 5 pages • 2024
  • Virginia hic Exam Questions with Correct Answers. The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood studs is - Answer- 1 1/4 inches What is the MINIMUM breaking strength required of safety belt lanyards - Answer5,400 pounds What is the MINIMUM clearance that combustible insulation MUST other heatproducing devices - Answer- 1 inch What is the MAXIMUM flame spread index for insulation materials - Answer- 25 The amount of water per sack of cement is what controls a...
    (0)
  • $10.99
  • 1x sold
  • + learn more
Virginia HIC Exam QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED) Popular
  • Virginia HIC Exam QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)

  • Exam (elaborations) • 15 pages • 2024 Popular
  • Available in package deal
  • Virginia HIC Exam QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)
    (1)
  • $9.99
  • 4x sold
  • + learn more
Virginia HIC Exam (Home Improvement Exam) Questions With Complete Solutions.
  • Virginia HIC Exam (Home Improvement Exam) Questions With Complete Solutions.

  • Exam (elaborations) • 7 pages • 2023
  • Virginia HIC Exam (Home Improvement Exam) Questions With Complete Solutions.
    (2)
  • $13.99
  • 15x sold
  • + learn more
Virginia HIC Exam Questions All Correctly Answered
  • Virginia HIC Exam Questions All Correctly Answered

  • Exam (elaborations) • 8 pages • 2024
  • Virginia HIC Exam Questions All Correctly Answered |The MOST specific information about the size and location of windows would be found in a, What direction does heat flow?, What are batter boards, What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building?, What is NOT required in exterior nonbearing walls?, A lengthwise grain separation between or through the growth rings of lumber is called a, The abbreviation "d" in "16d" means, Not...
    (0)
  • $11.49
  • + learn more
Virginia HIC Home Improvement Exam Study Guide Questions with Complete Solutions
  • Virginia HIC Home Improvement Exam Study Guide Questions with Complete Solutions

  • Exam (elaborations) • 10 pages • 2024
  • Virginia HIC Home Improvement Exam Study Guide Questions with Complete Solutions The MOST specific information about the size and location of windows would be found in a - Correct Answer Floor plan What direction does heat flow? - Correct Answer Hot to cold What are batter boards - Correct Answer stakes and ledger boards marking building lines What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building? - Correct Answer 3 feet ...
    (0)
  • $11.49
  • + learn more
Virginia HIC Exam with Complete Solutions
  • Virginia HIC Exam with Complete Solutions

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Virginia HIC Exam with Complete Solutions The MOST specific information about the size and location of windows would be found in a Correct answer Floor plan What direction does heat flow? Correct answer Hot to cold What are batter boards Correct answer stakes and ledger boards marking building lines What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building? Correct answer 3 feet What is NOT required in exterior nonbearing walls? ...
    (0)
  • $11.99
  • + learn more
Price - Engineering 1 - LMS Paxton Patterson (Alt. Energy, Construction, Environmental technology) Latest  Update Graded A+
  • Price - Engineering 1 - LMS Paxton Patterson (Alt. Energy, Construction, Environmental technology) Latest Update Graded A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Price - Engineering 1 - LMS Paxton Patterson (Alt. Energy, Construction, Environmental technology) Latest Update Graded A+ _____ filters out ultraviolet radiation from sunlight. The Ozone Layer __________ are placed at the top of a window or door during construction. Headers ____________ is the height from the top of the walls to the top of the roof. Rise ______________ are teams of students who patrol their school, checking for energy waste. Watt Watchers __________________...
    (0)
  • $9.99
  • + learn more
Virginia HIC Exam (Home Improvement Exam) Questions with verified Complete Solutions
  • Virginia HIC Exam (Home Improvement Exam) Questions with verified Complete Solutions

  • Exam (elaborations) • 9 pages • 2024
  • Virginia HIC Exam (Home Improvement Exam) Questions with verified Complete Solutions The MOST specific information about the size and location of windows would be found in a --correct answer--Floor plan What direction does heat flow? --correct answer--Hot to cold What are batter boards --correct answer--stakes and ledger boards marking building lines What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building? --correct answer--3 feet
    (0)
  • $11.99
  • + learn more
IEC 315 Study Guide Questions with  Verified Solutions
  • IEC 315 Study Guide Questions with Verified Solutions

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • IEC 315 Study Guide Questions with Verified Solutions A minimum of ???? sets of batter boards is required to establish the building lines when forming a slab. Two A person working in the BCES kitchen controls the supply and exhaust (SF-21 and EF-22) by operating ??? that are wall mounted near the cooking hood. One single pole switch AHUs at BCES are to be connected using??? FMC At BCES, EF-1 is ON when AHU-1 is ON True At BCES, EF-2 is located ??? above the toilet it serves. ...
    (0)
  • $9.99
  • + learn more