Examen
PJM Practice Exam 2024 | Questions with 100% Correct Answers | Verified | Latest Update 2024
- Grado
- Institución
Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - off cost (out of merit) What is the minimum size for a solar park to be required to have real an...
[Mostrar más]