PJM Sample TO Exam Questions & Answers 2024
PJM Sample TO Exam Questions & Answers 2024 What is the minimum notice PJM requires for a nonemergency transmission outage work request which does not cause congestion? A. 48 hours B. First day of month proceeding the month of the outage C. 5 working days D. 1 week - ANSWER-B. First day of month proceeding the month of the outage A system load is 3000MW. To increase frequency by 1 Hz, how much load should be she? A. 80MW B. 180MW C. 350MW D. 500MW - ANSWER-B. 180MW When thunderstorms are in the vicinity of a critical bulk power transmission facility, the system operator should A. ensure automatic reclosing is in service B. place bulk power capacitors in service C. remove bulk power capacitors from service D. request generators on 500KV systems bring VAR output to 0 - ANSWER-A. ensure automatic reclosing is in service Which of the following actions would be FIRST to control a reactive transfer limit violation? A. place reactors in service B. Load off-cost(out of merit) generation C. issue load dump warning
Escuela, estudio y materia
- Institución
- PJM
- Grado
- PJM
Información del documento
- Subido en
- 3 de enero de 2024
- Número de páginas
- 13
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
pjm sample to exam
Documento también disponible en un lote