100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
Commercial Construction Final Review questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating $7.99   Añadir al carrito

Examen

Commercial Construction Final Review questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

 6 vistas  0 veces vendidas
  • Grado
  • Commercial Construction
  • Institución
  • Commercial Construction

Commercial Construction Final Review questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

Vista previa 2 fuera de 10  páginas

  • 5 de agosto de 2024
  • 10
  • 2024/2025
  • Examen
  • Preguntas y respuestas
  • Commercial Construction
  • Commercial Construction
avatar-seller
Commercial Construction Final Review
-construction-related
-physical
-contractual and legal
-performance
-economic
-political and public - ANS-Name the six categories of risk

-errors and omissions
-conflicts in documents
-defective design
-shop drawings - ANS-Name the four types of risks that are properly allocated solely to the
engineer or architect.

-if a risk is imposed upon a party, an opportunity for reward to that party should exist for properly
dealing with it
-allocation of the risk to the party that is in the best position to control it
-allocation of the risk to the party in whose hands the efficiency of the system is best promoted
-allocation of the risk to the party that is best able to undertake it financially
-steps should be taken to assure that risks are actually allocated as intended - ANS-What are
the four guidelines for allocation of risk in construction contracts?

-Insurance shifts to the owner protecting against anything not from a result of contractor's
negligence.
-Owner must perform work on overtime bases if contractor being interfered with punch-list items.
-Hedge against lien claims and a guarantee to the owner that sufficient funds will remain to pay
another party to complete the work or correct items not up to the standard.
-If all lien waivers received, amount of retention should be put into value of work on punch
list.Two times the value of punch list items. - ANS-Effects of achieving substantial completion
upon the contract requirements for project insurance, liquidated damages, time for filing lien
claims, processing of payments, and retainage.

-parties must be prepared to discuss risk
-who is in best position to take on risk
-who can financial handle risk
-who wants to take on risk - ANS-What are the principal issues that should be considered in the
allocation and assumption of risk responsibility?

-site access
-subsurface conditions
-acts of god-

, economic disasters
-funding
-owner-furnished equipment
-environmental controls
-codes and regulations
-public disorder - ANS-Name four types of risks that are properly retained solely by the owner.

-starts clock on project
-yes site access is authorized - ANS-What is the significance of a Notice of Award? What does it
do? Is access to the site authorized thereby?

-To record work hours of machinery and work by the contractor
-To test any of the materials coming onto the jobsite according to the spec.
-To make sure no fraudulent acts are happening on the job site.
-To make sure no deficiencies are happening on the job. - ANS-Describe the responsibilities of
the inspector during
construction.

-weather
-subcontractor failure
-accidents at site
-defective work
-materials and equipment
-labor
-safety at site
-union strife - ANS-Name four types of construction risks that are properly allocated solely to the
contractor.

(a) Bid bond
(b) Payment bond
(c) Performance bond - ANS-What types of bonds are required to be provided by a
bidder/contractor on a public works contract?
(a) Bid bond
(b) Payment bond
(c) Performance bond

(a) Design risks - ANS-Which of the following items is/are not among the categories of risk?
(a) Design risks
(b) Political and public risks
(c) Contractural and legal risks
(d) Economic risks
(e) Construction related risks
(f) Physical risks
(g) Performance risks

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender

Vistos recientemente


$7.99
  • (0)
  Añadir