[Mostrar más]True or false? The interconnection coordination project manager coordinates the 
activities of PJM internal coordination and the generation owner to complete the 
generator markets and operations activities 
: True 
True or false? In the event that a local geography name has already been used in ...
Vista previa 2 fuera de 14 páginas
Añadir al carritoTrue or false? The interconnection coordination project manager coordinates the 
activities of PJM internal coordination and the generation owner to complete the 
generator markets and operations activities 
: True 
True or false? In the event that a local geography name has already been used in ...
An EXCITER on a traditional generator does what? 
: Voltage regulation (AVR) if you change the excitation current, you change the 
voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. 
: Limits 
When synchronizing to the interconnection, what needs to be synchronized? 
: Freque...
Vista previa 2 fuera de 11 páginas
Añadir al carritoAn EXCITER on a traditional generator does what? 
: Voltage regulation (AVR) if you change the excitation current, you change the 
voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. 
: Limits 
When synchronizing to the interconnection, what needs to be synchronized? 
: Freque...
The purpose of the Deploy All Resources Action is to instruct all generating resources to 
be on line and at full output _________ 
: immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: 
: Ensure all...
Vista previa 2 fuera de 12 páginas
Añadir al carritoThe purpose of the Deploy All Resources Action is to instruct all generating resources to 
be on line and at full output _________ 
: immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: 
: Ensure all...
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) 
: D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. sys...
Vista previa 2 fuera de 15 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) 
: D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. sys...
Actions in low voltage alert? 
: Review transmission & generation outages 
Request reactive reserve check 
Heavy load voltage schedule warning purpose is to have members prepare far max 
support of voltages on the? 
: Bulk Power System 
Manual load dump warning & reduction of Non-critical plant loa...
Vista previa 4 fuera de 46 páginas
Añadir al carritoActions in low voltage alert? 
: Review transmission & generation outages 
Request reactive reserve check 
Heavy load voltage schedule warning purpose is to have members prepare far max 
support of voltages on the? 
: Bulk Power System 
Manual load dump warning & reduction of Non-critical plant loa...
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual 
implementation. 
: c. 4 hours 
The following would be considered non-critical plant load (Select 2) 
: A. Office Area Air Conditioners 
C. Lighting 
During a Cold Weather Alert, PJM will take which of the actions 
: D. A...
Vista previa 4 fuera de 38 páginas
Añadir al carritoA Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual 
implementation. 
: c. 4 hours 
The following would be considered non-critical plant load (Select 2) 
: A. Office Area Air Conditioners 
C. Lighting 
During a Cold Weather Alert, PJM will take which of the actions 
: D. A...
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ 
: off cost out of merit. 
Monitoring ___________ may give insights into system constraints. 
: Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line sch...
Vista previa 4 fuera de 31 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators 
operating ______________ 
: off cost out of merit. 
Monitoring ___________ may give insights into system constraints. 
: Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line sch...
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 
: 5 days 
If PJM ACE shows overgeneration, actual imports are: 
: Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? 
: Master Coordinator 
To correct for a slow or ...
Vista previa 2 fuera de 13 páginas
Añadir al carritoControl center facilities must have a minimum of how many days of fuel for the backup 
generator? 
: 5 days 
If PJM ACE shows overgeneration, actual imports are: 
: Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? 
: Master Coordinator 
To correct for a slow or ...
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). 
: off cost (out of merit) 
What is the minimum size for a solar park to be required to have real ...
Vista previa 2 fuera de 12 páginas
Añadir al carritoReal time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). 
: off cost (out of merit) 
What is the minimum size for a solar park to be required to have real ...
What is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4...
Vista previa 3 fuera de 24 páginas
Añadir al carritoWhat is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4...
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individua...
Vista previa 3 fuera de 27 páginas
Añadir al carritoDuring reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individua...
Unit Startup Notification Alert 
: Place generating units into a state of readiness (able to be brought online with 
48 hours); when a reliability assessment determines long lead time generation is 
needed for a future period; roughly 6 days prior to day needed 
Maximum Generation/Load Management ...
Vista previa 2 fuera de 11 páginas
Añadir al carritoUnit Startup Notification Alert 
: Place generating units into a state of readiness (able to be brought online with 
48 hours); when a reliability assessment determines long lead time generation is 
needed for a future period; roughly 6 days prior to day needed 
Maximum Generation/Load Management ...
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line?...
Vista previa 4 fuera de 49 páginas
Añadir al carritoDuring System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line?...
Which of the following balancing control modes is used by PJM under normal 
operations? 
: Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? 
: Weather Conditions & Day of the Week 
All of the following are limits that must be submitted...
Vista previa 4 fuera de 56 páginas
Añadir al carritoWhich of the following balancing control modes is used by PJM under normal 
operations? 
: Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? 
: Weather Conditions & Day of the Week 
All of the following are limits that must be submitted...
Which of the following statements is correct concerning PJM assuming frequency 
control of the restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too ...
Vista previa 4 fuera de 95 páginas
Añadir al carritoWhich of the following statements is correct concerning PJM assuming frequency 
control of the restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too ...
What is an ISO/RTO responsible for? 
: -Grid operations 
-Reliability 
-Transmission service 
Is an ISO/RTO is independent from: 
: -market participants 
-governance structure 
Does an ISO/RTO posses operational authority? 
: Yes 
PJM as an RTO Functions: 
: - Administer tariff 
- Administer regiona...
Vista previa 1 fuera de 3 páginas
Añadir al carritoWhat is an ISO/RTO responsible for? 
: -Grid operations 
-Reliability 
-Transmission service 
Is an ISO/RTO is independent from: 
: -market participants 
-governance structure 
Does an ISO/RTO posses operational authority? 
: Yes 
PJM as an RTO Functions: 
: - Administer tariff 
- Administer regiona...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller MASTER01. Stuvia facilitates payment to the seller.
No, you only buy this summary for $28.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now