Vaster
On this page, you find all documents, package deals, and flashcards offered by seller Vaster.
- 782
- 0
- 21
Community
- Followers
- Following
1 Reviews received
803 items
Brain Story Certification Exam Questions with 100% Complete Solutions Graded A+
the brain begins as an embryonic structure called the - ANSWER-neural tube, shortly after conception it is formed in neurulation, all areas of the brain develop from here 
 
the brain is considered mature around what age - ANSWER-25, the brain is not mature until our mid-twenties because the prefrontal cortex (which enables executive function abilities) continues to develop until this time 
 
what is the sequence in which we learn our abilities - ANSWER-sensory, motor, emotional skills, executiv...
- Package deal
- Exam (elaborations)
- • 5 pages •
the brain begins as an embryonic structure called the - ANSWER-neural tube, shortly after conception it is formed in neurulation, all areas of the brain develop from here 
 
the brain is considered mature around what age - ANSWER-25, the brain is not mature until our mid-twenties because the prefrontal cortex (which enables executive function abilities) continues to develop until this time 
 
what is the sequence in which we learn our abilities - ANSWER-sensory, motor, emotional skills, executiv...
NCCCO EXAM BUNDLE QUESTIONS WITH 100% COMPLETE SOLUTIONS
NCCCO EXAM BUNDLE QUESTIONS WITH 100% COMPLETE SOLUTIONS
- Package deal
- • 25 items •
- NCCCO Q & A 2 Actual Exam Graded A+ • Exam (elaborations)
- NCCCO tower exam 7.2020 Questions with Actual Answers Graded A+ • Exam (elaborations)
- NCCCO test Questions With Real Answers Scored A+ 100% Accurate • Exam (elaborations)
- NCCCO PT Actual Exam Questions With 100% Complete Solutions Scored A+ • Exam (elaborations)
- Technical Knowledge NCCO Actual Exam Questions With 100% Complete Solutions • Exam (elaborations)
- And more ….
NCCCO EXAM BUNDLE QUESTIONS WITH 100% COMPLETE SOLUTIONS
Nccco Core + Specialty Test Prep Questions & Answers Scored A+ (2024/2025)
ASME B30.5 - ANSWER-Mobile and Locomotive cranes, all types 
 
ASME B30.3 - ANSWER-Tower Cranes 
 
ASME B30.23 - ANSWER-Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - ANSWER-Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - ANSWER-2 randomly broken wires in 6 diameters. 
 
4 randomly broken wires in 30 diameters. 
 
Safety factor 5.0 
 
Safety factor personel lifts 10-1 
 
ASME B30.9 - ANSWER-Slings 
 
Personel Platforms 
ASME B30.23 - ANSWER-Maximum Wi...
- Package deal
- Exam (elaborations)
- • 15 pages •
ASME B30.5 - ANSWER-Mobile and Locomotive cranes, all types 
 
ASME B30.3 - ANSWER-Tower Cranes 
 
ASME B30.23 - ANSWER-Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - ANSWER-Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - ANSWER-2 randomly broken wires in 6 diameters. 
 
4 randomly broken wires in 30 diameters. 
 
Safety factor 5.0 
 
Safety factor personel lifts 10-1 
 
ASME B30.9 - ANSWER-Slings 
 
Personel Platforms 
ASME B30.23 - ANSWER-Maximum Wi...
NCCCO MOBILE CRANE Exam Questions & Answers Scored A+
. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - CORRECT ANSWER-c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - CORRECT ANSWER-a. 
 
3. The load line of the crane you're operat...
- Package deal
- Exam (elaborations)
- • 19 pages •
. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - CORRECT ANSWER-c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - CORRECT ANSWER-a. 
 
3. The load line of the crane you're operat...
nccco Exam Questions With 100% Complete Solutions Graded A+
Boom up - ANSWER-What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - ANSWER-When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
 
Stay in the cab until the lines are de-energized - ANSWER-The load line of the crane you're operating contacts an energized power line. There...
- Package deal
- Exam (elaborations)
- • 5 pages •
Boom up - ANSWER-What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - ANSWER-When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
 
Stay in the cab until the lines are de-energized - ANSWER-The load line of the crane you're operating contacts an energized power line. There...
NCCCO CORE Exam Questions With 100% Accurate Answers Rated A+
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER-there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER-Keeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER-Separate the boom hoist lines 
 
How many randomly broken wires in a lay length must there be on a mo...
- Package deal
- Exam (elaborations)
- • 13 pages •
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER-there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER-Keeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER-Separate the boom hoist lines 
 
How many randomly broken wires in a lay length must there be on a mo...
NCCCO RIGGING 1 & 2 Exam Questions With Accurate Solutions Rated A+
OSHA 1910 - ANSWER-General Industry Standards 
 
OSHA 1926 - ANSWER-Construction Industry Standards 
 
OSHA 1910.180 - ANSWER-Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - ANSWER-Slings 
 
OSHA 1926.251 - ANSWER-Rigging Equipment used for material handling 
 
OSHA 1926.1400 - ANSWER-Cranes and Derricks used in construction 
 
ASME B30.3 - ANSWER-Tower Cranes 
 
ASME B30.5 - ANSWER-Mobile and Locomotive Cranes 
 
ASME B30.9 - ANSWER-Slings 
 
ASME B30.10 - ANSWER-Hooks 
 
ASME B30.20 - ...
- Package deal
- Exam (elaborations)
- • 6 pages •
OSHA 1910 - ANSWER-General Industry Standards 
 
OSHA 1926 - ANSWER-Construction Industry Standards 
 
OSHA 1910.180 - ANSWER-Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - ANSWER-Slings 
 
OSHA 1926.251 - ANSWER-Rigging Equipment used for material handling 
 
OSHA 1926.1400 - ANSWER-Cranes and Derricks used in construction 
 
ASME B30.3 - ANSWER-Tower Cranes 
 
ASME B30.5 - ANSWER-Mobile and Locomotive Cranes 
 
ASME B30.9 - ANSWER-Slings 
 
ASME B30.10 - ANSWER-Hooks 
 
ASME B30.20 - ...
NCCCO TEST Questions With Top-Quality Answers
1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWER-A) be smooth 
 
2) What is the task of high-tensile bolt connections between tower sections? - ANSWER-A) To avoid fail. 
 
3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWER-A) Every 200 hours of operation. 
 
4) According to the Tower Crane Reference Manual, which operation Does Not risk the 
stability of the crane? - ANSWER-A) Decrease the...
- Package deal
- Exam (elaborations)
- • 2 pages •
1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWER-A) be smooth 
 
2) What is the task of high-tensile bolt connections between tower sections? - ANSWER-A) To avoid fail. 
 
3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWER-A) Every 200 hours of operation. 
 
4) According to the Tower Crane Reference Manual, which operation Does Not risk the 
stability of the crane? - ANSWER-A) Decrease the...
NCCCO Core Exam Outline Questions & Answers 100% Correct 2024
Timber or steel - CORRECT ANSWER-These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - CORRECT ANSWER-On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - CORRECT ANSWER-Allows the weight of the crane and load to be distributed over a greater surface area. Should be used under outrigger floats at all times. 
 
3 - CORRECT ANSWER-Blocking should be at least how many times the su...
- Package deal
- Exam (elaborations)
- • 11 pages •
Timber or steel - CORRECT ANSWER-These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - CORRECT ANSWER-On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - CORRECT ANSWER-Allows the weight of the crane and load to be distributed over a greater surface area. Should be used under outrigger floats at all times. 
 
3 - CORRECT ANSWER-Blocking should be at least how many times the su...
NCCCO Lattice Boom General Knowledge Exam Questions & Answers
What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - ANSWER-Splicing 
 
What should be of major concern when considering surfaces for crane set up locations? - ANSWER-Voids, tanks, loose fill, depressions 
 
Which items are included in the suspended weight when calculating parts of line? - ANSWER-Load weight, rigging, load block 
 
What site condition must an operator be concerned about prior to setting up a crane? - ANSWER-Soil stability must be sufficient
- Package deal
- Exam (elaborations)
- • 14 pages •
What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - ANSWER-Splicing 
 
What should be of major concern when considering surfaces for crane set up locations? - ANSWER-Voids, tanks, loose fill, depressions 
 
Which items are included in the suspended weight when calculating parts of line? - ANSWER-Load weight, rigging, load block 
 
What site condition must an operator be concerned about prior to setting up a crane? - ANSWER-Soil stability must be sufficient
AHIT Test Questions With Solved Answers