ICC Test (A+ Graded Already)
Phase 1 equipment is related to all of the following except: correct answers Dispenser mounted vapor recovery equipment According to EO VR-201/202-N, the only authorized hose configuration is: correct answers Any Hose Configuration The most current ARB approved Phase II vapory recovery is: correct answers EVR When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all of the following to eliminate the potentials problem except: correct answers review service with gas station operator The following component is not part of the Healy Phase II vapory recovery system: correct answers Healy Model 900 Vapor Motor The max dispensing flow rate of a Healy 900 Series EVR nozzel is: correct answers 10 GPM According to VR-201/202-N, a _____ should be installed on the Healy system if the flow rate is above 10 GPM correct answers Flow limiter The Quarterly Inspection and Testing of a Healy Phase II EVR system should include the following except: correct answers conduct a pressure decay test by a Healy Certified Technician The first sign of oxygen depletion is: correct answers accelerated breathing and heartbeat According to PEI 500, each of the following are proper methods of removing a portion of a GDF from service except: correct answers noting event in the defective equipment log What procedure checks the integrity of the vapor check valve in the nozzle? correct answers Nozzle bag test Which of the following conditions is a Healy certified technician not required to repair? correct answers Reconnection of a breakaway after a drive off What procedure is required after a nozzle spout change? correct answers Nozzle automatic shutoff test A vapor recovery system generally uses what unit of measurment? correct answers Inches of water column During the annual inspection and testing of the vapor recovery system; the first three steps are to: a) Conduct static pressure performance of the Healy Clean Air Separator b) Conduct pressure decay test c) Conduct dispenser vapor line tightness test
Escuela, estudio y materia
- Institución
- ICC
- Grado
- ICC
Información del documento
- Subido en
- 5 de enero de 2024
- Número de páginas
- 5
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
phase 1 equipment is related to all of the followi
Documento también disponible en un lote