RSK4801 Assignment 04 (COMPLETE ANSWERS) 2024 ;100 % TRUSTED workings, Expert Solved, Explanations and Solutions. For assistance call or W.h.a.t.s.a.p.p us on ...(.+.2.5.4.7.7.9.5.4.0.1.3.2)...........
CASE STUDY: RISK MANAGEMENT – THE ROLE OF A RISK MANAGER
Since 2020, many incidents and even...
RSK4801 Assignment 4 (COMPLETE ANSWERS) 2024 - DUE 4 October 2024 ; 100% TRUSTED Complete, trusted solutions and explanations
RSK4801 Assignment 4 (COMPLETE ANSWERS) 2024 - DUE 4 October 2024 ; 100% TRUSTED Complete, trusted solutions and explanations
Todos para este libro de texto (29)
Escuela, estudio y materia
University of South Africa
Operational Risk Management (RSK4801)
Todos documentos para esta materia (22)
Vendedor
Seguir
LIBRARYpro
Comentarios recibidos
Vista previa del contenido
RSK4801
ASSIGNMENT 4 2024
UNIQUE NO.
DUE DATE: 2024
, RSK4801
Assignment 4 2024
Unique Number:
Due Date: 2024
Operational Risk Management
Question 1
3.1 External Risks, Consequences, and Mitigation Measures (Table 1)
# Risk/Cause Consequence Control measure
Disruption in business Investment in alternative
Energy Crisis operations, resulting in energy sources (solar,
1
(Loadshedding) revenue loss, decreased generators), strategic energy
investor confidence. management, backup systems.
Implement strict internal
Increased operational costs, controls, conduct regular
Fraud and
3 damage to reputation, and audits, encourage
Corruption
loss of investor trust. whistleblowing, and enforce
anti-fraud policies.
Business disruptions due to
Advocate for public-private
poor infrastructure
partnerships to improve
4 Infrastructure Failure maintenance, such as water
infrastructure, invest in internal
shortages or transportation
infrastructure maintenance.
issues.
, # Risk/Cause Consequence Control measure
Damage to physical assets, Develop disaster recovery
Climate Change disruptions in supply chains, plans, invest in climate-resilient
5
(Floods, Droughts) increased insurance infrastructure, and obtain
premiums. comprehensive insurance.
Engage with government for
Slow Pace of Missed business opportunities, improved investment climate,
6 Sustainability and reduced competitiveness, and adopt sustainable practices to
Investment Projects inability to scale operations. attract ESG-conscious
investors.
3.2 Risk and Control Self-Assessment (RCSA) (Table 3)
Impact Likelihood Priority
Control Residual
Inherent Risk (5-point (5-point Probability to
Rating Risk (1–6)
scale) scale) Manage
Energy Crisis 5 4 81%-100% 2 High 1
Cyber Risks and
4 3 41%-60% 1 Medium 2
Cybercrimes
Fraud and
4 3 41%-60% 2 Medium 3
Corruption
Infrastructure
3 4 61%-80% 3 High 4
Failure
Climate Change
(Floods, 5 3 41%-60% 2 Medium 5
Droughts)
Slow Pace of
3 2 21%-40% 1 Low 6
Sustainability
Los beneficios de comprar resúmenes en Stuvia estan en línea:
Garantiza la calidad de los comentarios
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Compra fácil y rápido
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Enfócate en lo más importante
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable.
Así llegas a la conclusión rapidamente!
Preguntas frecuentes
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
100% de satisfacción garantizada: ¿Cómo funciona?
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller LIBRARYpro. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy this summary for 2,68 €. You're not tied to anything after your purchase.