Lote
NCCCO Bundled Exams with Complete Solution | Verified | Guaranteed Success Updated & Verified | 2024
NCCCO Bundled Exams with Complete Solution | Verified | Guaranteed Success Updated & Verified | 2024
[Mostrar más]NCCCO Bundled Exams with Complete Solution | Verified | Guaranteed Success Updated & Verified | 2024
[Mostrar más]Boom up What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
1% When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in ...
Vista previa 2 fuera de 6 páginas
Añadir al carritoBoom up What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
1% When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in ...
When making a multiple crane lift, it is important for the operator to understand that: The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: Increase 
Most crane manufactur...
Vista previa 2 fuera de 6 páginas
Añadir al carritoWhen making a multiple crane lift, it is important for the operator to understand that: The weight 
may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load 
radius will: Increase 
Most crane manufactur...
OSHA 1910 General Industry Standards 
OSHA 1926 Construction Industry Standards 
OSHA 1910.180 Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 Slings 
OSHA 1926.251 Rigging Equipment used for material handling
Vista previa 2 fuera de 6 páginas
Añadir al carritoOSHA 1910 General Industry Standards 
OSHA 1926 Construction Industry Standards 
OSHA 1910.180 Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 Slings 
OSHA 1926.251 Rigging Equipment used for material handling
1. A wire rope that is a 6x19 classification could have how many wires per strand? 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? Winds in 
excess...
Vista previa 2 fuera de 7 páginas
Añadir al carrito1. A wire rope that is a 6x19 classification could have how many wires per strand? 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? Winds in 
excess...
Overhead cranes with more than one hoisting unit shall have? Its rated load marked on it. 
How often does O.S.H.A. require a written wire rope inspection? Once a month 
What is the purpose of the "E" (Emergency) stop on an overhead crane? Removes power to entire 
crane. 
Most loads should be rigge...
Vista previa 2 fuera de 12 páginas
Añadir al carritoOverhead cranes with more than one hoisting unit shall have? Its rated load marked on it. 
How often does O.S.H.A. require a written wire rope inspection? Once a month 
What is the purpose of the "E" (Emergency) stop on an overhead crane? Removes power to entire 
crane. 
Most loads should be rigge...
The crane is out of level, you release the swing break, the boom swings downhill, your: Load radius 
increases 
Blocking can be placed under the ends of tracks to: Increase the cranes stability when Operating 
over front or back 
What quadrant produces the least amount of ground pressure on a lattic...
Vista previa 2 fuera de 7 páginas
Añadir al carritoThe crane is out of level, you release the swing break, the boom swings downhill, your: Load radius 
increases 
Blocking can be placed under the ends of tracks to: Increase the cranes stability when Operating 
over front or back 
What quadrant produces the least amount of ground pressure on a lattic...
When tower crane is erected/dismantled, written instructions must be On site 
Tower crane erection/dismantling shall be performed under direct supervision of the Designated 
person 
What is the minimum clearance from obstruction when the tower crane freely rotates 360•? 6 ft 6 
in 
What must the c...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhen tower crane is erected/dismantled, written instructions must be On site 
Tower crane erection/dismantling shall be performed under direct supervision of the Designated 
person 
What is the minimum clearance from obstruction when the tower crane freely rotates 360•? 6 ft 6 
in 
What must the c...
continuously during all crane movements, asme b30.5 states that communication shall be 
maintained 
stop crane movements if the communication is disrupted at any time while the crane is operation, 
the operator shall 
osha 1926.1400 appendix a OSHA's standard method crane hand signals would be loca...
Vista previa 2 fuera de 8 páginas
Añadir al carritocontinuously during all crane movements, asme b30.5 states that communication shall be 
maintained 
stop crane movements if the communication is disrupted at any time while the crane is operation, 
the operator shall 
osha 1926.1400 appendix a OSHA's standard method crane hand signals would be loca...
Boom damage When taking a side strain on a boom what concerns operator the most? 
Capacity based on structural competence On a load chart the values above the bold line mean 
Allowable line pulll decreases The number of layers of rope on the drum increases the 
7:1 When lifting personnel in a man ba...
Vista previa 2 fuera de 6 páginas
Añadir al carritoBoom damage When taking a side strain on a boom what concerns operator the most? 
Capacity based on structural competence On a load chart the values above the bold line mean 
Allowable line pulll decreases The number of layers of rope on the drum increases the 
7:1 When lifting personnel in a man ba...
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or 
mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. ...
Vista previa 2 fuera de 8 páginas
Añadir al carritoCrane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or 
mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. ...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom c. 
2. When hoisting personnel, within what percentage of level must a telescopic...
Vista previa 3 fuera de 17 páginas
Añadir al carrito1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom c. 
2. When hoisting personnel, within what percentage of level must a telescopic...
ASME B30.5 Mobile and Locomotive cranes, all types 
ASME B30.3 Tower Cranes 
ASME B30.23 Personel Lifting Regs 
OSHA 29 CFR 1926.1400 Series Cranes & Derrick's used in Construction regs. 
Rotation Resistant Wire Rope 2 randomly broken wires in 6 diameters. 
4 randomly broken wires in 30 diameters. ...
Vista previa 3 fuera de 16 páginas
Añadir al carritoASME B30.5 Mobile and Locomotive cranes, all types 
ASME B30.3 Tower Cranes 
ASME B30.23 Personel Lifting Regs 
OSHA 29 CFR 1926.1400 Series Cranes & Derrick's used in Construction regs. 
Rotation Resistant Wire Rope 2 randomly broken wires in 6 diameters. 
4 randomly broken wires in 30 diameters. ...
When hook-suspended personnel platforms are lifted with a telescopic boom crane, An anti two- 
block devise must be provided 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions 
are disabled when the device is activated? Hoist, extend the boom, boom ...
Vista previa 1 fuera de 3 páginas
Añadir al carritoWhen hook-suspended personnel platforms are lifted with a telescopic boom crane, An anti two- 
block devise must be provided 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions 
are disabled when the device is activated? Hoist, extend the boom, boom ...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller VasilyKichigin. Stuvia facilitates payment to the seller.
No, you only buy this summary for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now