100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
Exam (elaborations) MAC3701 Assignment 2 (COMPLETE ANSWERS) Semester 1 2024 (622981) - DUE 18 April 2024 • Course • Application of Management Accounting Techniques (MAC3701) • Institution • University Of South Africa (Unisa) • Book • Cost and Management A 2,40 €   Añadir al carrito

Examen

Exam (elaborations) MAC3701 Assignment 2 (COMPLETE ANSWERS) Semester 1 2024 (622981) - DUE 18 April 2024 • Course • Application of Management Accounting Techniques (MAC3701) • Institution • University Of South Africa (Unisa) • Book • Cost and Management A

 26 vistas  1 veces vendidas
  • Grado
  • Institución
  • Book

Exam (elaborations) MAC3701 Assignment 2 (COMPLETE ANSWERS) Semester 1 2024 (622981) - DUE 18 April 2024 • Course • Application of Management Accounting Techniques (MAC3701) • Institution • University Of South Africa (Unisa) • Book • Cost and Management Accounting MAC3701 Assign...

[Mostrar más]

Vista previa 3 fuera de 17  páginas

  • 17 de abril de 2024
  • 17
  • 2023/2024
  • Examen
  • Preguntas y respuestas
avatar-seller
Exam (elaborations)
MAC3701
Assignment 2
(COMPLETE
ANSWERS)
Semester 1 2024
(622981) - DUE 18
April 2024
Course



Application of Management


Accounting Techniques
(MAC3701)
Institution



University Of South Africa (Unisa)
Book 
[School]
Cost and Management Accounting [Course title]

,Exam (elaborations)
MAC3701 Assignment 2 (COMPLETE ANSWERS)
Semester 1 2024 (622981) - DUE 18 April 2024
 Course
 Application of Management Accounting Techniques (MAC3701)
 Institution
 University Of South Africa (Unisa)
 Book
 Cost and Management Accounting


MAC3701 Assignment 2 (COMPLETE ANSWERS) Semester 1 2024
(622981) - DUE 18 April 2024 ;100% TRUSTED workings, explanations
and solutions. for assistance Whats-App.......0.6.7..1.7.1..1.7.3.9.........




QUESTION 1 (100 Marks; 180 Minutes) Shesha Nami (Pty) Ltd (SN) is a
well-established electronic bicycle manufacturing company operating from
its plant and distribution centre in Middelburg (Mpumalanga), South Africa.
The company has a male-dominated management team and is well known
for its quality products and commitment to sustainability. SN makes two
types of electrical bikes, namely the Electric mountain bike (E-MTB) and
the Electric city bike (E-CB). The E-MTB has a bigger frame and tyres than
the E-CB to provide stability and control for more rugged terrains. Both
bikes make use of an electric motor, powered by a battery, to assist with
propulsion. SN makes use of an absorption costing system and all its
inventory items are valued using the first-in-first-out (FIFO) method. SN has
a 31 December financial year end. 1. SN’s STANDARD AND BUDGETED
INFORMATION FOR THE 2023 FINANCIAL YEAR

1.1. Inventory and manufacturing The company had no budgeted opening
and closing inventory of any type. SN budgeted to manufacture the
electronic bikes in direct proportion to its standard sales mix. The budgeted
manufacturing levels for the 2023 financial year were equal to the
company’s normal manufacturing capacity.

1.2. Sales SN budgeted to sell 24 000 E-MTB and 16 000 E-CB units. One
bike is equal to one unit. The budget selling price per unit for E-MTB and E-
CB was R28 000 and R26 000 respectively.

, 1.3. Variable and Fixed costs The E-bike manufacturing starts with the
frame and suspension made from Aluminium. The frame and suspension
are produced according to the bike’s design and specification using various
cutting and bonding machinery. Once the frame and suspension are ready,
various components (wheels, brakes, drivetrain & other components) are
attached to the frame. The key components that differentiate E-bikes from
traditional bicycles are the electric motor and lithium-ion battery which are
integrated into the bike’s frame. SN employs factory workers for the
manufacturing and assembly process. The standard is to allow 8% idle time
for these direct labourers. Page 3 of 8 MAC3701 Assessment 02/S1/2024
[TURN OVER]



QUESTION 1 (continued)

1.3.1. Variable costs The standard variable cost requirements for one E-
MTB and one E-CB unit are: Requirements per unit INPUTS E-MTB E-CB
Budgeted price Aluminium 1,8 kilogram 1,5 kilogram R 42 000 per ton
Electric motor 1 electric motor 1 electric motor R 3 800 per motor Lithium-
ion Battery 1 battery 1 battery R 6 000 per battery Various components 1,1
component sets 1 component set R 12 500 per set Direct labour 90 clock
minutes per bike 90 clock minutes per bike R 105 per clock hour Variable
manufacturing overheads (VMO) 45 machine minutes 45 machine minutes
R13 per machine hour Selling and distribution Refer to 1.4 Refer to 1.4 R50
per bike

1.3.2. Fixed costs Fixed manufacturing overhead costs (FMO) are
allocated based on budgeted labour hours and the total budgeted fixed
manufacturing overheads were R.

1.4. Selling and distribution costs Selling and distribution costs were
budgeted to be a total of R3 000 000 for the year.

1.5. Administrative costs Increased environmental regulations have
highlighted some concerns around SN’s CO2 emissions due to greenhouse
gases that are released during the welding process. Additionally, SN’s lack
of a recycling strategy as an area of concern, due to its use of non-
recyclable materials during manufacturing, was underlined. As a result,
management budgeted fixed administrative costs of R for the year to
accommodate for increased compliance costs. Page 4 of 8 MAC3701
Assessment 02/S1/2024 [TURN OVER] QUESTION 1 (continued)

2. ACTUAL RESULTS FOR THE 2023 FINANCIAL YEAR 2.1.
Manufacturing and Sales Rising demand for electrical bikes resulted in

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lakeli2018. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for 2,40 €. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender
2,40 €  1x  vendido
  • (0)
  Añadir