100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
Lean Six Sigma Green Belt IASSC Latest Update Actual Exam 225 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor $20.49   Añadir al carrito

Examen

Lean Six Sigma Green Belt IASSC Latest Update Actual Exam 225 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor

 8 vistas  0 veces vendidas
  • Grado
  • Lean Six Sigma Green Belt IASSC
  • Institución
  • Lean Six Sigma Green Belt IASSC

Lean Six Sigma Green Belt IASSC Latest Update Actual Exam 225 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor

Vista previa 3 fuera de 24  páginas

  • 30 de agosto de 2024
  • 24
  • 2024/2025
  • Examen
  • Preguntas y respuestas
  • Lean Six Sigma Green Belt IASSC
  • Lean Six Sigma Green Belt IASSC
avatar-seller
Lean Six Sigma Green Belt IASSC Latest Update
2024-2025 Actual Exam 225 Questions and 100%
Verified Correct Answers Guaranteed A+ Verified
by Professor

(Within DPMO) How is Total number of opportunities calculated? - CORRECT
ANSWER: Units*Number of opportunities per unit


3 M's of Lean - CORRECT ANSWER: Muda, Muri, Mura


5 Whys technique - CORRECT ANSWER: asks iterative questions to find the root cause


5S - CORRECT ANSWER: Organize work area: Sort, Set in order, Shine, Standardize,
Sustain


5S helps in..? - CORRECT ANSWER: Improving the workplace, productivity and
maintenance


A Measurement System Analysis (MSA) is needed prior to any...? - CORRECT
ANSWER: data collection activities


A project charter - CORRECT ANSWER: Define's a team's mission, scope of operation,
objectives, time frame, and consequences for the project


A project plan - CORRECT ANSWER: An approved document used to control and
manage a project


A test-statistic is used to ? - CORRECT ANSWER: Determine the validity of a
hypothesis test

,Affinity Diagram - CORRECT ANSWER: Method used by teams to organize several
ideas


Alternative Hypothesis - CORRECT ANSWER: The hypothesis that states there is A
DIFFERENCE OR CHANGE


Another name for Attribute data - CORRECT ANSWER: Discrete


Another word for Variable data - CORRECT ANSWER: Continuous


Apart from financial accounting, Business Score Card (BSC) also considers? -
CORRECT ANSWER: Internal processes, customer satisfaction, and learning and
growth


Benchmarking - CORRECT ANSWER: Comparing an organization's business
processes, practices, and performance metrics with that of industry leaders.


Bias
The measure of distance between the measure value and the true or actual value -
CORRECT ANSWER: The measure of distance between the measure value and the
true or actual value


Binomial Distribution - CORRECT ANSWER: -Defective items
-Sample size > 30, >10%


Business Process (SIPOC) - CORRECT ANSWER: Supplier, Input, Process, Output,
Customer


C chart used for - CORRECT ANSWER: Defective which have constant subgroups size
and is represented as number of defects

, Cause and Effect Diagram is used to? - CORRECT ANSWER: Find the the root cause
and the potential solutions to a problem


Census - CORRECT ANSWER: A study that obtains data from every member of a
population


Chi-Square Distribution - CORRECT ANSWER: -Used in Inferential Statistics
-Used in hypothesis test


Chosen as an industry standard and accounts for 99% of Measurement System
variation? - CORRECT ANSWER: 5.15


Combination - CORRECT ANSWER: The unordered arrangement of a set, group, or
number of things


Common Lean tools and techniques - CORRECT ANSWER: Poka-Yoke, 5S, Kaizen,
JIT, Heinjunka, Standardized Work, Take Time


Comparing Cp and Cpk
if Cpk < Cp **Cpk can never be larger than Cp because Cp represents the maximum
capability with the current process variation Cp= process performing at MAXIMUM
capability Cpk = how the process is CURRENTLY performing - CORRECT ANSWER: ->
Mean is not centered between specification limits


Control Pan - CORRECT ANSWER: Written summary description of the system for
controlling a process


Control plan tools - CORRECT ANSWER: -Control cahrts
-MSA
-Error-proofing
-SOP

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender

Vistos recientemente


$20.49
  • (0)
  Añadir