macellen education agencies
Am an expert on major courses especially; psychology,Nursing, Human resource Management,Accounting,Law ,History and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why in STUVIA. I assure a GOOD GRADE if you will use my DOCUMENTS and ensure 100% distinction to students who uses Documents offered by hopejewels!!!!!! SUCCESS IN YOUR STUDIES . WELCOME ALL
- 3031
- 0
- 104
Community
- Followers
- Following
1 Reviews received
3135 items
CSLB contractor B exam (plumbing with correct answers 2024
acid waste piping correct answers System piping and fittings that are resistant to acid contents usually found in manufacturing 
processes. 
 
aerator correct answers A device used to mix air and water with water distribution and water conservation in mind; e.g., faucets. 
 
air gap (drainage system) correct answers The unobstructed vertical distance through the free atmosphere between the outlet of a 
waste pipe and the flood level rim of the receptacle into which the waste pipe is dischargi...
- Exam (elaborations)
- • 6 pages •
acid waste piping correct answers System piping and fittings that are resistant to acid contents usually found in manufacturing 
processes. 
 
aerator correct answers A device used to mix air and water with water distribution and water conservation in mind; e.g., faucets. 
 
air gap (drainage system) correct answers The unobstructed vertical distance through the free atmosphere between the outlet of a 
waste pipe and the flood level rim of the receptacle into which the waste pipe is dischargi...
Law exam with correct answers 2024
How long will the Contractors State License Board (CSLB), hold a contractor responsible for observable defects? correct answers 4 years 
 
What is the purpose of the "Preliminary 20-day Notice"? correct answers Assert mechanic's lien and stop notice rights 
 
The Contractors State License Board (CSLB), offers a free voluntary arbitration program for disputes involving alleged damages: _____________. correct answers Between $15,000 and $50,000 
 
In drawing up "Home Improvement Con...
- Exam (elaborations)
- • 7 pages •
How long will the Contractors State License Board (CSLB), hold a contractor responsible for observable defects? correct answers 4 years 
 
What is the purpose of the "Preliminary 20-day Notice"? correct answers Assert mechanic's lien and stop notice rights 
 
The Contractors State License Board (CSLB), offers a free voluntary arbitration program for disputes involving alleged damages: _____________. correct answers Between $15,000 and $50,000 
 
In drawing up "Home Improvement Con...
CSLB Ch 1 exam with correct answers 2024
can you worked unlicensed? correct answers You can only do jobs under $500 if unlicensed 
 
What does the registrar of Contractors do? correct answers investigate customer complaints, educate the public, discipline contractors, and perform similar duties 
 
what happens when you get caught working without a license (1st time) correct answers $5000 fine, counts as misdemeanor, and/or jail sentence up to 6 months 
 
what happens when you get caught working without a license (2nd time) correct ...
- Exam (elaborations)
- • 3 pages •
can you worked unlicensed? correct answers You can only do jobs under $500 if unlicensed 
 
What does the registrar of Contractors do? correct answers investigate customer complaints, educate the public, discipline contractors, and perform similar duties 
 
what happens when you get caught working without a license (1st time) correct answers $5000 fine, counts as misdemeanor, and/or jail sentence up to 6 months 
 
what happens when you get caught working without a license (2nd time) correct ...
Law & Business exam with correct answers 2024
On a public works project if the subcontractor's percentage of the total bid exceeds ______ the prime contractor must included the subcontractor's name and address in the bid. correct answers 0.5% 
 
Which fees are NOT paid for by the Registrar in a CSLB arbitration? correct answers Attorney's fees 
 
When there is a third party lender, a contractor may enforce the home improvement contract after three business days from the: correct answers date the loan and the contract are complet...
- Exam (elaborations)
- • 9 pages •
On a public works project if the subcontractor's percentage of the total bid exceeds ______ the prime contractor must included the subcontractor's name and address in the bid. correct answers 0.5% 
 
Which fees are NOT paid for by the Registrar in a CSLB arbitration? correct answers Attorney's fees 
 
When there is a third party lender, a contractor may enforce the home improvement contract after three business days from the: correct answers date the loan and the contract are complet...
CA Contractor's Law and Business exam with correct answers 2024
A health and safety order must be: correct answers posted in a conspicuous place at the job site 
 
Of the following, which is a correct statement regarding a schedule of payments in an original bid? correct answers You are not required to include a schedule of payments in the original bid. 
 
Which of the following best describes the difference between "claims-made" and "occurrence" types of liability insurance? correct answers Unlike claims-made coverage, occurrence insurance co...
- Exam (elaborations)
- • 10 pages •
A health and safety order must be: correct answers posted in a conspicuous place at the job site 
 
Of the following, which is a correct statement regarding a schedule of payments in an original bid? correct answers You are not required to include a schedule of payments in the original bid. 
 
Which of the following best describes the difference between "claims-made" and "occurrence" types of liability insurance? correct answers Unlike claims-made coverage, occurrence insurance co...
California Contractors License exam with correct answers 2024
Who does not need a contractors License? correct answers someone who does certain construction on commercial agricultural property 
 
The contractor surety Bond necessary for most contractors to obtain their license is in the amount of correct answers $15,000 
 
When licensed as a Sole Proprietor the license belongs to correct answers the Company 
 
Which is true of an inactive license? correct answers Must be renewed every 4 Years 
 
How many classifications can an RME apply for? correct a...
- Exam (elaborations)
- • 4 pages •
Who does not need a contractors License? correct answers someone who does certain construction on commercial agricultural property 
 
The contractor surety Bond necessary for most contractors to obtain their license is in the amount of correct answers $15,000 
 
When licensed as a Sole Proprietor the license belongs to correct answers the Company 
 
Which is true of an inactive license? correct answers Must be renewed every 4 Years 
 
How many classifications can an RME apply for? correct a...
ATI - MUSCULOSKELETAL BUNDLED EXAMS WITH 100% CORRECT ANSWERS 2024
ATI - MUSCULOSKELETAL EXAM WITH 100% CORRECT ANSWERS 2024
ATI NCLEX EXAM WITH CORRECT ANSWERS 2024

- Package deal
- • 23 items •
- ATI 2 PHARMACOLOGY QUIZ BANK with perfect choices 2024 • Exam (elaborations)
- ATI - MUSCULOSKELETAL EXAM WITH 100% CORRECT ANSWERS 2024 • Exam (elaborations)
- ATI Final Exam With correct answers 2024 • Exam (elaborations)
- ATI PROCTORED EXAM WITH CORRECT ANSWERS 2024 • Exam (elaborations)
- ATI Proctored Exam With correct answers 2024 • Exam (elaborations)
- And more ….
ATI - MUSCULOSKELETAL EXAM WITH 100% CORRECT ANSWERS 2024
ATI NCLEX EXAM WITH CORRECT ANSWERS 2024

contractor law and business exam with correct answers 2024
the contractor state license board has ruled the the preliminary notice is mandatory if a contractor work under a contract is valued at over correct answers $400 
 
a subcontractor must file a lien within a certain number of days after the filing of a notice of completion correct answers 30 days 
 
in order for the owner to avoid a mechanics lien when he has become aware that the tenant ordered repairs to the property a notice of non responsibility must be posted in a conspicuous place and the...
- Exam (elaborations)
- • 8 pages •
the contractor state license board has ruled the the preliminary notice is mandatory if a contractor work under a contract is valued at over correct answers $400 
 
a subcontractor must file a lien within a certain number of days after the filing of a notice of completion correct answers 30 days 
 
in order for the owner to avoid a mechanics lien when he has become aware that the tenant ordered repairs to the property a notice of non responsibility must be posted in a conspicuous place and the...
Contractors License General B Trade exam with correct answers 2024
A ladder should extend a minimum of ____ above the top of a trench or excavation. correct answers 3' 
 
According to OSHA, shoring lumber shall be _______. correct answers select structural 
 
Cal/OSHA inspectors cannot, under most circumstances: correct answers enter a business outside of normal business hours 
 
Every employer is required to post Material Safety Data Sheets: correct answers on each job site 
 
Handrails must be installed on all open sides of a scaffold if workers are su...
- Exam (elaborations)
- • 7 pages •
A ladder should extend a minimum of ____ above the top of a trench or excavation. correct answers 3' 
 
According to OSHA, shoring lumber shall be _______. correct answers select structural 
 
Cal/OSHA inspectors cannot, under most circumstances: correct answers enter a business outside of normal business hours 
 
Every employer is required to post Material Safety Data Sheets: correct answers on each job site 
 
Handrails must be installed on all open sides of a scaffold if workers are su...
Sample questions from all CSLB exam with correct answers 2024
The lifting lines should be as vertical as possible correct answers When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? 
 
A. One lifting line should be horizontal 
B. The lifting lines should be as far apart as possibles 
C. The lifting lines should be as horizontal as possible 
D. The lifting lines should be as vertical as possible 
 
Material that contains more than 1% asbestos c...
- Exam (elaborations)
- • 20 pages •
The lifting lines should be as vertical as possible correct answers When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? 
 
A. One lifting line should be horizontal 
B. The lifting lines should be as far apart as possibles 
C. The lifting lines should be as horizontal as possible 
D. The lifting lines should be as vertical as possible 
 
Material that contains more than 1% asbestos c...
cx coordinator exam stellantis with 100% correct solutions 2024
This test has 120 questions only 12 are here