[Mostrar más]An EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the 
excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency,...
Vista previa 2 fuera de 6 páginas
Añadir al carritoAn EXCITER on a traditional generator does what? - Voltage regulation (AVR) if you change the 
excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Frequency,...
Real time transmission constraints or contingencies may be alleviated with generators operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system...
Vista previa 2 fuera de 10 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system...
Control center facilities must have a minimum of how many days of fuel for the backup generator? - 
5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast...
Vista previa 2 fuera de 7 páginas
Añadir al carritoControl center facilities must have a minimum of how many days of fuel for the backup generator? - 
5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast...
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at 
full output _________ - immediately upon receipt of dispatch instruction
Vista previa 2 fuera de 6 páginas
Añadir al carritoThe purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at 
full output _________ - immediately upon receipt of dispatch instruction
Which of the following statements is correct concerning PJM assuming frequency control of the 
restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too m...
Vista previa 4 fuera de 61 páginas
Añadir al carritoWhich of the following statements is correct concerning PJM assuming frequency control of the 
restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too m...
Which of the following balancing control modes is used by PJM under normal operations? - Tie-Line 
Bias 
Which of the following influences does PJM consider when performing their system load forecast? - 
Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to ...
Vista previa 4 fuera de 33 páginas
Añadir al carritoWhich of the following balancing control modes is used by PJM under normal operations? - Tie-Line 
Bias 
Which of the following influences does PJM consider when performing their system load forecast? - 
Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to ...
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of 
merit). - off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and...
Vista previa 2 fuera de 6 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of 
merit). - off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and...
Real time transmission constraints or contingencies may be alleviated with generators operating 
______________ - off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedu...
Vista previa 2 fuera de 15 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators operating 
______________ - off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedu...
When is Manual Load Dump Warning issued? - available primary reserve capacity is less than the 
largest operating generator or the loss of a transmission facility jeopardizes reliable operations after all 
other possible measures are taken to increase reserve 
Why is a Voltage Reduction used? - PJM ...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhen is Manual Load Dump Warning issued? - available primary reserve capacity is less than the 
largest operating generator or the loss of a transmission facility jeopardizes reliable operations after all 
other possible measures are taken to increase reserve 
Why is a Voltage Reduction used? - PJM ...
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (G...
Vista previa 3 fuera de 30 páginas
Añadir al carritoDuring System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (G...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller ClassHero. Stuvia facilitates payment to the seller.
No, you only buy this summary for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now