Examen
NERC Test 1questions With Complete Solutions
- Grado
- Institución
A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off ...
[Mostrar más]