Academic1
On this page, you find all documents, package deals, and flashcards offered by seller Academic1.
- 1002
- 0
- 101
Community
- Followers
- Following
6 Reviews received
1103 items
CDT Practice Questions and Answers latest Actual Exam
CDT Practice Questions and Answers 
latest Actual Exam 
Sheet keynote or reference keynote - CORRECT ANSWER-a notation on a single 
drawing sheet 
"A facility's "life cycle" includes all of the following EXCEPT: 
a. Project conception 
b. Financing 
c. Construction 
d. Facility management" - CORRECT ANSWER-1. b - PRM 1.4 Life cycle Stages: 
Conceptions, Delivery Method, Design, Psrocurement, Construction, 
What does CSI's UDS do ? what does it stand for ? - CORRECT ANSWER-UDS 
uniform d...
- Package deal
- Exam (elaborations)
- • 31 pages •
CDT Practice Questions and Answers 
latest Actual Exam 
Sheet keynote or reference keynote - CORRECT ANSWER-a notation on a single 
drawing sheet 
"A facility's "life cycle" includes all of the following EXCEPT: 
a. Project conception 
b. Financing 
c. Construction 
d. Facility management" - CORRECT ANSWER-1. b - PRM 1.4 Life cycle Stages: 
Conceptions, Delivery Method, Design, Psrocurement, Construction, 
What does CSI's UDS do ? what does it stand for ? - CORRECT ANSWER-UDS 
uniform d...
CDT Exam Prep chapter 1-4 Questions and Elaborated Answers
CDT Exam Prep chapter 1-4 Questions 
and Elaborated Answers 
Bidding documents are considered legal documents? 
▪ True. 
▪ False. - CORRECT ANSWER-False 
Codes governing commercial construction and residential construction are different? 
▪ True. 
▪ False. - CORRECT ANSWER-True 
The A/E usually hires a construction manager? - CORRECT ANSWER-False 
The Owner, Contractor and A/E are parties to the construction agreement? 
▪ True. 
▪False. - CORRECT ANSWER-False 
There are no differenc...
- Package deal
- Exam (elaborations)
- • 27 pages •
CDT Exam Prep chapter 1-4 Questions 
and Elaborated Answers 
Bidding documents are considered legal documents? 
▪ True. 
▪ False. - CORRECT ANSWER-False 
Codes governing commercial construction and residential construction are different? 
▪ True. 
▪ False. - CORRECT ANSWER-True 
The A/E usually hires a construction manager? - CORRECT ANSWER-False 
The Owner, Contractor and A/E are parties to the construction agreement? 
▪ True. 
▪False. - CORRECT ANSWER-False 
There are no differenc...
CDT Practice Exam Final questions and answers A-graded
CDT Practice Exam Final questions and 
answers A-graded 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - CORRECT ANSWER-Answer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usua...
- Package deal
- Exam (elaborations)
- • 29 pages •
CDT Practice Exam Final questions and 
answers A-graded 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - CORRECT ANSWER-Answer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usua...
CDT Practice Exam Final questions and answers A-graded
CDT Practice Exam Final questions and 
answers A-graded 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - CORRECT ANSWER-Answer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usua...
- Package deal
- Exam (elaborations)
- • 29 pages •
CDT Practice Exam Final questions and 
answers A-graded 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - CORRECT ANSWER-Answer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usua...
CSI CDT Exam Study Guide (questions and answers) 100% solved
CSI CDT Exam Study Guide (questions 
and answers) 100% solved 
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, 
provides funding 
AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, 
safety and welfare 
Design Team - CORRECT ANSWER-Address planning issues, determine design 
program, identify codes and regulations, produce procurement and construction 
documents, administer construction contract, *provide QA/QC procedures* 
Contractor...
- Package deal
- Exam (elaborations)
- • 15 pages •
CSI CDT Exam Study Guide (questions 
and answers) 100% solved 
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, 
provides funding 
AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, 
safety and welfare 
Design Team - CORRECT ANSWER-Address planning issues, determine design 
program, identify codes and regulations, produce procurement and construction 
documents, administer construction contract, *provide QA/QC procedures* 
Contractor...
CSI CDT Exam Study Guide (questions and answers) 100% solved
CSI CDT Exam Study Guide (questions 
and answers) 100% solved 
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, 
provides funding 
AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, 
safety and welfare 
Design Team - CORRECT ANSWER-Address planning issues, determine design 
program, identify codes and regulations, produce procurement and construction 
documents, administer construction contract, *provide QA/QC procedures* 
Contractor...
- Package deal
- Exam (elaborations)
- • 15 pages •
CSI CDT Exam Study Guide (questions 
and answers) 100% solved 
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, 
provides funding 
AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, 
safety and welfare 
Design Team - CORRECT ANSWER-Address planning issues, determine design 
program, identify codes and regulations, produce procurement and construction 
documents, administer construction contract, *provide QA/QC procedures* 
Contractor...
CDT Exam questions and Answers 100% Correct
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
- Package deal
- Exam (elaborations)
- • 53 pages •
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
CDT exam Questions with Correct Answers (solved)
CDT exam Questions with Correct 
Answers (solved) 
1. The method of computation of Contractor's overhead and profits for Change Order 
prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - CORRECT AN...
- Package deal
- Exam (elaborations)
- • 16 pages •
CDT exam Questions with Correct 
Answers (solved) 
1. The method of computation of Contractor's overhead and profits for Change Order 
prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - CORRECT AN...
BICSI Installer 2 Technician exam Questions with elaborated answers 2024
BICSI Installer 2 Technician exam 
Questions with elaborated answers 2024 
1 - CORRECT ANSWER-KEY TERMS 
Choose Correct Term: 
1. Attenuation, 2. Bandwidth, 3. Cable Loss, 4. Cladding, 5. Connector, 6. Dispersion, 7. 
Ferrule (Optical Fiber), 8. FC, 9. Furcating Harness, 10. Insertion Loss, 11. LC 
Connector/Adapter, 12. Multimode Optical Fiber, 13. SFF, 14. SC 
Definition: 
The decrease in magnitude or the power loss of a signal that propagates between 
points, expressed in decibels (dB) as ...
- Package deal
- Exam (elaborations)
- • 46 pages •
BICSI Installer 2 Technician exam 
Questions with elaborated answers 2024 
1 - CORRECT ANSWER-KEY TERMS 
Choose Correct Term: 
1. Attenuation, 2. Bandwidth, 3. Cable Loss, 4. Cladding, 5. Connector, 6. Dispersion, 7. 
Ferrule (Optical Fiber), 8. FC, 9. Furcating Harness, 10. Insertion Loss, 11. LC 
Connector/Adapter, 12. Multimode Optical Fiber, 13. SFF, 14. SC 
Definition: 
The decrease in magnitude or the power loss of a signal that propagates between 
points, expressed in decibels (dB) as ...
Technician BICSI Exam Final questions and answers 2024
Technician BICSI Exam Final questions 
and answers 2024 
This space generally houses equipment that serves an entire building, campus or 
customer. - CORRECT ANSWER-Equipment Room (ER) 
A _________ is an enclosed architectural space for housing telecommunications 
equipment, cable terminations, and cross-connect cabling. - CORRECT ANSWERTelecommunications Room (TR) 
The telecommunications service entrance to the building is called the _____ - 
CORRECT ANSWER-Entrance Facility (EF) 
A _____ t...
- Package deal
- Exam (elaborations)
- • 4 pages •
Technician BICSI Exam Final questions 
and answers 2024 
This space generally houses equipment that serves an entire building, campus or 
customer. - CORRECT ANSWER-Equipment Room (ER) 
A _________ is an enclosed architectural space for housing telecommunications 
equipment, cable terminations, and cross-connect cabling. - CORRECT ANSWERTelecommunications Room (TR) 
The telecommunications service entrance to the building is called the _____ - 
CORRECT ANSWER-Entrance Facility (EF) 
A _____ t...
Red Cross Lifeguarding Practice Test Exam 2024/2025
Red Cross Lifeguarding Multiple Choices Exam 100% Verified 2024/2025
Colorado Mental Health Jurisprudence Exam 2024 Questions and Answers 100% Correct
Colorado Mental Health Jurisprudence Exam Study Guide 2024
I downloaded it. Now can't find it. S
AAA Food Manager Certification Exam 100% Verified Answers