PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro 2,64 €   Añadir al carrito

Examen

PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed pro

1 revisar
 15 vistas  2 purchases
  • Grado
  • Institución

PRM3701 ASSESSEMENT 5 SEMESTER 2 2024 Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down. This type of project closure is called a. normal b. premature c. perpetual d. failed project e. changed priority In the ...

[Mostrar más]

Vista previa 4 fuera de 75  páginas

  • 10 de septiembre de 2024
  • 75
  • 2024/2025
  • Examen
  • Desconocido

1  revisar

review-writer-avatar

Por: malulekenthabisengnm81 • 4 días hace

reply-writer-avatar

Por: BMZAcademy • 3 días hace

Thank malulekenthabisengnm81 for the review, tell us if you need anything more about the assignment or the module or any other modules please get in touch through the provided details

avatar-seller
BMZ ACADEMY




BMZ ACADEMY




@061 262 1185/068 053 8213



BMZ ACADEMY 061 262 1185/068 053 8213

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22




PRM3701-24-S2  Welcome Message  Assessment 5

QUIZ




Question 1

Not yet answered

Marked out of 1.00




Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down.
This type of project closure is called


a. normal

b. premature

c. perpetual

d. failed project

e. changed priority

Clear my choice




Question 2

Not yet answered

Marked out of 1.00




Which part of the audit report examines in detail the underlying causes of problems, issues, and successes relative to the
project and includes concise, factual review statements of the project?


a. Classi�cation

b. Analysis

c. Recommendations

d. Lessons learned

e. Appendix

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
1 of 6 9/10/2024, 7:16

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22


Question 3

Not yet answered

Marked out of 1.00




. In the Snapshot from Practice in your textbook, the results of analyzing the Katrina hurricane resulted in a new evaluation plan
from:


a. The state legislature

b. The governor of Louisiana




c. The city of New Orleans

d. The Red Cross

Clear my choice




Question 4

Not yet answered

Marked out of 1.00




This type of closure occurs when the project may never seem to end. At some point the review group should recommend
methods for bringing �nal closure to this type of project. This is considered ___________ closure.


a. normal

b. premature

c. perpetual

d. changed priority

e. failed project

Clear my choice




Question 5

Not yet answered

Marked out of 1.00




It can be a signi�cant challenge to keep the project team ___________ as the project nears completion.


a. focused

b. working

c. energetic

d. together

e. performing

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
2 of 6 9/10/2024, 7:16

,Assessment 5 https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22


Question 6

Not yet answered

Marked out of 1.00




Research consistently points out that project success is strongly affected by the degree to which a project has the support of
top management. The following are ways a project manager can manage upward relationships EXCEPT


a. never ignore the chains of command.

b. prove loyalty
c. pick the optimum time to appeal to top management.

d. consistently follow through on requests.

e. accept profound differences in perspective and become skilled at the art of persuading superiors.

Clear my choice




Question 7

Not yet answered

Marked out of 1.00




The second ring in the network of relationships for project managers includes all of the following except:




a. Other project managers

b. Customers

c. Functional managers

d. Sponsors

Clear my choice




Question 8

Not yet answered

Marked out of 1.00




The difference between project management and project leadership is that project management includes:


a. Recognizing the need to alter direction

b. Aligning people to meet new directions

c. Monitoring results against plans




d. Motivating people to meet new objectives

Clear my choice




CONTACT BMZ @>0612621185 068053 8213
3 of 6 9/10/2024, 7:16

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BMZAcademy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for 2,64 €. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender
2,64 €  2x  vendido
  • (1)
  Añadir