logo-home

LECT EXAMS

FOR THE BEST ASSIGNMENTS,TEST BANKS,EASSY AND TO HELP IN TUTORING

I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc , and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules

For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!

Community

  • Followers
  • Following

329 Reviews received

13224 items

WGU C201 Business Acumen Questions And Answers

(0)
$12.49
0x  sold

WGU C201 Business Acumen Questions And Answers What is Management? ANS Management is the process of achieving Organizational objectives through people and other resources. The Manager's job is to combine Human and Technical resources in the best way possible to achieve the company's goals. How do the jobs of top managers, middle managers, and supervisory managers differ? ANS Top managers design long term plans, set a direction for their organization and inspire all employees to achie...

i x
  • Exam (elaborations)
  •  • 12 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Rigging Practice Questions And Answers With Verified Solutions

(0)
$11.99
0x  sold

Rigging Practice Questions And Answers With Verified Solutions A load chart range diagram can best be used to help identify: ANS net capacity for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity requires the radius to be verified? ANS 80% the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? ANS 3/4 in when tying knots in synthetic rope lashing, the rated load is increased by 50% ? ANS false the size of shackle ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 7 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Rigger Safety Training Course Questions And Answers Rated A+

(0)
$11.49
0x  sold

Rigger Safety Training Course Questions And Answers Rated A+ According to OSHA, slings used in a basket hitch shall have the loads_____ to prevent slippage. ANS Balanced When slings encounter sharp edges on loads to be lifted, riggers shall ensure that slings are: ANS protected or padded According to ASME B30.9, what is the maximum width of an object that can be placed in the eye of a wire rope sling? ANS ½ the length According to OSHA, each day before being used, the sling and all...

i x
  • Exam (elaborations)
  •  • 7 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Rigging Questions And Answers With Verified Updates

(0)
$11.49
0x  sold

Advanced Rigging Questions And Answers With Verified Updates How long to apply for a HRWL ANS 60 days What happens if you don't renew with 24 months of expiry ANS The HRWL cannot be renewed What do you need to perform high risk work without a high-risk work license ANS Enrolled in a relevant HRWL at an RTO Work under direct supervision of a person with a relevant HRWL When doing high risk work, what legal duties does a license holder have ANS Reasonable care for their own healt...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 6 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Crane & Rigging Test Questions And Answers Real Solutions

(0)
$12.49
0x  sold

Advanced Crane & Rigging Test Questions And Answers Real Solutions When should an approved lift plan be re-approved? ANS D. If there is any deviation from the original lift plan. Electrical hazards in the lift area and swing direction and degree are factors to consider in preparing which portion of a lift plan? ANS D. Crane Placement Capacities for crawler cranes that have outrigger extensions may not exceed ________. ANS D. 85 perfect of tipping

i x
  •  Package deal
  • Exam (elaborations)
  •  • 8 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Rigger Latest Questions And Answers Rated A+

(0)
$10.99
0x  sold

Advanced Rigger Latest Questions And Answers Rated A+ What is meant by the term "two blocking" ANS The load block contacts the boom point sheaves Lifting 20,000 pound with a 2-leg bridle sling at 30% horizontal sling angle, what is the force applied to each leg. ANS 20,000 pound In multiple crane lifts using an equalizer beam, the weight of the beam should be considered. ANS Part of the load weight What is required if there is a deviation from the lift plan. ANS A new lift pl...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 6 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Rigging Complete Study Questions And Answers

(0)
$11.99
0x  sold

Advanced Rigging Complete Study Questions And Answers Cribbing is used to ANS Support a load of the ground When a load is to be pulled up an inclined plane ANS 10% must be added to the load weight to determine the required pull capacity The WLL for a double-wrapped basket hitch is ANS Half that of a double basket hitch Which of the following is a correct statement regarding cribbing? ANS Softwoods such as pine are generally used for cribbing The point at which an object is perpe...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 8 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Rigger Questions And Answers With Real Quiz

(0)
$9.99
0x  sold

Advanced Rigger Questions And Answers With Real Quiz Leverage is defined as? ANS the power applied to a lever to cause a load to move A cranes stability is affected by all of the following except: ANS centered lift The quadrant that is located between the rear outriggers or crawlers in the rearward direction of travel is known as: ANS over-the-rear The operational quadrant between the left or right side outriggers is: ANS over the side A loads center of gravity in relation to th...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 4 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x

Advanced Rigging Final Examination Questions And Answers With Real Tests

(0)
$11.49
0x  sold

Advanced Rigging Final Examination Questions And Answers With Real Tests How often should a synthetic web sling be inspected? ANS Each day before use What will the tension be on one leg of a single vertical hitch lifting a load of 5 tons? ANS 5 tons Using the Rigging Hardware Tables in your book, what is the capacity of a 7/8 in. carbon shackle? ANS 13,000 lbs What is the most important piece of information to have before beginning to rig a load? ANS Weight of the load Which of ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 8 pages • 
  • by Nipsey • 
  • uploaded  2024
Quick View
i x