BICSI RTPM(solved)latest 2023design and implementation/installation
Telecommunications project management (TPM) typically consists of two distinct processes:
Design PM Tasks
Review expression of interest for client
Perform a user needs analysis
Perform site surveys and meet with client
...
design and implementationinstallation telecommunications project management tpm typically consists of two distinct processes
design pm tasks review expression of inte
Escuela, estudio y materia
Rtpm
Rtpm
1
revisar
Por: pedro_lerma • 1 año hace
Por: BravelRadon • 1 año hace
5stsr! Thank you
Por: BravelRadon • 1 año hace
5star!thank you
Vendedor
Seguir
BravelRadon
Comentarios recibidos
Vista previa del contenido
BICSI RTPM(solved)latest 2023
design and implementation/installation - correct answer Telecommunications project
management (TPM) typically consists of two distinct processes:
Design PM Tasks - correct answer Review expression of interest for client
Perform a user needs analysis
Perform site surveys and meet with client
Generate preliminary design submittals
Respond to/incorporate client comments
Prepare final bid documents/RFP and engineer's cost estimate
Issue final RFP package to client
Client makes RFP available to potential bidders
Implementation of TPM Project Flowchart - correct answer Review client RFP
Perform Site Survey
Organize and Submit Bid Questions
Organize and Submit Final Proposal
Client Awards Contract NTP
Contractor Mobilizes
Project Implementation
Project - correct answer Temporary endevour that has a definite beginning and end,
whose end result is the delivery of a product or service. Projects are governed by limits
(constraints).
Project Stakeholders - correct answer Sponsor
Portfolio Manager
Client
Sellers
Business Partner
Operations Manager
Functional Manager
Project Manager
Program Manager
Project Team Members - correct answer Manufacturer
Engineer
Government / Regulatory
Supplier
Vendor
Admin/ Clerical
,Supervisor
Other Trades
Consultant
Coworker
Customer
ICT Professional's Role is Affected By: - correct answer Current & future technology
Availability of resources
Complex equipment
Advanced tools
Constant refinement of standards
International, National, Regional and Local Codes
Intricate and evolvoing designs
Phases of a Project - correct answer Design
Bidding
Construction
Post-Construction
PM Tools - correct answer Program Evaluation Review Technique (PERT)
Gantt - Schedule of activity, bar chart
Critical Path Management
Earned Value Management
TPM Steps - correct answer Developing a Plan
Implementing the Plan
Managing/ Tracking the Plan
Closeout the Project
TPM Knowledge Areas - correct answer Integration
Scope
Time
Cost
Quality
Human Resources
Communications
Risks
Procurement
Stakeholders
Human Resource Management - correct answer Personnel issues, engaging the right
people to do the job, (trained, equipped, motivated)
Project Safety
Scope Management - correct answer Development of a scope statement, approved by
client and compay
, Scope statement defines type/ amount/ limits of the work to be performed
Scope is the fence around the project
Integration Management - correct answer Breaks up multiple small projects to one big
project
One big project broken down to multiple small projects
Integration of subteams into project organization with integrated plan
Time Management - correct answer Time estimate and schedules
Integration of time schedules from various subteams and calculation of the critical path
of events on the project
Cost Management - correct answer Cost estimate and project budget
Quality Management - correct answer Detailed review of the design documentation
throughout the project
If ICT completes build, include test results and workmanship
Client value Items
Communications Management - correct answer Scheduled meetings and the use of
electronic media
War room - to post schedule and project results on a whiteboard
When should the risk management plan be completed? - correct answer Before a
company submits a proposal
Stakeholder Management - correct answer Identify all internal/ external stakeholders
Whose job is it to integrate and mitigate the influence and interests of each stakeholder
- correct answer Project Manager
Procurement Management - correct answer Procurement of resources outside of the
team, (materials & subcontractors)
Client Needs Assessment - correct answer Starts with a meeting with the client to
evaluate their needs
ICT Professional must understand: - correct answer Industry, Business, Technology and
Strategic plans
Los beneficios de comprar resúmenes en Stuvia estan en línea:
Garantiza la calidad de los comentarios
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Compra fácil y rápido
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Enfócate en lo más importante
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable.
Así llegas a la conclusión rapidamente!
Preguntas frecuentes
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
100% de satisfacción garantizada: ¿Cómo funciona?
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BravelRadon. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy this summary for 22,46 €. You're not tied to anything after your purchase.