100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada
logo-home
CDS NCARB – Questions With Complete Solutions $12.99   Añadir al carrito

Examen

CDS NCARB – Questions With Complete Solutions

 8 vistas  0 veces vendidas
  • Grado
  • NCARB - National Council of Architectural Registration Boards Certified
  • Institución
  • NCARB - National Council Of Architectural Registration Boards Certified

CDS NCARB – Questions With Complete Solutions

Vista previa 2 fuera de 14  páginas

  • 24 de octubre de 2024
  • 14
  • 2024/2025
  • Examen
  • Preguntas y respuestas
  • NCARB - National Council of Architectural Registration Boards Certified
  • NCARB - National Council of Architectural Registration Boards Certified
avatar-seller
CDS NCARB – Questions With Complete Solutions

The architect informs the owner that because of budget constraints and
ceiling heights, the sprinkler piping must be exposed. The owner directs the
architect to delete the sprinkler system. Prior to deleting the system, the
architect should check the requirements for sprinklers in
a the building code
B the plumbing code
C ASTM
D ACI Right Ans - A the building code

Which of the following methods of bidding is required on most projects for
which government funds are to be used?
A Direct
B Negotiated
C Invited
D Public Right Ans - D Public

Which of the following project delivery methods always requires preparation
of several individual bid-document packages?
a Design-bid-build
b Fast track
c Design-build
d Turnkey Right Ans - b Fast track

In developing a list of bidders for a private project, the architect's role is to
a select the contractor
b recommend qualified contractors
c rank the contractors in order of preference
d list of proposed material suppliers Right Ans - b recommend qualified
contractors

A contractor's ability to obtain a performance bond for a specific construction
contract is determined by the

a owner
b architect
c contractor
d surety Right Ans - d surety

, AIA Document A305 [CCDC 11], Contractor's Qualification Statement, includes
a

a financial statement
b list of subcontractors
c list of proposed consultants
d list of proposed material suppliers Right Ans - a financial statement

After considering all bids, the owner favors a bid with irregularities.
According to AIA Document A701, Instructions to Bidders [CCDC 23, A Guide
to Calling Bids and Awarding Contracts], the owner

a has the right to waive irregularities and accept the bid
b has the right to extend the bidding period for corrections
c must informally request corrections from the bidder
d must only consider bids without irregularities Right Ans - a has the right
to waive irregularities and accept the bid

A local bank has a budget of $30,000,000 to construct a new main office. The
bank wants to use contractors who are customers of the bank; however, none
of the bank's contractor customers can bond the entire amount of the
contract. Which of the following is a possible option?
a Design-build
b Fast-track
c Multiple prime contractors
d Additive change orders Right Ans - c Multiple prime contractors

Which of the following is an appropriate agenda item for the prebid
conference?
a Occupancy-permit procedures
b Notification of future addenda
c Pre-commissioning procedures
d Status of change orders Right Ans - b Notification of future addenda

A contractor under a fixed-price construction contract has allowed the
electrical subcontractor to install lighting fixtures other than those stated in
the contract documents. The electrical subcontractor and the contractor both
believe the substituted fixtures to be of equal value. The construction is

Los beneficios de comprar resúmenes en Stuvia estan en línea:

Garantiza la calidad de los comentarios

Garantiza la calidad de los comentarios

Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!

Compra fácil y rápido

Compra fácil y rápido

Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.

Enfócate en lo más importante

Enfócate en lo más importante

Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!

Preguntas frecuentes

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

100% de satisfacción garantizada: ¿Cómo funciona?

Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

45,681 summaries were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Empieza a vender
$12.99
  • (0)
  Añadir