100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
ATTSA TRAFFIC SUPERVISOR CERTIFICATION EXAM 2024 | 2 ACCURATE RECENTLY TESTING VERSIONS WITH A STUDY GUIDE | ACCUARATE AND EXPERT VERIFIED FOR GUARANTEED PASS | LATEST UPDATE $15.49   Añadir al carrito

Examen

ATTSA TRAFFIC SUPERVISOR CERTIFICATION EXAM 2024 | 2 ACCURATE RECENTLY TESTING VERSIONS WITH A STUDY GUIDE | ACCUARATE AND EXPERT VERIFIED FOR GUARANTEED PASS | LATEST UPDATE

1 revisar
 11 vistas  0 compra
  • Grado
  • ATTSA TRAFFIC SUPERVISOR CERTIFICATION
  • Institución
  • ATTSA TRAFFIC SUPERVISOR CERTIFICATION

ATTSA TRAFFIC SUPERVISOR CERTIFICATION EXAM 2024 | 2 ACCURATE RECENTLY TESTING VERSIONS WITH A STUDY GUIDE | ACCUARATE AND EXPERT VERIFIED FOR GUARANTEED PASS | LATEST UPDATE

Vista previa 4 fuera de 49  páginas

  • 17 de abril de 2024
  • 49
  • 2023/2024
  • Examen
  • Preguntas y respuestas
  • ATTSA TRAFFIC SUPERVISOR CERTIFICATION
  • ATTSA TRAFFIC SUPERVISOR CERTIFICATION

1  revisar

review-writer-avatar

Por: DrBellaPhD • 2 meses hace

Informative, Value for money, Highly recommend

avatar-seller
ATTSA TRAFFIC SUPERVISOR CERTIFICATION EXAM 2024 |
2 ACCURATE RECENTLY TESTING VERSIONS WITH A
STUDY GUIDE | ACCUARATE AND EXPERT VERIFIED FOR
GUARANTEED PASS | LATEST UPDATE
When cones are substituted for drums at nighttime closer, what is the maximum cone spacing?
A. 20'
B. 30'
C. 40'
D. 50'
40'
What type of flashing warning lights are required when there is a nighttime lane closer?
A. ROAD WORK AHEAD
B. LANE CLOSED AHEAD
C. A & B
D. NONE OF THE ABOVE
ROAD WORK AHEAD
&
LANE CLOSED AHEAD
If there is a lane closure of greater than three days, what is required?
A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the
merge.
B. The appropria te color work zone edge lines shall be applied along the taper and tangent
sections.
C. All the above
D. None of the above
The appropriate color work zone edge lines shall be applied along the taper and tangent sections.
Work zone pavement marking that conflict with final traffic lanes shall be temporary paint.
A. True
B. False
False
What are the extra advance warning signs?
A. Lane Close Ahead
B. Watch for Stopped Traffic
C. Road Work Ahead
D. All the above
1 / 4

Lane Change Ah ead
&
Watch for Stopped Traffic
&
Road Work Ahead
Is the advisory speed plaque used in all traffic zones?
A. True
B. False
False
When the approach speed limit is 40 mph or less, 36" warning signs may be used.
A. True
B. False
True
Road Work Ahead signs sha ll be provided on entrance ramps or roadways entering the work
limits.
A. True
B. False
True
Is a shadow vehicle used in all traffic zo nes?
A. True
B. False
False
The shadow vehicle is occupied whenever workers are in the work area.
A. True
B. False
False
What class one light is the shadow vehicle equipped with?
A. Flashing Yellow Light
B. Oscillating Yellow Light
C. Yellow Strobe Light
D. All of the above
All of the above
When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
2 / 4

C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum heigh t 42"
Daytime traffic control minimum height 28"
When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control m inimum height 42"
Daytime traffic control minimum height 28"
When cones are substituted for drums for nighttime closers, what is the minimum cone height
requirement?
A. 18"
B. 28"
C. 36"
D. 42"
42"

End Road Work signs are only required for lane closures of more than ______ day.
A. 1
B. 2
C. 3
D 4
1
Sign spacing should be adjusted to avoid conflict with existi ng signs, minimum spacing to
existing signs shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50
mph or greater.
A. True
B. False
True
The minimum acceptable length for the merge taper shall be determined by _________ the width
of the offset by the merge taper rate.
A. Subtracting
B. Adding
C. Divide
D. Multiplying
Multiplying
3 / 4

The tangent (recovery area) section between the two merge tapers should be 2 times longer of the
two merge tapers.
A. True
B. False
True
What is a fundamental principle of temporary traffic control?
A. To inconvenience motorists as much as possible so they will find another route.
B. To guide and direct motorists through or around the work area as efficiently as possible. C. To
make traffic move as slow as possible.
D. All of the above are fundamental principles.
To guide and direct motorists through or around the work area as efficiently as possible.
What needs to be done when work is suspended for any length of time?
A. Take down the ROAD WORK AHEAD sign
B. Cover up the END ROAD WORK sign
C. Erect a WORK SUSPENDED sign
D. Cover or remove the FLAGGER AHEAD sign
Cover or remove the FLAGGER AHEAD sign
What are the four zones of a work area?
A. Activity area, pedestrian ar ea, termination area and equipment area.
B. Advance warning area, transition area, activity area and termination area.
C. Equipment area, termination area, activity area and transition area.
D. Transition area, advanced warning area, pedestrian area and bu ffer zone.
Advance warning area, transition area, activity area and termination area.
Which of the following signs might you see in the advanced warning area?
A. END ROAD WORK
B. YIELD
C. EXIT OPEN
D. LEFT LANE CLOSED AHEAD
LEFT LANE CLOSED AHEAD
Which of the following is NOT a type of taper?
A. Shifting taper
B. Merging taper
C. Aligning taper
D. Downstream taper
Aligning taper
The formula for taper length on expressways with a speed limit of 65mph is which of the
following? Powered by TCPDF (www.tcpdf.org)
4 / 4

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller RegisteredNurse. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender
$15.49
  • (1)
  Añadir