Florida Wastewater Operator class B
certification exam 2024/25
A common remedy for activated sludge system problems is to increase the waste
II II II II II II II II II II II II
activated sludge flow rate, when would an increase of WAS rate not be correct? - When
II II II II II II II II II II II II II II II II II II
straggler Floc is present in clarifier and settleometer
II II II II II II II II
The chlorine residual is falling An inspection of the 150lb cylinder and chlorine feed
II II II II II II II II II II II II II II II
equipment shows ice forming on the chlorine regulator and feed lines. The best method to
II II II II II II II II II II II II II II II
fix the falling chlorine residual is? - Put another chlorine cylinder online
II II II II II II II II II II II II II II
Caution must be used when adding caustic chemical to a digester.
II II II II II II II II II II II II
Lime can combine with carbon dioxide in the digester to form what problem? - A
II II II II II II II II II II II II II II II II
dangerous vacuum
II II
How many gallons will the single piston, reciprocating sludge pump discharge per minute
II II II II II II II II II II II II II II
If the piston bore (diameter) is 6 inches and the stroke length is 11 inches? The pump runs
II II II II II II II II II II II II II II II II II II
at 99 revolutions per minute. - 134gpm
II II II II II II II II II
solve MCRT:
II II II
Flow: 3.6mgd II
Basin volume: 5.0mg II II
MLSS:2350mg/l
WAS ss:4800mg/l II
WAS flow: 150000gpd II II
Eff tss: 15mg/l - 15 days
II II II II II II II
There are high suspended solids in the water applied to the filters due to bulking sludge in
II II II II II II II II II II II II II II II II II II
the secondary clarifiers.
II II II
Polymer is used as a filter aid chemical, but the effluent ability is worsening.
II II II II II II II II II II II II II
What is the best method to correct the filter problem? - Run jar tests to determine best
II II II II II II II II II II II II II II II II II II
Polymer dosage
II II
An advantage of a continuous backwash, up flow, deep bed sand filters is? - Filters do
II II II II II II II II II II II II II II II II II II II
not need to be taken out of service for backwashing
II II II II II II II II II II
The aeration tank dissolved oxygen has been running normal, 1.5 to 2.0 mg/L the whole
II II II II II II II II II II II II II II II II
month.
II
Today's D.O. reading has spiked to nearly 6.0 mg/L in the aeration tank and the clarifier
II II II II II II II II II II II II II II II
and plant effluent or cloudy.
II II II II II
What is the most likely cause of the rise in D.O.? - A toxic shock load of cyanide has
II II II II II II II II II II II II II II II II II II II II
entered the plant
II II II
II IIPlant fecal coliform counts do not meet state standards.
II II II II II II II II
, The chlorine supply is not the problem and there is adequate vacuum and chlorine feed
II II II II II II II II II II II II II II
the chlorine contacting has no solids build up and the effluent flow is below design.
II II II II II II II II II II II II II II II
What is the most likely cause of the poor fecal coliform kill? - High chlorine demand from
II II II II II II II II II II II II II II II II II II
excessive nitrite in effluent
II II II II
The point, location or structure where wastewater discharges from a sewer, drain or
II II II II II II II II II II II II II II
other conduit is called what? - Outfall
II II II II II II II II II
The volatile acid to alkalinity ratio of a properly operating anaerobic digester is - 0.1
II II II II II II II II II II II II II II II II II II
parts acid to one part alkalinity (0.1 : 1.0)
II II II II II II II II II
What is a disadvantage of running a digester in the thermophilic temperature range? -
II II II II II II II II II II II II II II II II II
The higher costs of heating the digester with natural gas
II II II II II II II II II II
What condition of a surface water, river or stream will allow more DO saturation? - Cold
II II II II II II II II II II II II II II II II II II II
water temperature
II II
Solids are washing out of the secondary clarifier of the activated sludge plant.
II II II II II II II II II II II II II II
Plant personnel increase the RAS flow rate, which slows the problem temporarily but then
II II II II II II II II II II II II II
it worsens after 30 minutes.
II II II II II
What is the cause of the plant problem? - Increase of RAS flow decreased the detention
II II II II II II II II II II II II II II II II II
time in the clarifier
II II II II
When operating upflow, continuous backwash sand filter that is discharging poor filtrate.
II II II II II II II II II II II II II
What should you check? - reject/washwater valves
II II II II II II II II II
When using lime to precipitate phosphorus from treated effluent, it is important to
II II II II II II II II II II II II II II
maintain the pH at or above - 11.0
II II II II II II II II II II
Upward force of groundwater on sedimentation tank?
II II II II II II II II
groundwater depth: 6ft above tank bottom II II II II II
Tank width: 80ft wide II II II
Tank length: 157ft long - 4,700,000lbs
II II II II II II II
Luxury uptake phosphorus removal method is failing to remove permitted levels:
II II II II II II II II II II II II
Influent phosphorus is 8 mg/L. II II II II
Fermentation basin phosphorus level is 10 mg/L. II II II II II II
Aeration basin phosphorus is 8 mg/L. II II II II II
Effluent exceeds 1.0mg/l - Poor release of phosphorus in fermentation basin
II II II II II II II II II II II II
Calculate the SVI for the activated sludge treatment plant:
II II II II II II II II II II
30min sett:675 II
60min sett:420 II
MLSSmg/l:3650
MLVSSmg/l:74% - 185ml/g II II II II
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller STUVATE. Stuvia facilitates payment to the seller.