Project Management PRO4801 (PRO4801)
University of South Africa (Unisa)
All 10 results
Sort by
-
PRO4801 ASSIGNMENT 6 2024 COMPLETE ANSWERS WITH DIAGRAMS Disappointment over the failure of their previous project has taken root in the minds of senior managers at the PACKS Technology Project company. They didn't want such an embarrassment to happen
- Essay • 20 pages • 2024
-
- R100,00
- 1x sold
- + learn more
PRO4801 ASSIGNMENT 6 2024 COMPLETE ANSWERS WITH DIAGRAMS 
 
Disappointment over the failure of their previous project has taken root in the minds of senior managers at the PACKS Technology Project company. They didn't want such an embarrassment to happen again. As an experienced senior manager in a project consulting company, you are tasked with managing the project. 
You need to draw an AON network diagram and consider the project requirements. You have the information in Table 1 
 
 
The Lets...
-
PRO4801 Assignment 6 2024 | Due September 2024
- Exam (elaborations) • 21 pages • 2024
-
- R70,00
- 11x sold
- + learn more
PRO4801 Assignment 6 2024 | Due August 2024
-
PRO4801 ASSIGNMENT 5 2024 The kind of knowledge involved in project management is a. tacit b. explicit c. both The functions of the PMO a. must be ful lled by a single department or unit, usually called a PMO b. could be ful lled in other ways—
- Essay • 16 pages • 2024
-
- R60,00
- 1x sold
- + learn more
PRO4801 ASSIGNMENT 5 2024 
 
 The kind of knowledge involved in project management is 
a. tacit 
 b. explicit 
 c. both 
 
The functions of the PMO 
a. must be ful lled by a single department or unit, usually called a PMO 
 b. could be ful lled in other ways— and not necessarily by a single unit such as the PMO 
 c. although desirable in a multiproject organization, are not really necessary
-
PRO4801 Assessment 5 The kind of knowledge involved in project management is a. tacit b. explicit c. both
- Exam (elaborations) • 17 pages • 2024
-
- R96,00
- + learn more
PRO4801 Assessment 5 
The kind of knowledge involved in project 
management is 
a. tacit 
b. explicit 
c. both
-
PRO4801 ASSIGNMENT 4 2024 Defend the following statement:” When uncertainty drops to nearly zero, and when effort is repeated a large number of times, the work is no longer considered a project.” [Use - A topology of projects Figure 1.3 (page 5) in the p
- Essay • 28 pages • 2024
-
- R100,00
- + learn more
PRO4801 ASSIGNMENT 4 2024 
 
Defend the following statement:” When uncertainty drops to nearly zero, and when effort is repeated a large number of times, the work is no longer considered a project.” [Use - A topology of projects Figure 1.3 (page 5) in the prescribed book. Do Not Draw the Figure!]. [20] 
 
Jamal industries, a manufacturing company that produces products of the True Value brand, is to introduce a new product at a lower cost than the competitor. The strategy is to increase volu...
Make study stress less painful
-
PRO4801 ASSIGNMENT 4 2024 Defend the following statement:” When uncertainty drops to nearly zero, and when effort is repeated a large number of times, the work is no longer considered a project.” [Use - A topology of projects Figure 1.3 (page 5) in the pr
- Essay • 24 pages • 2024
-
- R76,00
- 4x sold
- + learn more
PRO4801 ASSIGNMENT 4 2024 
Defend the following statement:” When uncertainty drops to nearly zero, and when effort is repeated a large number of times, the work is no longer considered a project.” [Use - A topology of projects Figure 1.3 (page 5) in the prescribed book. Do Not Draw the Figure!]. [20] 
The earned value concept
-
PRO4801 ASSIGNMENT 4 2024
- Essay • 26 pages • 2024
-
- R100,00
- 7x sold
- + learn more
PRO4801 ASSIGNMENT 4 2024 
Apply the systems development cycle to the development of a product of your choice (clearly indicating activates involved), ensuring the product is produced at lower cost that enables a selling price 20 percent less than competitors 
Comment on the statement: the “WBS is central to planning,” 
The earned value concept 
Implications of scope creep 
You are required to oversee the production of a new product, which is expected to boost the competitiveness of the or...
-
PRO4801 ASSIGNMENT 3 2024 In a project that is very large, complex, involves considerable risk, and is longduration, which form of project is probably the best: a pure project or a project center Properties inherent to all project organizations includ
- Exam (elaborations) • 22 pages • 2024
-
- R80,00
- 1x sold
- + learn more
PRO4801 ASSIGNMENT 3 2024 
 
In a project that is very large, complex, involves considerable risk, and is longduration, which form of project is probably the best: a pure project or a project center 
 
 
Properties inherent to all project organizations include (select all that apply 
 
Which of the following are potential ways to reduce cost escalation (select all that apply)
-
PRO4801 ASSIGNMENT 1 2024
- Exam (elaborations) • 7 pages • 2024
-
- R80,00
- + learn more
PRO4801 ASSIGNMENT 1 2024
-
PRO4801 ASSIGNMENT 2 2024
- Exam (elaborations) • 13 pages • 2024
-
- R80,00
- 1x sold
- + learn more
PRO4801 ASSIGNMENT 2 2024
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study notes too and start uploading now. Discover all about earning on Stuvia