100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
NCARB PJM - AHPP Study Notes: Questions/Solutions $9.99   Añadir al carrito

Examen

NCARB PJM - AHPP Study Notes: Questions/Solutions

 6 vistas  0 veces vendidas
  • Grado
  • NCARB - National Council of Architectural Registration Boards Certified
  • Institución
  • NCARB - National Council Of Architectural Registration Boards Certified

NCARB PJM - AHPP Study Notes: Questions/Solutions

Vista previa 2 fuera de 8  páginas

  • 24 de octubre de 2024
  • 8
  • 2024/2025
  • Examen
  • Preguntas y respuestas
  • NCARB - National Council of Architectural Registration Boards Certified
  • NCARB - National Council of Architectural Registration Boards Certified
avatar-seller
NCARB PJM - AHPP Study Notes: Questions/Solutions

Modification made after the agreement on construction documents Right
Ans - Change order, construction change directives, minor changes in
architect' supplemental instructions

Construction change directive Right Ans - Owner and contractor unable to
agree on cost and time, and owner direct a change in the work. Signed by
owner and prepared and signed by the architect

Change orders Right Ans - written permission or instructions concerning
any aspect of a project that modify design concepts, construction designs, or
product specifications. Signed by owner, contractor and architect

Cost Plus Fee Right Ans - The contractor is compensated for the actual
expenses of labor, materials, and subcontractors in addition to a fixed fee.

Contractor warranties Right Ans - 1. Statue of limitation; statue of repose
2. Product warranty
3. 1 year warranty period

RFI Right Ans - A question from the contractor to the designer or to the
client

SD basic services Right Ans - Review information, codes; preliminary
selection of major building system and construction materials; basic
consideration of environmentally responsible design; estimate cost; consider
value of alternative design choices.

Owner's right when contractor making a mistake Right Ans - Have another
contractor do the correction;issue a change order; issue a construction change
directive; terminate contract at any time.

Prevention Costs Right Ans - costs associated with preventing defects
before they happen

Direct Labor Right Ans - All labor of technical staff, principals and support
staff that is directly chargeable to projects

, Indirect Labor Right Ans - All labor not charged to a specific project or
revenue-producing account such as administration, general office time and
marketing

Net Operating Revenue Right Ans - The money that remains from billing
after deducting fees and expenses, reimbursable expenses and non-
reimbursable project-related expenses

Overhead Rate Right Ans - Total office overhead / total direct labor (1.3-
1.5)

Revenue per Technical Staff Right Ans - The amount of net revenue
produced per technical staff member, or those staff members most directly
involved with charging direct time and producing jobs

Revenue per Total Staff Right Ans - Amount of net revenue produced per
staff member per year, including principals and part-time employees
Annual net operating revenue / total number of employees

Net Multiplier Right Ans - Net revenue of the firm /Cost of direct labor

Performance Bond Right Ans - A contract bond guaranteeing that a
contractor's work will be completed according to plans and specifications.

Labor and Material Payment Bond Right Ans - A bond guaranteeing to the
owner that the contractor will pay for all labor and materials used for the
project.

Liquidated Damages Right Ans - An amount, stipulated in the contract, that
the parties to a contract believe to be a reasonable estimation of the damages
that will occur in the event of a breach.

Schedule of Values Right Ans - A statement furnished to the architect by the
contractor reflecting the amounts to be allotted for the principal divisions of
the work. It serves as a guide for reviewing the contractor's periodic
applications for payment.

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender

Vistos recientemente


$9.99
  • (0)
  Añadir