COCO SOLUTIONS ACADEMIC STORE
COCO SOLUTIONS ACADEMIC STORE YOU GET ALL KIND OF EXAMS,STUDYGUIDES,ASSIGNMENTS,FLASHCARDS,NOTES,SUMMARIES,REVIEWS .ALL YOUR ACADEMIC SOLUTIONS WE GOT YOU COVERED.WE ARE YOUR STUDY SOLUTION ,MAKING YOUR EDUCATION JOURNEY SMOOTH AND EFFICIENT FOR MORE ENQUIRIES FEEL FREE TO REACH US OUT.
- 3280
- 0
- 152
Community
- Seguidores
- Siguiendo
3 Comentarios recibidos
3420 artículos
Georgia CO Exam - WDO Category Test Questions And Already Revised Answers.
Crawlspaces: If you smell a gas leak what should you do? - Answer Don't go in or get out! 
 
What safety equipment (or PPE) should you wear when in crawlspaces? - Answer Bump cap, coveralls, safety glasses, RESPIRATOR, and knee pads 
 
Why is excess moisture in crawl spaces such a big deal to our customers? - Answer Facilitates an environment for pests that can cause structural and health concerns in addition to being nuisances. 
 
T/F: Do customers breath the air from the crawlspace? ...
- Package deal
- Examen
- • 30 páginas •
Crawlspaces: If you smell a gas leak what should you do? - Answer Don't go in or get out! 
 
What safety equipment (or PPE) should you wear when in crawlspaces? - Answer Bump cap, coveralls, safety glasses, RESPIRATOR, and knee pads 
 
Why is excess moisture in crawl spaces such a big deal to our customers? - Answer Facilitates an environment for pests that can cause structural and health concerns in addition to being nuisances. 
 
T/F: Do customers breath the air from the crawlspace? ...
Residential Contractor study guide Exam Questions With Solved Solutions.
When is a commercial contractor needed - Answer on site sewage system installations with a design flow rate greater than 2000 gallons per day. 
 
What is required for the installation of aerobic drip emitter systems - Answer drip emmiter 
 
when do you need an area fill mound - Answer required for the installation of an area fill system or a wisconsin mound system 
 
what are all these listed? - Answer additional certification modules that are required for specialized installation an...
- Package deal
- Examen
- • 10 páginas •
When is a commercial contractor needed - Answer on site sewage system installations with a design flow rate greater than 2000 gallons per day. 
 
What is required for the installation of aerobic drip emitter systems - Answer drip emmiter 
 
when do you need an area fill mound - Answer required for the installation of an area fill system or a wisconsin mound system 
 
what are all these listed? - Answer additional certification modules that are required for specialized installation an...
General Contractor License - KB2 Study Prep Questions Fully Solved.
At what stage of the construction process would the builder cut out the sole plate in a door opening? - Answer after the wall has been erected and braced 
 
When wide square edge boards are being used for board and batten siding, how should the batten strips be nailed ? - Answer to only one siding board 
 
According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any commercial building) is _____ inches above the finished floor height of the deck or balcon...
- Package deal
- Examen
- • 26 páginas •
At what stage of the construction process would the builder cut out the sole plate in a door opening? - Answer after the wall has been erected and braced 
 
When wide square edge boards are being used for board and batten siding, how should the batten strips be nailed ? - Answer to only one siding board 
 
According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any commercial building) is _____ inches above the finished floor height of the deck or balcon...
General contractor Latest Exam Questions With Correct Revised Answers.
In a post tensioned Beam what is the minimum size bar used to support the beam? - Answer #4 Bar 
 
What is the minimum height between finished floor and joist in the kitchen is 48" on center? - Answer 7 FT 
 
How thick does a load bearing masonry need to be on a single story building? - Answer 6 inches 
 
What chemical is used for high heat concrete - Answer retarder 
 
when mechanical equipment is on the roof, how far from the edge of the roof should a warning line be if the equipm...
- Package deal
- Examen
- • 20 páginas •
In a post tensioned Beam what is the minimum size bar used to support the beam? - Answer #4 Bar 
 
What is the minimum height between finished floor and joist in the kitchen is 48" on center? - Answer 7 FT 
 
How thick does a load bearing masonry need to be on a single story building? - Answer 6 inches 
 
What chemical is used for high heat concrete - Answer retarder 
 
when mechanical equipment is on the roof, how far from the edge of the roof should a warning line be if the equipm...
General Contractor Georgia 3 Prep Exam Questions And Already Passed Answers.
Expansion joint material is req where a slab abuts concrete or masonry walls. How many lf of expansion joint material will be req for the slab at the main floor garage? - Answer 70' 
 
Edges of lugs, brackets, rivets, boltheads attached to the fire protected structural members may extend within what distance from fire prot surface? - Answer 1 in 
 
Bed joints for masonry units lay directly on the foundation can be a max of? - Answer 3/4" 
 
Bottom bearing square end steel joists must ...
- Package deal
- Examen
- • 5 páginas •
Expansion joint material is req where a slab abuts concrete or masonry walls. How many lf of expansion joint material will be req for the slab at the main floor garage? - Answer 70' 
 
Edges of lugs, brackets, rivets, boltheads attached to the fire protected structural members may extend within what distance from fire prot surface? - Answer 1 in 
 
Bed joints for masonry units lay directly on the foundation can be a max of? - Answer 3/4" 
 
Bottom bearing square end steel joists must ...
Residential Contractor Exam Study Guide (Application Process pg 2-3) Questions And All Correct Answers.
Commercial Contractor - Answer Required for on‐site sewage system installations with a design flow rate greater than 2,000 gallons per day 
 
Drip Emitter - Answer Required for the installation of aerobic drip emitter systems 
 
Area Fill Mound - Answer Required for the installation of an area fill system or a Wisconsin mound system 
 
Pumper - Answer required for septage removal and disposal. 
 
Septage Removal and Disposal Permit - Answer permit required for septage removal an...
- Package deal
- Examen
- • 4 páginas •
Commercial Contractor - Answer Required for on‐site sewage system installations with a design flow rate greater than 2,000 gallons per day 
 
Drip Emitter - Answer Required for the installation of aerobic drip emitter systems 
 
Area Fill Mound - Answer Required for the installation of an area fill system or a Wisconsin mound system 
 
Pumper - Answer required for septage removal and disposal. 
 
Septage Removal and Disposal Permit - Answer permit required for septage removal an...
Georgia Residential Contractor Exam Study Guide Exam Questions And 100% Actual Answers.
Applications include: - Answer - Name and address of property owner 
- Location of property 
- Site plan 
- Type of facility 
- Type of water supply 
- Number of bedrooms 
- Soils information 
 
Any facility having occupancy for ___________ must provide an approved on site sewage management system - Answer two hours or more 
 
Requirements in permits: - Answer Tank size, trench length, depth and width, and special conditions 
 
Absorption field lengths are typically sized by? - Answer ...
- Package deal
- Examen
- • 6 páginas •
Applications include: - Answer - Name and address of property owner 
- Location of property 
- Site plan 
- Type of facility 
- Type of water supply 
- Number of bedrooms 
- Soils information 
 
Any facility having occupancy for ___________ must provide an approved on site sewage management system - Answer two hours or more 
 
Requirements in permits: - Answer Tank size, trench length, depth and width, and special conditions 
 
Absorption field lengths are typically sized by? - Answer ...
OSSF INSTALLER 1 COMPILLED EXAMS ,NEW BUNDLE UPDATED VERSIONS 100% CORRECT.
1
Exam (elaborations)
Module 6 Final Review Exam Questions With Guaranteed Pass Solutions.

2
Exam (elaborations)
IL SEPTIC INSTALLERS MIDTERM EXAM QUESTIONS SOLVED CORRECTLY.

3
Exam (elaborations)
Commercial Septic System Installer Pro Exam Questions Answered Correctly.

4
Exam (elaborations)
Designated Representative OSSF Practice Exam Questions
- Lote
- • 7 artículos •
- Installer I Study Guide Exam Questions And 100% Actual Answers. • Examen
- Installer's Test Assignment Questions Solved Correctly. • Examen
- Module 2 Review Questions Installer 1 And Already Passed Answers. • Examen
- Designated Representative OSSF Practice Exam Questions And 100% Accurate Answers. • Examen
- Commercial Septic System Installer Pro Exam Questions Answered Correctly. • Examen
- Y mas...
1
Exam (elaborations)
Module 6 Final Review Exam Questions With Guaranteed Pass Solutions.

2
Exam (elaborations)
IL SEPTIC INSTALLERS MIDTERM EXAM QUESTIONS SOLVED CORRECTLY.

3
Exam (elaborations)
Commercial Septic System Installer Pro Exam Questions Answered Correctly.

4
Exam (elaborations)
Designated Representative OSSF Practice Exam Questions
Module 6 Final Review Exam Questions With Guaranteed Pass Solutions.
Disposal and treatment selection criteria - Answer Primary - OSSF must function properly under specific soil and other conditions present of the site. 
 
Secondary - Cost, Minimal maintenance, simplicity of operation, long-term reliability 
 
Table XIII: 

 
Installer I is able to construct and repair these systems - Answer Standard Absorptive drainfield 
ET (unlined) evaporation drainfield 
Pumped effluent drainfields 
Gravelless pipe drainfield 
Soil Substitution 
 
*can install holding ...
- Package deal
- Examen
- • 32 páginas •
Disposal and treatment selection criteria - Answer Primary - OSSF must function properly under specific soil and other conditions present of the site. 
 
Secondary - Cost, Minimal maintenance, simplicity of operation, long-term reliability 
 
Table XIII: 

 
Installer I is able to construct and repair these systems - Answer Standard Absorptive drainfield 
ET (unlined) evaporation drainfield 
Pumped effluent drainfields 
Gravelless pipe drainfield 
Soil Substitution 
 
*can install holding ...
IL SEPTIC INSTALLERS MIDTERM EXAM QUESTIONS SOLVED CORRECTLY.
Public Sewer Connection - Answer Private residence must connect if w/in 300' or for any commercial bldg. w/in 300' that has flows less than 1500 gpd. Commercial w/ flows = to or greater than 1500 gpd must connect if sewer is w/in 1000'. 
Unless physical barrier, ordinance, or cannot be done w/ individual line (4" line)-then PSD system is OK. 
 
Acceptable Pipe Materials - Answer Vitrified clay, ductile iron, or plastic. 
Anything after the tank or from distribution box has to be vitr...
- Package deal
- Examen
- • 18 páginas •
Public Sewer Connection - Answer Private residence must connect if w/in 300' or for any commercial bldg. w/in 300' that has flows less than 1500 gpd. Commercial w/ flows = to or greater than 1500 gpd must connect if sewer is w/in 1000'. 
Unless physical barrier, ordinance, or cannot be done w/ individual line (4" line)-then PSD system is OK. 
 
Acceptable Pipe Materials - Answer Vitrified clay, ductile iron, or plastic. 
Anything after the tank or from distribution box has to be vitr...
Portage Pathophysiology Module 9 Exam With Solved Solutions 2024.
Portage A & P 1 Module 5 Exam With Correct Complete Answers 2024.
Nurs 3032 Exam Review Question And Verified Answers To Pass 2024.