logo-home

Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence.

Community

  • Followers
  • Following

114 Reviews received

18268 items

Certified Storm Water Operator Exam Questions and Answers 100% Pass

(0)
$12.49
0x  sold

Certified Storm Water Operator Exam Questions and Answers 100% Pass Erosion is the process where soil particles are ______________ or ____________ and put in motion. (Unit 1) - Dislodged; detached Sedimentation is the process whereby detached particles are ___________________ elsewhere. (Unit 1) - Deposited Sediment is solid ________________ or _______________ particulate matter that has been removed from its site of origin by ___________, _____________, or ______________ and deposited el...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 17 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

Walmart - Stormwater Exam Questions and Answers 100% Pass

(0)
$10.49
0x  sold

Walmart - Stormwater Exam Questions and Answers 100% Pass The 1970's law that set into place the regulation of stormwater is: - The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - NPDES Which of the following is never an allowable stormwater discharge from a construction site? - Discharge from contaminated groundwater The Notice of termination can filed when: - All construction activity, inside and outside...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 3 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

SDEP Stormwater Exam Questions and Answers 100% Pass

(0)
$12.49
0x  sold

SDEP Stormwater Exam Questions and Answers 100% Pass Erosion is - The process by which the land surface is worn away by the action of wind, water, and gravity. Which of the following describes sedimentation? - The settling out of soil particles transported by water and wind. The main two types of soil erosion discussed in this training are: - Wind and water An example of a physical effect of erosion and sedimentation is: - Increased flooding. What are the four factors that influence the ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 9 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

VA DEQ ESC Inspector Exam Questions and Answers 100% Pass

(0)
$13.49
0x  sold

VA DEQ ESC Inspector Exam Questions and Answers 100% Pass VESCP - Virginia Erosion and Sediment Control Program - Administered by counties/cities (must), towns (may) - MUST BE APPROVED Minimum Standard 1 - Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 37 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

VA DEQ SWM Inspector Exam Questions and Answers 100% Pass

(0)
$11.49
0x  sold

VA DEQ SWM Inspector Exam Questions and Answers 100% Pass What element is targeted by water quality criteria? - Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - 25% what is the site-based load limit for water quality? - 0.41 lbs/acre/yr total phosphorous Virginia Runoff Reduction Method- method of load calculations - load calculations based on land cover type and soil type. what must happen to potential...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 7 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

DEQ- Stormwater Mangement Inspector Exam Questions and Answers 100% Pass

(0)
$12.49
0x  sold

DEQ- Stormwater Mangement Inspector Exam Questions and Answers 100% Pass What two plans in the SWPPP must be approved? - Erosion and sediment control plans and stormwater management plans must be approved. Does the stormwater management plan address runoff during construction or after? - The stormwater management plan addresses post-construction stormwater runoff. What impact does impervious cover have on water quality? - Impervious cover increases stormwater runoff volume and velocity, l...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 8 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

Stormwater Management Inspector Prep Questions and Answers 100% Pass

(0)
$13.49
0x  sold

Stormwater Management Inspector Prep Questions and Answers 100% Pass What are the types of disconnection allowed for rooftop disconnection? - 1) simple disconnection - rooftops and/or on-lot residential impervious surfaces are directed to pervious areas 2) disconnection leading to an alternative runoff reduction practice adjacent to the roof (ex: soil compost amended filter path) Why have a rooftop disconnection to an alternative practice? - -lot size too small -filter width is too narrow...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 30 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x

ARE – SWPPP Exam Questions and Answers 100% Pass

(0)
$12.49
0x  sold

ARE – SWPPP Exam Questions and Answers 100% Pass What is an SWPPP? - - Identifies potential sources of stormwater pollution at the construction site - Describes practices to reduce pollutants in storm water discharges from the construction site - Identifies procedures the operator will implement to comply with the terms and conditions of a construction general permit Reduction of pollutants is often achieved by: - Controlling the volume of stormwater runoff Impervious surfaces such as b...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 9 pages • 
  • by KatelynWhitman • 
  • uploaded  2024
Quick View
i x