Kartelodoc
En esta página, encontrarás todos los documentos, paquetes y tarjetas que ofrece el vendedor kartelodoc.
- 1414
- 0
- 96
Community
- Seguidores
- Siguiendo
1510 artículos
Driving Knowledge Test (Railroad Crossings, Light Rail and Street Cars) Questions With Complete Solutions
Driving Knowledge Test (Railroad Crossings, Light Rail and Street Cars) Questions With Complete Solutions 
 
A railroad advance sign warns you that a railroad crossing is ahead. - Answer 
 
/.A railroad crossbuck assembly will include a yield or stop sign. Obey the posted sign. If there is more than one track, a sign below the crossbuck indicates the number of tracks. - Answer 
 
/.A crossing signal system includes flashing red lights 
and may have a gate with red flashing lights that are 
activ...
- Package deal
- Examen
- • 2 páginas •
Driving Knowledge Test (Railroad Crossings, Light Rail and Street Cars) Questions With Complete Solutions 
 
A railroad advance sign warns you that a railroad crossing is ahead. - Answer 
 
/.A railroad crossbuck assembly will include a yield or stop sign. Obey the posted sign. If there is more than one track, a sign below the crossbuck indicates the number of tracks. - Answer 
 
/.A crossing signal system includes flashing red lights 
and may have a gate with red flashing lights that are 
activ...
BNSF Exam 1 Complete Guide with correct Answers
BNSF Exam 1 Complete Guide with correct Answers 
 
 
In case of doubt or uncertainty? (GCOR 1.1.1) - AnswerTake the safe course 
 
/.What are General Orders, and what do they contain? (GCOR 1.3.2) - Answer1. Contain only information and instructions related to rules or operating practices. 
2. Replace any Rule, Special Instruction, or regulation that conflicts with the General Order. 
 
/.What should an employee do if called before legal off-duty time has expired? (GCOR 1.17) - AnswerThe employe...
- Package deal
- Examen
- • 21 páginas •
BNSF Exam 1 Complete Guide with correct Answers 
 
 
In case of doubt or uncertainty? (GCOR 1.1.1) - AnswerTake the safe course 
 
/.What are General Orders, and what do they contain? (GCOR 1.3.2) - Answer1. Contain only information and instructions related to rules or operating practices. 
2. Replace any Rule, Special Instruction, or regulation that conflicts with the General Order. 
 
/.What should an employee do if called before legal off-duty time has expired? (GCOR 1.17) - AnswerThe employe...
BNSF Exam 2 with correct Answers (Fully solved)
BNSF Exam 2 with correct Answers (Fully solved) 
 
What is the verbiage would you say if you need to ask a train to change an established route? what verbiage would you use? AKA: if you need to take a signal back on a closely approaching train, what would you ask? - AnswerCan the engineer comply with a signal change to stop. 
Engineer must identify themselves by name and that same exact thing that I asked them. 
 
/.If I looked at a Mile Post and it has an X or Z at the end of it...what does tha...
- Package deal
- Examen
- • 11 páginas •
BNSF Exam 2 with correct Answers (Fully solved) 
 
What is the verbiage would you say if you need to ask a train to change an established route? what verbiage would you use? AKA: if you need to take a signal back on a closely approaching train, what would you ask? - AnswerCan the engineer comply with a signal change to stop. 
Engineer must identify themselves by name and that same exact thing that I asked them. 
 
/.If I looked at a Mile Post and it has an X or Z at the end of it...what does tha...
BNSF GCOR FOR FINAL EXAM QUESTIONS AND ANSWERS
BNSF GCOR FOR FINAL EXAM QUESTIONS AND ANSWERS 
 
 
Obeying the rules - AnswerWhat is essential to job safety and continued employment? 
 
/.Shoving movements, leaving equipment foul of an adjacent track or the handling of hand-operated swithches or fixed derails. - AnswerThe right to challenge a directive which based on the employees good faith determination, would violate a railroad operating rule relating to; 
 
/.Corrected, or set out of the train. - AnswerA freight car with any defect that ...
- Package deal
- Examen
- • 11 páginas •
BNSF GCOR FOR FINAL EXAM QUESTIONS AND ANSWERS 
 
 
Obeying the rules - AnswerWhat is essential to job safety and continued employment? 
 
/.Shoving movements, leaving equipment foul of an adjacent track or the handling of hand-operated swithches or fixed derails. - AnswerThe right to challenge a directive which based on the employees good faith determination, would violate a railroad operating rule relating to; 
 
/.Corrected, or set out of the train. - AnswerA freight car with any defect that ...
BNSF Session 4 Exam Questions With 100% Correct Answers
BNSF Session 4 Exam Questions With 100% Correct Answers 
 
If you have a track relay the two common resistance of the coil are ________ Ohms and _________ and are usually supplied with ________ volts? - Answer2 Ohms, 4 Ohms, and 1-2Volts 
 
/.If you have a line relay the two common resistances of the coil are ________ Ohms and ________ Ohms and are usually supplied with _________ volts? - Answer500 Ohms, 1000 Ohms, and 10-14 Volts 
 
/.In CTC territory, a hand throw switch is not sufficient prot...
- Package deal
- Examen
- • 7 páginas •
BNSF Session 4 Exam Questions With 100% Correct Answers 
 
If you have a track relay the two common resistance of the coil are ________ Ohms and _________ and are usually supplied with ________ volts? - Answer2 Ohms, 4 Ohms, and 1-2Volts 
 
/.If you have a line relay the two common resistances of the coil are ________ Ohms and ________ Ohms and are usually supplied with _________ volts? - Answer500 Ohms, 1000 Ohms, and 10-14 Volts 
 
/.In CTC territory, a hand throw switch is not sufficient prot...
BNSF STUDY EXAM QUESTIONS AND ANSWERS
BNSF STUDY EXAM QUESTIONS AND ANSWERS 
 
 
The purpose of a contractor safety action plan is? - Answerlocation specific plan for carrying out elements of a company's safety management system 
 
/.A contractor employer must ensure that its safety action plan(s) are: - AnswerAll: 
maintained with each work group on BNSF railway property 
Available withe the BNSF project Representative or Employee in charge 
Uploaded to Contractor Orientation at 
 
/.The 24 hour BNSF emergency number to call i...
- Package deal
- Examen
- • 5 páginas •
BNSF STUDY EXAM QUESTIONS AND ANSWERS 
 
 
The purpose of a contractor safety action plan is? - Answerlocation specific plan for carrying out elements of a company's safety management system 
 
/.A contractor employer must ensure that its safety action plan(s) are: - AnswerAll: 
maintained with each work group on BNSF railway property 
Available withe the BNSF project Representative or Employee in charge 
Uploaded to Contractor Orientation at 
 
/.The 24 hour BNSF emergency number to call i...
BNSF Test 6 Questions With Complete Solutions
BNSF Test 6 Questions With Complete Solutions 
 
What must the transmitting employee say to indicate a radio transmission is complete and no response is expected? (2.4) - AnswerOut 
 
/.Trains must release Track and Time: (10.3b) - AnswerBefore the time granted expires 
 
/.Before granting Track and Time, what must the control operator do to the control machine to prevent movement into the limits? (10.3.1) - AnswerApply blocking or marking devices. 
 
/.What is a fixed signal at the entrance of...
- Package deal
- Examen
- • 9 páginas •
BNSF Test 6 Questions With Complete Solutions 
 
What must the transmitting employee say to indicate a radio transmission is complete and no response is expected? (2.4) - AnswerOut 
 
/.Trains must release Track and Time: (10.3b) - AnswerBefore the time granted expires 
 
/.Before granting Track and Time, what must the control operator do to the control machine to prevent movement into the limits? (10.3.1) - AnswerApply blocking or marking devices. 
 
/.What is a fixed signal at the entrance of...
Bnsf-Maintenance of Way Operating Rules Exam Questions and Answers
Bnsf-Maintenance of Way Operating Rules Exam Questions and Answers 
 
Track warrant control- method to authorize train movements or protect men and equipment on a main track within specified limits in a territory designated by the timetable. - AnswerTWC 
 
/.When used in relation to a manually operated switch or derail, a lock that can be locked or unlocked only by the craft or group of workers applying the lock. - AnswerEffective locking device 
 
/.A track extending through yards and between s...
- Package deal
- Examen
- • 12 páginas •
Bnsf-Maintenance of Way Operating Rules Exam Questions and Answers 
 
Track warrant control- method to authorize train movements or protect men and equipment on a main track within specified limits in a territory designated by the timetable. - AnswerTWC 
 
/.When used in relation to a manually operated switch or derail, a lock that can be locked or unlocked only by the craft or group of workers applying the lock. - AnswerEffective locking device 
 
/.A track extending through yards and between s...
Roadway Worker Class-Clerks Exam Questions and Answers
Roadway Worker Class-Clerks Exam Questions and Answers 
 
Adjacent Tracks - AnswerTwo or more tracks with track centers spaced less than 25 feet apart. 
 
/.Adjacent Controlled Track - AnswerA controlled track whose track center is spaced less than 25 feet from the track center of the occupied track. 
 
/.Controlled Point - AnswerA location where signals and/or other functions of traffic control system are controlled from the control machine. 
 
/.Controlled Track - AnswerMain track or siding un...
- Examen
- • 4 páginas •
Roadway Worker Class-Clerks Exam Questions and Answers 
 
Adjacent Tracks - AnswerTwo or more tracks with track centers spaced less than 25 feet apart. 
 
/.Adjacent Controlled Track - AnswerA controlled track whose track center is spaced less than 25 feet from the track center of the occupied track. 
 
/.Controlled Point - AnswerA location where signals and/or other functions of traffic control system are controlled from the control machine. 
 
/.Controlled Track - AnswerMain track or siding un...
Roadway Worker Protection 1 Exam Questions With Complete Solutions
Roadway Worker Protection 1 Exam Questions With Complete Solutions 
 
Inaccessible Track - Answerphysically preventing entry and movement of trains or equipment. 
 
Exclusive Track Occupancy - AnswerEstablishing on-track safety on controlled track in which movement authority of trains and other equipment withheld by train dispatcher. Is typically applied by diverting trains onto an adjacent bidirectional track. 
 
Foul Time - AnswerEmployee in charge request and is notified by Train Dispatcher ...
- Examen
- • 1 páginas •
Roadway Worker Protection 1 Exam Questions With Complete Solutions 
 
Inaccessible Track - Answerphysically preventing entry and movement of trains or equipment. 
 
Exclusive Track Occupancy - AnswerEstablishing on-track safety on controlled track in which movement authority of trains and other equipment withheld by train dispatcher. Is typically applied by diverting trains onto an adjacent bidirectional track. 
 
Foul Time - AnswerEmployee in charge request and is notified by Train Dispatcher ...