100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ELEN7041 - Electric Power Investigation Project - Maintenance and Conditional Monitoring of Power Transformer’s R500,00
Add to cart

Thesis

ELEN7041 - Electric Power Investigation Project - Maintenance and Conditional Monitoring of Power Transformer’s

 0 purchase

A case study showed that DGA as diagnostic tool in determining the conditions of the oil and insulation by analysing the moisture content, water, dielectric strength and released gases. The use of DGA in conjunction with other electrical tests enhances the diagnosis of failure and can able to locat...

[Show more]

Preview 4 out of 115  pages

  • January 27, 2019
  • 115
  • 2017/2018
  • Thesis
  • Unknown
  • Unknown
book image

Book Title:

Author(s):

  • Edition:
  • ISBN:
  • Edition:
All documents for this subject (7)
avatar-seller
Mpincham
ELEN7041: ELECTRIC POWER INVESTIGATIONAL PROJECT


Report: Maintenance and Conditional Monitoring of Power
Transformer’s at Electricity Department




Candidate
Student Name

Student Number
XXXXXX

I hereby declare this is my own unaided work, submitted in partial fulfillment for the
degree in Master of Engineering in Electrical

,ELEN7041: Maintenance and Conditional Monitoring of Power Transformer’s at Electricity
Department

Abstract
Power transformers are electrically tested and maintained by various strategies facing
different goals. Factory tests are followed by start-up tests onsite before commissioning and
it is very crucial to keep the tests records as footprint for future reference. Both tests are to
confirm a span of life for the power transformer of 25-30 years. There is an increasing need
for power utilities to increase the utilisation of their assets while maintaining system
reliability. Asset or equipment reliability not only affects the availability of the power to
customers, but also affect the economic operation of the utility. In addition, substantial
benefits can be realised by maintaining and repairing equipment based on condition and
operating them beyond their expected life. Because of this economic incentive, condition
assessment of plant equipment and associated systems is essential. Key components of
condition assessment are condition monitoring or diagnostic techniques that are employed
as means of verifying the condition for replacement/ refurbishment or identifying failure or
malfunction modes.

Condition assessment and diagnostics of power transformers may be organised as basic
diagnostics, advance diagnostics, on-line monitoring and investigations during repair or post
mortem. The maintenance teams of power transformers mainly perform basic diagnostic
such as oil sampling (off-line DGA) and simple electric tests on a Conditional Based
Maintenance and Time Based Conditional Monitoring or Time Based Maintenance. If these
tests indicate deviations from original conditions or exceeded limits, advanced or specialised
methods are applied. These methods are suited to the detected or assumed failure and
mostly require disconnection of the transformer or an outage. DGA remains the key
assessment technique in determining the condition of power transformers, therefore, On-line
monitoring provides a continuous assessment of the actual transformer condition but cost
restrictions limit this method to important or new, large transformers and after post mortem of
repairs for further monitoring on an Online Conditional Monitoring.

A case study showed that DGA as diagnostic tool in determining the conditions of the oil and
insulation by analysing the moisture content, water, dielectric strength and released gases.
The use of DGA in conjunction with other electrical tests enhances the diagnosis of failure
and can able to locate the failure. The case study showed that there are many factors that
needs to be considered to diagnose the cause of a transformer fault and a careful
consideration needs to be taken in terms of understanding, experience and methods when
utilising the different diagnostic techniques. Performing maintenance task has risk and every
maintenance task requires certain measure of competence, skill and experience. Some
tasks require authorisation (e.g. advanced diagnostic measures), further education
(chemistry for dielectric tests such as DGA, furan analysis) or operator training on special
devices (oil treatment). Therefore, it is crucial to assign each maintenance to maintenance
team according to their skills level and therefore, there needs to be a training program in
place to provide, maintain and develop the skill base in a form of on-the-job training and/or
training programs based in a class room.

Keywords: Dissolved Gas Analysis (DGA), Time Based Maintenance (TBM), Time Based
Conditional Monitoring (TBCM), Online Conditional Monitoring (OLCM), Condition Based
Maintenance (CBM).



Page |1

XXXXXXXX

,ELEN7041: Maintenance and Conditional Monitoring of Power Transformer’s at Electricity
Department

Table of Conten

1 Introduction..................................................................................................................... 11

1.1 Background................................................................................................................... 12

1.2 Problem Statement.......................................................................................................12

1.3 Research Objectives....................................................................................................13

1.4 Structure of the Report................................................................................................13

2 Power Transformer Components and Failure Modes...................................................14

2.1 Core and Winding Coils...............................................................................................14

2.2 Insulation...................................................................................................................... 17

2.2.1 Insulation Paper........................................................................................................... 17

2.2.2 Insulation Oil................................................................................................................ 18

2.3 Oil Preservation Systems............................................................................................18

2.3.1 Conservator System....................................................................................................18

2.3.2 Pressure Regulated Gas Blanket.................................................................................19

2.4 Cooling Systems.......................................................................................................... 20

2.5 Auxiliary Equipment.....................................................................................................21

2.5.1 Bushings...................................................................................................................... 21

2.5.2 Tap Changers.............................................................................................................. 22

2.5.3 Gauges, Indicators and Relays....................................................................................23

3 Power Transformer Diagnostic Techniques..................................................................25

3.1 Inspection..................................................................................................................... 25

3.2 Infrared Temperature Analysis....................................................................................26

3.2.1 Infrared (IR) for Transformer Tank...............................................................................26

3.2.2 Infrared (IR) for Radiators and Cooling Systems.........................................................26



Page |2

XXXXXXXX

, ELEN7041: Maintenance and Conditional Monitoring of Power Transformer’s at Electricity
Department

3.2.3 Infrared (IR) for Bushings............................................................................................27

3.3 Dissolved Gas Analysis (DGA)....................................................................................28

3.4 Winding or Transformer Turns Ratio..........................................................................31

3.5 Winding Resistance......................................................................................................32

3.6 Magnetisation or Excitation Current...........................................................................33

3.7 Capacitance and Dielectric Dissipation Factor (DDF)/Tan Delta or Power Factor...33

3.8 Leakage Reactance/ Short Circuit Impedance...........................................................35

3.9 Frequency Response of Stray Losses (FRSL)...........................................................36

3.10 Core Insulation Resistance and Inadvertent Ground Test......................................37

3.11 Vibration Analysis......................................................................................................39

3.12 Frequency Response Analysis (FRA).......................................................................39

3.13 Polarization Depolarization Current (PDC) Method.................................................42

3.14 Frequency Domain Spectroscopy (FDS)..................................................................45

3.15 Recovery Voltage Method (RVM)...............................................................................45

3.16 Partial Discharge (PD) Measurement........................................................................46

3.16.1 Electrical PD measurements......................................................................................47

3.16.2 Acoustic Partial Discharge (PD) Measurement..........................................................49

3.16.3 Partial Discharge (PD) Measurement using UHF Technology...................................50

4 Electricity Department’s Maintenance Strategy............................................................50

4.1 Strategic Objectives.....................................................................................................50

4.2 Technical Objectives....................................................................................................52

4.3 Transformer Maintenance Strategy.............................................................................53

4.3.1 Condition Based Maintenance.....................................................................................56

4.3.2 Time Based Maintenance (TBM) and Time Based Condition Monitoring (TBCM).......56



Page |3

XXXXXXXX

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Mpincham. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R500,00. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 15 years now

Start selling
R500,00
  • (0)
Add to cart
Added