When should floor slabs Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about When should floor slabs? On this page you'll find 102 study documents about When should floor slabs.

All 102 results

Sort by

ACI Flatwork Exam All Possible Questions and Answers with complete solution Popular
  • ACI Flatwork Exam All Possible Questions and Answers with complete solution

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • It is important that the ____________ __________ read and understand project specifications. - Answer-finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - Answer-100 Concrete is sold by the ton? - Answer-False Delays in discharging concrete trucks can result in the concrete being hard to: - Answer-pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump ho...
    (0)
  • $7.99
  • 2x sold
  • + learn more
Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss Popular
  • Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss

  • Exam (elaborations) • 8 pages • 2024 Popular
  • Available in package deal
  • SITEWORK, FOOTING, AND FONDATIONS FIRST SECTION A foundation drain shall extend past the outside edge of the footing at least how far? 12 inches What are batter boards? Stakes and ledger boards marking building lines. What is the purpose of a cove or can't strip at a foundation joint? Deflect water from the foundation wall. What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wal...
    (1)
  • $13.99
  • 1x sold
  • + learn more
Michigan Builders License Exam Questions With Correct Answers
  • Michigan Builders License Exam Questions With Correct Answers

  • Exam (elaborations) • 71 pages • 2023
  • Available in package deal
  • Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) Administrative - Answer First 2 chapters of code book are True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Answer Does the building official have the authority to render interpretations o...
    (3)
  • $13.49
  • 5x sold
  • + learn more
Az ROC Trade Exam B-3 License Correctly Solved Already Passed A+
  • Az ROC Trade Exam B-3 License Correctly Solved Already Passed A+

  • Exam (elaborations) • 35 pages • 2023
  • Az ROC Trade Exam B-3 License Correctly Solved Already Passed A+ Nails used for installing Hardboard panel siding vertically must accommodate the sheathing and penetrate the framing a minimum of how much? *ANS* 1-1/2 inches When framing openings in floors with a header and trimmer joists, what maximum header joist span is allowed with a single member header? *ANS* 4 feet Above the handrail and below the head, what is the minimum clear opening on a stairwell? *ANS* 36 inches When inst...
    (0)
  • $10.49
  • 1x sold
  • + learn more
c8 cslb study Exam | Questions and Answers  Graded A+ Latest 2024/2025
  • c8 cslb study Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 33 pages • 2024
  • c8 cslb study Exam | Questions and Answers Graded A+ Latest 2024/2025 If a footing cracks, what is the most likely cause? A. concrete being poured on a hot day B. forms not placed correctly C. too much soil in forms D. poor soil stability D. Poor soil stability What will result from heavy abrasion of concrete floor slabs? A.Curing B.Dusting C.hydration D. Scaling B scaling What do you do to reduce scaling? A. adding admixtures b. air entrainment c. heating d. cooling B. Air e...
    (0)
  • $12.49
  • + learn more
Building Construction Exam 2 with correct answers 2024
  • Building Construction Exam 2 with correct answers 2024

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • What is not a type of deep foundation? - answer-spread footing What would be constructed with a flared bottom when used in clay soil to improve its bearing capacity? - answer-belled caisson What pile would have one of the lowest capacity based strength of the material it is made from? - answer-Timber pile What type of portland cement should be used in a concrete mix when the concrete must gain strength as fast as possible so that a contractor can strip forms as soon as possible? - answe...
    (0)
  • $7.99
  • 1x sold
  • + learn more
Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) 100% Pass
  • Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) 100% Pass

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) 100% Pass (Ch. 1, #1) It is important that the _______ _______ read and understand project specifications finishing foreman (Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer's rate should be about ____ yd^3(m^3) per hour. 100 (Ch 1, #3) True or False: Concrete is sold by the ton. False (sold by volume) (Ch. 1, #4) Delays in discharging concrete trucks can result in the concrete bein...
    (0)
  • $10.99
  • + learn more
NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+
  • NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+

  • Exam (elaborations) • 27 pages • 2023
  • NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ Construction issues - -Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of numeracy and literacy of workers Non-English speaking workers High risk areas for injuries in construction - -Falls from height Slips, trips and falls Being struck by falling/moving objects Manual ...
    (0)
  • $11.49
  • 1x sold
  • + learn more
ACI Flatwork Questions and Answers  Already Passed
  • ACI Flatwork Questions and Answers Already Passed

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • ACI Flatwork Questions and Answers Already Passed It is important that the ____________ __________ read and understand project specifications. finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. 100 Concrete is sold by the ton? False Delays in discharging concrete trucks can result in the concrete being hard to: pump, place, and finish When there is room for two concrete trucks read...
    (0)
  • $9.99
  • + learn more
ACI Concrete/Masonry Exam Chapters 1-10 Questions and Answers Fully solved
  • ACI Concrete/Masonry Exam Chapters 1-10 Questions and Answers Fully solved

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • ACI Concrete/Masonry Exam Chapters 1-10 Questions and Answers Fully solved Concrete is sold by the ton T/F False ( by Volume) Delays in discharging concrete trucks can result in the concrete being hard to: Pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster because: as one truck is finishing, the other is ready to unload concrete You can tell when water was added to the truck by looking at the: Ba...
    (0)
  • $15.49
  • + learn more