100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University R234,13
Add to cart

Exam (elaborations)

LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University

 1 purchase
  • Course
  • CM 4100 Construction Scheduling and Cost Control
  • Institution
  • CM 4100 Construction Scheduling And Cost Control

LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University

Preview 2 out of 10  pages

  • June 14, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Unknown
  • CM 4100 Construction Scheduling and Cost Control
  • CM 4100 Construction Scheduling and Cost Control
avatar-seller
Feedback
Your answer is correct.
The correct answer is:
a.Scheduling determines when to do, and planning determines what to do, how to do and by whom.LSU CM 4100 Construction Scheduling
and Cost Control Quiz 1 scored 100 out
of 100 2024-2025 Louisiana State
University
Question 1
Correct
1.00 points out of 1.00
Question textFlag question
A significant difference between "planning” and "scheduling” is,
Select one:
a.Scheduling determines what is going to be done, and planning determines how to do.
a.Scheduling determines how to do, and planning determines what to do.
a.Scheduling determines when to do, and planning determines what to do, how to do and by whom.
Correct
a.Scheduling determines how to do, and planning determines by whom. Feedback
Your answer is correct.
The correct answers are: Bar charts often directly show material consumption
of each activity., Bar charts can show the relationships of each activity.
Question 2
Correct
1.00 points out of 1.00
Question textFlag question
What is not true about bar charts?
Select one:
Bar charts use a time-scaled presentation.
Bar charts often directly show material consumption of each activity. Bar charts can show the relationships of each activity.
Bar charts cannot show the actual status of a project.
Question 3
Correct
1.00 points out of 1.00
Question textFlag question
What is not true about an activity?
Select one:
An activity usually takes time.
An activity may consume resources.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller smartzone. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R234,13. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

64302 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 15 years now

Start selling

Recently viewed by you


R234,13  1x  sold
  • (0)
Add to cart
Added